Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

Harris Township, PA: Zoning Permit, CRCA Building Permit and Driveway Rules

Harris Township is in Centre County, with its office in Boalsburg. It runs a two-step permit path: the township issues zoning permits and road occupancy permits, while building permits come from the Centre Region Code Administration (CRCA). This page paraphrases the township’s zoning, permits, FAQ and stormwater pages and the CRCA page, and it says plainly where those pages are silent. Everything below was checked on November 23, 2026. For county-level offices and codes, see our Centre County guide.

Quick answer

  • Zoning permit: township zoning officer, 814-466-6228, zoning@harristownship.org
  • Zoning permit listed for: decks, sheds, swimming pools and poured concrete patios
  • Building permit: Centre Region Code Administration (CRCA), 814-231-3056
  • Driveway paving or right-of-way work: Road Occupancy/Driveway Permit, $50 stated on the form
  • Fences and retaining walls: not mentioned on the township’s zoning page

Who issues what in Harris Township?

The township page separates zoning from construction codes. The township’s Zoning Officer, listed as Todd Shea, is available weekdays from 8:00am to 4:15pm at 814-466-6228 or zoning@harristownship.org. The township office is at 224 East Main Street, Boalsburg, PA 16827, open Monday to Friday, 8am to 4:30pm, with a general email of harris@harristownship.org. The two published hour ranges differ slightly (4:15pm for the zoning officer, 4:30pm for the office), so call before you drive over.

Building permits are handled by CRCA. The township’s forms list names “Building Permit or Rental Permit (Centre Region Code Administration)” and links to crcog.net/crca. The township FAQ names the Centre Region Code Office as the township’s primary Sewage Enforcement Officer at 814-231-3056. The CRCA page itself lists its office at 2643 Gateway Drive, Suite #1, State College, PA 16801, open Monday through Friday, 8:00 AM to 12:00 PM and 1:00 PM to 5:00 PM. It also lists Harris Township among the municipalities it serves, along with College, Ferguson, Halfmoon and Patton Townships and State College and Bellefonte boroughs.

What does the township say needs a zoning permit?

The zoning page says a zoning permit is needed before building or changing a structure, and before starting or changing a use of a structure or property. The structures it lists are decks, sheds, swimming pools and poured concrete patios. It says no zoning permit is needed for simple maintenance or repairs. The page does not mention fences or retaining walls, so the township’s pages give no answer for those two. If your project is a wall or a fence, ask the zoning officer before work starts rather than assuming either way.

The FAQ adds practical detail:

  • Sheds: you need a zoning permit from the township, and you may also need a building permit from the Centre Region Code Office. The FAQ says the Zoning Officer can help you work out which when you submit the zoning application.
  • Decks and additions: you will likely need both a township zoning permit and a Centre Region Code Office building permit. The FAQ advises that you schedule an appointment with the Zoning Officer before beginning any work.
  • Driveway repaving: you may need a roadway occupancy permit if the work enters the township right of way. Call the township office and speak with the zoning officer first.

Our Pennsylvania shed permit guide and retaining wall permit guide explain the statewide background. Those pages are general; the township pages above are what control in Harris Township.

Road occupancy and driveway permits

The township says a Road Occupancy/Driveway Permit is required before any work in a township street’s right-of-way. Its examples are paving or repaving a driveway and installing or removing a sidewalk. The permit form (a PDF on the township site) asks for the applicant’s name and phone, the location of the work in the right-of-way, a description of the work, and the total new impervious surface area in square feet. It also asks for the start date, expected completion date, whether the improved road surface will be opened, the surface material for a new or resurfaced driveway, and the total existing impervious surface area, including structures, sidewalks and the driveway.

Two details on that form are worth knowing before you quote a job. First, it states a $50 fee submitted with the application. Second, some applications require review or inspection by the Township Engineer, and by signing the applicant agrees to reimburse the township for the engineer’s actual costs when those services are necessary. The form says township standards for driveways and other right-of-way work are available from the Zoning/Ordinance Enforcement Officer at (814) 466-6228.

