Loganton Borough, PA: Zoning Permit Steps, Site Plan Triggers and Certificate of Occupancy

Loganton Borough is in Clinton County, with its borough office on North Mill Street. Its website gives a contact page for the zoning officer but almost no permit detail, so the useful rules live in the borough’s zoning chapter on eCode360, which the borough site links as its official code. This page paraphrases the borough’s government and zoning pages and the administration article of the zoning chapter, and it says where they are silent. Everything below was checked on November 23, 2026. For county-level offices, see our Clinton County guide.

Quick answer

  • Borough office: 141 North Mill Street, Loganton, PA 17747; 570-725-2393; Loganton@comcast.net
  • Zoning officer: Zoning@logantonborough.org (a separate message phone is printed on the zoning page)
  • Permit needed: before erecting, extending or altering a structure, or starting or changing a use
  • Decision time: 30 days, in writing; a missed deadline counts as approval
  • Permit life: 12 months, or until a certificate of occupancy issues

Who issues permits in Loganton?

The zoning chapter says Borough Council appoints a Zoning Officer who must meet Pennsylvania Municipalities Planning Code requirements. That officer enforces the chapter as written and cannot approve construction or uses that do not conform. Duties include reviewing and issuing permits, issuing nonconforming use certificates, posting fees, investigating complaints, inspecting permitted properties and keeping the code and zoning map current. The borough’s zoning page lists the officer by title and also names a three-member Zoning Hearing Board. It does not name a Uniform Construction Code agency. The borough code does list a Uniform Construction Codes chapter, so ask the borough who handles building permits and inspections.

When is a zoning permit required?

The code requires a permit before anyone erects, extends or alters a structure, and before starting or changing the use of land or a structure. It says certain items listed in the code are exempt and that routine maintenance and minor repairs do not need a permit. The borough pages do not mention decks, sheds, fences, patios or retaining walls by name. Treat any of those as a question for the zoning officer. Our shed permit guide, retaining wall permit guide and fence law guide give statewide background only.

Application steps and timing

  1. Submit an application, the required fees and any required site plan to the Zoning Officer. An application is not considered filed until all fees are paid.
  2. Wait for the decision. The officer must approve or deny within 30 days and notify you in writing. A denial must cite the specific provisions not met. If the officer misses the deadline, the application is treated as approved.
  3. Build within the permit window. A permit is valid for 12 months from issuance or until a certificate of occupancy is issued, whichever comes first, and can be extended up to 12 more months for a fee.
  4. When the work is done, apply for a certificate of occupancy. The property cannot be occupied or used until it is issued.

When a site plan is required

The code requires a site plan with the permit application for projects involving any of these:

  • Property within 100 feet of a floodplain.
  • Steep slopes.
  • A use that requires a parking lot.
  • Two or more primary uses or structures on one lot.
  • Non-residential or multi-family uses in the Village Residential District; single-family and two-family homes are excluded.

Projects already covered by a mobile home park or planned residential development plan do not need a separate site plan. Applicants submit three copies at a scale of 1 inch to 50 feet or larger. Required contents include owner and preparer information, a north point, a key map, lot sizes, the proposed use, topographic contours, boundaries and setbacks, existing and proposed structures, environmental features, streets and access points, parking and loading areas, lighting, landscaping, buffer yards and a stormwater compliance letter. The officer may send a copy to the Clinton County Planning Commission for comment and signs two copies on approval. For hillside patios, walls and regrading, the steep slope and floodplain triggers are the ones to ask about. Our stormwater plan rules guide covers the statewide framework.

Certificate of occupancy and enforcement

After the work is complete, the officer must inspect within 15 days and issue the certificate if the work complies. If it does not, the officer must send written notice citing the code provisions not met. After you correct the problems and the officer reinspects, the certificate must issue within two working days. If the officer fails to act within the required time, the application is treated as approved. Any person may file a signed written complaint about a suspected violation; the officer must record and investigate it, and enforcement notices follow the Municipalities Planning Code. Appeals of decisions follow that state law too. For structures that need a building permit, the UCC permit application guide and UCC inspections guide explain the statewide stages.

Fees

Council sets fees by resolution. The code says the schedule is posted in the Zoning Officer’s office and payable to the borough, and it covers zoning permits, nonconforming use certificates, variances, validity challenges, unified appeals and curative amendment requests. No dollar amounts or dates appear on the borough pages.

Conflicts and gaps to know about

  • The government page header shows 555-555-5555 and a sample email, which look like placeholders; use the 570-725-2393 office line instead.
  • The zoning officer email uses logantonborough.org while the office email uses comcast.net.
  • The site footer says 2021, though it lists a 2026 meeting schedule.
  • No office hours, permit forms or fee amounts are printed.
  • The borough code also lists stormwater, floodplain and streets chapters; call the borough to confirm whether they apply to your project.

Sources

Loganton Borough official pages, checked November 23, 2026: Borough government, Zoning Department and Zoning Officer. Borough code: ecode360.com/LO2818, zoning chapter administration article. Rules, hours and phone numbers change, so confirm before you start.

FAQ

How long does Loganton have to decide a zoning permit?

The zoning code gives the Zoning Officer 30 days to approve or deny in writing. If the officer misses the deadline, the application is treated as approved.

How long is a Loganton zoning permit valid?

Twelve months from issuance or until a certificate of occupancy is issued, whichever comes first. It can be extended up to 12 more months for a fee.

When does Loganton require a site plan?

For property within 100 feet of a floodplain, steep slopes, uses needing a parking lot, two or more primary uses on one lot, and non-residential or multi-family uses in the Village Residential District.

Does the borough say fences or sheds need a permit?

Not on the borough pages. The code requires a permit for erecting or altering a structure but exempts items it lists, so ask the zoning officer.

This is a plain-English summary of what the municipality’s own pages state, not legal advice. Call the municipality to confirm, and check the PA UCC permit rules for any structure that needs a building permit.

Related: Pennsylvania guide · Clinton County · Central PA permit fees · PA building code · UCC permit exemptions.

Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.

Cite as: Muthler Landscaping & Construction, “Loganton Borough, PA: Zoning Permit Steps, Site Plan Triggers and Certificate of Occupancy,” https://muthlerlandscaping.com/state-guides/pennsylvania/loganton-borough-permits/ (page updated November 23, 2026).