Mill Hall Borough, PA: Zoning Permit, Codes Agency Fees and the Excavation Permit
Mill Hall is a borough in Clinton County with its office on Beech Creek Avenue. Its Zoning and Codes page names a borough code officer and an outside firm, Codes Assessment Professionals, as the zoning, floodplain and building officer. The borough also runs its own excavation permit under a 1996 ordinance. This page paraphrases the borough’s Zoning and Codes page, its 2026 zoning and building fee schedule, Fee Resolution 2026-01C and the excavation permit form, and it says plainly where those documents are silent. Everything below was checked on November 23, 2026. For county-level offices, see our Clinton County guide.
Quick answer
- Zoning, floodplain and building officer: Codes Assessment Professionals, 19 West Water Street, Muncy, 570-651-9369
- Borough office: 215 Beech Creek Avenue, Mill Hall, 570-726-4008
- Zoning review and permit issuance: $60 on the 2026 fee schedule
- Deck, shed or concrete slab: listed at $0.15 per square foot; fences $0.15 per linear foot
- Digging in a street, highway or walkway over 2 ft x 2 ft: borough excavation permit, $25 application fee
Who issues what in Mill Hall?
The borough’s Zoning and Codes page lists three contacts. A Code Officer is listed at 570-660-6153. The Zoning, Floodplain and Building Officer is Codes Assessment Professionals, at 19 West Water Street, Muncy, PA 17756, 570-651-9369. The borough office is at 215 Beech Creek Avenue, Mill Hall, PA 17751, 570-726-4008. The page shows a last-modified date of September 23, 2026. It lists two applications, a zoning permit application and an excavation permit application. It does not mention a building permit or name a Uniform Construction Code agency in so many words, and it gives no office hours or application steps.
The fee documents fill part of that gap. The 2026 fee schedule is labeled with the codes agency’s initials, and Fee Resolution 2026-01C says the zoning fees are based on the borough-approved third-party agency fee schedule of Codes Assessment Professionals. So in practice the zoning and building paperwork runs through that firm, and the borough office handles its own excavation and street permits. Our UCC third-party agencies guide explains how outside agencies fit into the state code.
What the 2026 fee schedule lists for common projects
The fee schedule is a PDF with a “2026” label and an upload date of September 2026. Retaining walls, in-ground and above-ground pools, demolition and window or other non-structural replacement are also priced on the schedule, so check the PDF for those fees before you price them.
- State UCC fee: $4.50, applied to all construction.
- New additions and new stand-alone buildings, residential: $0.32 per square foot. The residential section says it includes the first inspection, plan review and Certificate of Occupancy.
- Alterations and remodeling, residential: $20 per $1,000 of construction estimate under $500,000, then $25 per $1,000 above $500,000 and $30 per $1,000 above $1,000,000.
- Decks, sheds and concrete slabs: $0.15 per square foot.
- Fences: $0.15 per linear foot.
- Zoning review and permit issuance: $60.
- Conditional use: $300.
- Certificate of occupancy without inspection: $150.
Two penalty-style fees matter to contractors. A second inspection after a failed one is charged at 50 percent of the initial permit cost, and a third or later inspection at 100 percent. A permit cancelled before work begins keeps 35 percent of the calculated fee for administrative and plan examination costs, and an inspection cancelled the same day, not ready at the scheduled time or without access carries a $125 fee. For the statewide inspection stages these fees attach to, see our UCC inspections guide.
Fee Resolution 2026-01C: streets, driveways and hearings
The borough council adopted Fee Resolution 2026-01C on September 22, 2026. It also covers fees that hit site work directly:
- Excavation permit: $25.
- Street opening permit: $750.
- Street excavation: $55.
- Driveway permit (PennDOT application): $150.
- Zoning or subdivision hearing, residential: $750. Dimensional variance and special exception hearings, residential: $750 each.
- UCC Board of Appeals hearing: $750.
- Certificate of compliance or occupancy: no charge with a permit, $150 without one.