The FAQ explains why the right of way matters. It says the right of way is the land beneath and around a road and is usually wider than the paved cartway. Local streets are required to have a 50-foot right of way with a 20-foot cartway, measured 25 feet from the road centerline on each side, though widths vary and the office can confirm yours. Residents own the right of way in front of their homes and maintain its grass, and the township may enter it for repairs without the owner’s permission. If any part of a planned driveway paving project falls within the right of way, the FAQ says to obtain a township permit before starting. For state roads, see our PennDOT driveway permit guide.

Stormwater in Harris Township

The township’s stormwater page lists no stormwater permits, applications or fees. It says the township requires new development, not individual homeowners, to have a stormwater management program, and it links the Harris Township Stormwater Management Ordinance as a PDF. It lists voluntary homeowner tips, such as keeping vegetation dense, mowing at 3 inches or taller, and using rain gardens, rain barrels and pervious pavers, with a pointer to stormwaterguide.org. It also offers a stormwater complaint form for reporting problems in local streams and illicit discharges.

For a hardscape or grading project, that means the stormwater page itself does not tell a homeowner what applies to a patio or driveway. The ordinance PDF does. See our stormwater plan rules guide and conservation district guide for the statewide framework.

Other township forms that may matter

The township’s permits and forms page also lists a Sign License Application, a Certificate of Nonconformity Application, an Application for Subdivision and Land Development Plan, an application for a zoning text amendment or zoning map change, and short-term rental applications. Low-impact home-based businesses need a zoning permit before starting; no-impact home-based businesses need no township approval. A 2026 Fee Schedule PDF is linked; no zoning permit fee is quoted here.

What the township does not state

  • Whether a fence or a retaining wall needs a zoning permit (not mentioned on the zoning page).
  • Zoning permit fee amounts (the page lists none; a separate fee schedule PDF exists).
  • Setback distances, height limits or lot coverage rules (these are in the zoning ordinance).
  • Review times for zoning permits or CRCA building permits.
  • Whether CRCA accepts applications online (its page does not say).

For any structure that needs a building permit, the Pennsylvania Uniform Construction Code applies statewide. Our UCC permit application guide and UCC inspections guide explain the usual stages, and building permit lookup shows who enforces the code in other townships.

Sources

Harris Township official pages, checked November 23, 2026: Zoning, Permits and forms, Frequently asked questions, Stormwater information, and the Road Occupancy/Driveway Permit form. Centre Region Code Administration: crcog.net/crca, checked November 23, 2026. Rules, hours and phone numbers change, so confirm before you start.

FAQ

Does a deck need a permit in Harris Township?

The township lists decks among the structures that need a zoning permit, and its FAQ says decks and additions will likely need both a township zoning permit and a Centre Region Code Office building permit. It advises scheduling an appointment with the Zoning Officer first.

Who issues building permits in Harris Township?

Building permits come from Centre Region Code Administration (CRCA), 2643 Gateway Drive, Suite #1, State College, 814-231-3056, according to the township and CRCA pages.

Do I need a permit to repave my driveway in Harris Township?

You may need a road occupancy permit if the work enters the township right of way. The township asks you to call the zoning officer first at 814-466-6228. The permit form states a $50 fee.

Does the township say fences need a permit?

Not on the township’s pages. The zoning page does not mention fences or retaining walls, so ask the zoning officer.

This is a plain-English summary of what the municipality’s own pages state, not legal advice. Call the municipality to confirm, and check the PA UCC permit rules for any structure that needs a building permit.

Related: Pennsylvania guide · Centre County · Central PA permit fees · PA fence law · PA building code · UCC permit exemptions.

Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.

Cite as: Muthler Landscaping & Construction, “Harris Township, PA: Zoning Permit, CRCA Building Permit and Driveway Rules,” https://muthlerlandscaping.com/state-guides/pennsylvania/harris-township-permits/ (page updated November 23, 2026).