Lewisburg Borough, PA: Zoning, Stormwater Exemption and Floodplain Permit Rules
Lewisburg is a borough in Union County. The borough website carries a permits and zoning page, a forms page and a floodplain page. This guide covers only what those official pages and the forms they link to say, and it marks every gap as not stated on the municipality’s site. Pages and forms were checked November 23, 2026. For the county picture, see our Union County guide.
Quick answer
- Office: Borough Office, 55 South Fifth Street, Lewisburg, PA 17837, (570) 523-3614, office@lewisburgborough.org, Monday to Friday 8:00 am to 4:30 pm
- Permits the borough page names: solicitation, sidewalk repair or replacement, and driveways
- Floodplain: the borough’s flood page tells owners to get a permit from CK-COG before building
- Stormwater: the borough posts a Stormwater Management Plan Exemption Application tied to Chapter 290 of its code
- Decks, fences, sheds, retaining walls: not stated on the municipality’s site
Which office handles permits in Lewisburg Borough?
The borough’s Permits, Codes and Zoning page (last modified August 25, 2025) says permits are required for solicitation, sidewalk repair or replacement, and driveways within the borough. It does not say which office issues zoning or building permits, it does not name a Uniform Construction Code agency, and it lists no fees. It does say code enforcement issues can be investigated through the Central Keystone Council of Governments website, ckcog.com. The borough’s code is hosted on eCode360 under customer ID LE2375, and the posted zoning districts map file name indicates a November 2025 update.
The separate flood information page (last modified September 11, 2026) is more specific. It says to get a permit from CK-COG before you build, and it lists the CK-COG Zoning Department at (570) 522-1326. It also names Christa Dorman as the borough’s Zoning Officer at that same number for flooding and drainage concerns. Because the site does not list a separate building-permit office, call the borough office first and ask who issues the permit for your exact project.
What forms does the borough post?
The forms and applications page lists several land-use documents. No fee amounts are stated on any of them.
- Zoning Application, a printable PDF whose file name carries a 2020 date.
- Subdivision and Land Development Application, revised 2025.
- Stormwater Management Plan Exemption Application, covered below.
- HARB (historic district) application, updated July 2024, plus a historic district map. The page does not say what the board reviews.
The page does not list a building permit form, a driveway form or a fence form. The borough’s own forms and applications page is the place to confirm what is current.
How does the stormwater exemption application work?
The exemption form asks for relief from the stormwater requirements in Chapter 290 of the borough code. It records the impervious area and the disturbed area on a property. Under the form, a project adding less than 1,000 square feet of new impervious area and disturbing less than 5,000 square feet may be fully exempt. A project adding 1,000 to 5,000 square feet of impervious area, or disturbing 5,000 to 15,000 square feet, may still receive an exemption but must meet sections 290-17, 290-18 and 290-19. The form says the impervious area is counted from the ordinance adoption date of July 19, 2005, so past additions on the lot matter.
Every exemption request needs the form, a plan view or sketch plan, and proof that the proposed total impervious coverage fits the zoning district maximum. Larger requests add a water quality and recharge calculation page, a channel protection page and detail pages for each stormwater practice. The practices listed are an infiltration bed or seepage pit, a rain garden, a rain barrel or cistern and an infiltration trench, and the form allows other methods with documentation. Large nursery-stock trees earn a volume credit. The form says an exemption does not waive other permits, and it does not waive state NPDES requirements. The Borough Engineer reviews the application, and the applicant pays all engineering review and consulting fees; no dollar amount is stated. For the state side of this, read our PA stormwater plan rules page.
What do the floodplain pages say?
The flood page advises using contractors familiar with building in flood-prone areas. It also says replacement furnaces and other utilities must be raised 18 inches above the base flood level under borough ordinance. A separate document on substantial improvements says a project counts as substantial when an addition, alteration, repair or reconstruction costs more than 50 percent of the building’s value before the work. For an addition, only the addition must meet flood protection rules. For work on the original building, the whole building must. The borough may ask for a building appraisal before it issues a building permit. For flood hazard status of a specific property, the page points to SEDA-COG at (570) 524-4491.
How do state rules fit in?
Lewisburg’s site is quiet on decks, fences, sheds and retaining walls, so the state framework matters. Our Pennsylvania building code guide explains the Uniform Construction Code, and the UCC third-party agencies page explains how a council of governments can act as the permit agency. Our retaining wall permit guide, fence law page and shed permit page cover the statewide basics. A road frontage driveway may also touch PennDOT, covered on our driveway permit page. We are not saying any project is exempt; confirm with the borough.
Sources
All checked November 23, 2026. Permits, Codes and Zoning; Forms and Applications; Flood Information; Stormwater Management Plan Exemption Application; Substantial Improvements and Damage requirements; Floodplain Development Permit Requirements. Rules and fees change, so confirm with the borough.
FAQ
Who issues building permits in Lewisburg Borough?
The borough’s permits page does not say. Its flood page tells owners to get a permit from CK-COG before building, and CK-COG’s Zoning Department is listed at (570) 522-1326.
Does Lewisburg Borough require a driveway permit?
Yes. The borough’s permits page says permits are required for driveways, along with solicitation and sidewalk repair or replacement.
Can a small project skip the stormwater rules in Lewisburg?
The exemption form says a project under 1,000 square feet of new impervious area and under 5,000 square feet of disturbance may be fully exempt from Chapter 290, but you still file the exemption application with a sketch plan.
This is a plain-English summary, not legal advice. Call the borough to confirm requirements and fees before you price or start work.
Related: Pennsylvania guide · Union County · PA permit fees · PA building code · Stormwater plan rules.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “Lewisburg Borough, PA: Zoning, Stormwater Exemption and Floodplain Permit Rules,” https://muthlerlandscaping.com/state-guides/pennsylvania/lewisburg-borough-permits/ (page updated November 23, 2026).