The resolution says applicants pay the zoning fees plus the borough’s costs for engineer, zoning officer or solicitor review and inspections. Driveways on state roads are a PennDOT matter; see our PennDOT driveway permit guide.
The excavation permit step by step
The borough’s excavation form states that excavations larger than 2 feet by 2 feet require a permit under Ordinance No. 1996-4, and it lists the application fee as $25. The application asks for the excavation location, the reason for the permit and the contractor’s contact information. It also asks for the following:
- Proof of liability insurance submitted with the application.
- An erosion and sediment pollution control plan submitted to the Clinton County Conservation District, required for disturbance over 5,000 square feet, plus a copy of the district’s approval or disapproval.
- A copy of the NPDES permit approval or disapproval if the disturbance is over one acre.
- Whether the street, highway or walkway will be closed, with the location and length of closure.
- Payment of the Borough Engineer’s review fee, which is left blank on the form.
The Borough Secretary receives the application, the borough tells the applicant about possible involvement with underground facilities, and the Borough Council President signs the grant or denial. The form requires proper traffic control signage and lists no processing time, bond or restoration standard; it says the ordinance’s excavation, backfilling and surfacing rules are available on request at 570-726-4008. Call 811 before any dig; see our PA 811 guide and conservation district guide for the 5,000 square foot trigger.
Gaps and conflicts in the borough’s documents
- Excavation versus street fees: the resolution lists an excavation permit at $25, a street excavation charge at $55 and a street opening permit at $750. The documents do not say how they relate, so ask which applies to your trench.
- No effective date: the fee resolution gives an adoption date of September 22, 2026 but no effective date, and its amendment footnote lists a last amendment of August 10, 2026.
- Building permit not named: the Zoning and Codes page lists no building permit application, even though the fee schedule prices building work.
- Zoning application link: the page points to the codes agency’s own forms site rather than a borough file, and the link as published ends in a stray space code.
- Not stated in the borough’s pages: borough office hours, review times, setbacks, and whether a fence or patio needs zoning approval. Call the borough to confirm, and check the ordinance on eCode360.
For work that needs a building permit, the Pennsylvania Uniform Construction Code applies statewide. Our UCC permit exemptions guide and building permit lookup show what is exempt and who enforces the code elsewhere.
Sources
Mill Hall Borough official pages, checked November 23, 2026: Zoning and Codes, 2026 zoning and building fee schedule, Fee Resolution 2026-01C, Excavation permit application, and the borough Code and Zoning Ordinance on eCode360. Rules, hours and phone numbers change, so confirm before you start.
FAQ
Who handles zoning and building permits in Mill Hall Borough?
The borough’s page lists Codes Assessment Professionals of Muncy, 570-651-9369, as its zoning, floodplain and building officer. The borough office is at 570-726-4008.
How much is a zoning permit in Mill Hall?
The 2026 fee schedule lists zoning review and permit issuance at $60, and Fee Resolution 2026-01C says applicants also pay borough review and inspection costs. Building work is priced separately, for example $0.15 per square foot for decks and sheds.
When does Mill Hall require an excavation permit?
The borough’s form says excavations larger than 2 feet by 2 feet require a permit under Ordinance No. 1996-4. The application fee is $25, and proof of liability insurance goes with it.
Does the borough list a fence permit fee?
The fee schedule lists fences at $0.15 per linear foot. The borough pages do not say whether a fence also needs zoning approval, so ask the codes agency before building.
This is a plain-English summary of what the municipality’s own pages state, not legal advice. Call the municipality to confirm, and check the PA UCC permit rules for any structure that needs a building permit.
Related: Pennsylvania guide · Clinton County · Central PA permit fees · PA fence law · PA building code · UCC permit exemptions.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “Mill Hall Borough, PA: Zoning Permit, Codes Agency Fees and the Excavation Permit,” https://muthlerlandscaping.com/state-guides/pennsylvania/mill-hall-borough-permits/ (page updated November 23, 2026).
Get an email when your state’s rules change