Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

State guides · Pennsylvania · Conservation districts

Fayette County Conservation District: 2026 E&S fees and thresholds

Fayette County’s district prices an E&S plan review by disturbed acre, starting at $525 for a site under an acre. Here are the 2026 numbers, the NPDES add-ons, how long an approval lasts, and who to call before any earthmoving.

Quick answer

2026 E&S review fee: $525 for 0 to 0.99 acre, $775 for 1 to 1.99 acres, $925 for 2 to 2.99 acres. A written plan is required from 5,000 sq ft. NPDES applies at 1 acre. An approved plan is valid for 3 years. Effective Jan. 1, 2026. Checked Nov. 22, 2026.

2026 E&S plan review fees

Disturbed acreageFee
0 to 0.99$525
1 to 1.99$775
2 to 2.99$925
3 to 3.99$1,050
4 to 4.99$1,175
5 to 5.99$1,300
6 to 6.99$1,450
7 to 7.99$1,575
8 to 8.99$1,700
9 to 9.99$1,825
10+$2,000 + $150 per disturbed acre over 10
Linear and utility projects$500 base + $0.10 per linear foot constructed

Extra disturbed areas, such as lay-down, compressor or storage areas, are priced at the disturbed-acreage rate.

NPDES and other fees

ItemFee
Fayette Clean Water Fund (NPDES filing, 1+ disturbed acres)$500 general permit; $1,500 individual permit
Commonwealth Clean Water Fund (state disturbed-acreage fee)$100 per disturbed acre, rounded up at 0.5 acre or more
Minor modification$100 each
Later revisions (after the second review still finds the plan inadequate)60% of the original E&S review fee
Timber harvesting$500 per calendar year

Each NPDES fee needs its own check, and none of them reduce the district’s review fee.

Thresholds

5,000 sq ft

From 5,000 sq ft to 0.99 acre of disturbance, the district says a written erosion control plan is required.

Special protection

If the site drains to High Quality or Exceptional Value waters, a written plan is required regardless of the area disturbed.

1 acre

One acre or more, or part of a larger common plan of development, needs an NPDES permit for construction stormwater (25 Pa. Code § 102.5).

Paying, submitting and how long approval lasts

Payment

Check or money order only. Cash isn’t accepted. Applications aren’t accepted without the right fee, and plans aren’t reviewed unless every component is submitted.

Timing

Projects submitted after 12 pm count as received the next business day. The fee schedule doesn’t state a review timeframe, so ask the district.

3 years

A plan review is valid for 3 years from the approval letter. If earthmoving hasn’t started by then, the review is invalid. If the job isn’t finished and stabilized within 3 years, the district may require a new plan and a new fee.

Fayette County Conservation District, 10 Nickman Plaza, Lemont Furnace, PA 15456. Phone (724) 438-4497. The district asks you to call before any earthmoving project. For work near or crossing a stream, wetland or waterbody, it points you to PA DEP at 412-442-4000.

See our Fayette County guide, the PA conservation district list and stormwater plan rules.

Planning estimate, not legal advice. Fees are from the district’s 2026 schedule, effective Jan. 1, 2026. Confirm with the district before you submit.

Questions

How much is an E&S review in Fayette County for under an acre?

$525 for 0 to 0.99 disturbed acre under the district’s schedule effective Jan. 1, 2026.

Do I have to pay NPDES fees on top of the review fee in Fayette County?

At 1 acre or more, yes. The county Clean Water Fund fee is $500 for a general permit or $1,500 for an individual permit, plus $100 per disturbed acre to the state, each on a separate check.

How long is a Fayette County E&S plan approval good for?

3 years from the approval letter date. If earthmoving doesn’t start in that time, the review is invalid.

Does Fayette County require an E&S plan for a small project?

A written plan is required from 5,000 sq ft of disturbance up to 0.99 acre, and at any size in a special protection watershed.

Sources: Fayette County Conservation District, 2026 E&S control plan fee schedule; Fayette County Conservation District, Erosion & Sediment Control; 25 Pa. Code § 102.5. Checked Nov. 22, 2026.

Muthler Landscaping & Construction · Lock Haven, PA

Building in central PA?

Our crews work central Pennsylvania from Lock Haven. If your job is in our area, we handle the grading, drainage and erosion control that go with a patio, wall or driveway.

Get a quoteAll PA districts

Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.

Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.

Cite as: Muthler Landscaping & Construction, “Fayette County Conservation District: 2026 E&S fees and thresholds,” https://muthlerlandscaping.com/state-guides/pennsylvania/conservation-districts/fayette-county-conservation-district/ (page updated November 22, 2026).