Halfmoon Township, PA: Zoning and Building Permit Application, Driveway and Road Occupancy Forms
Halfmoon Township is in Centre County, with its municipal offices on Municipal Lane near Port Matilda. Its Applications and Permits page is a download-and-deliver system: you pull the form you need, fill it out and bring it to the municipal offices. The main permit form is actually a Centre Region Code Administration (CRCA) application that covers both zoning and building. This page paraphrases the township’s permits page, its zoning permit checklist and that form, and it says where the township’s pages stay silent. Everything below was checked on November 23, 2026. For county-level offices, see our Centre County guide.
Quick answer
- Township office: 100 Municipal Lane, Port Matilda, PA 16870; 814-692-9800; townshipclerk@halfmoontwp.us
- Hours printed: 7:00 AM to 3:30 PM (the page gives no days)
- Main permit form: Zoning and Building Permit Application, a CRCA form, 814-231-3056
- Other township permits: driveway, pave-cut and road occupancy, sign, home occupation
- Fee amounts: not on the page; see Resolution 2026-08
How does the permit process work in Halfmoon Township?
The township’s instruction is simple: download the form you need, complete it and bring it to the municipal offices for processing. The page says it offers most forms, so a form you need may be missing. It does not say which office issues zoning or building permits, and it does not name a Uniform Construction Code agency. The Planning and Zoning department is linked from the township’s government menu, but the permits page gives no contact details for it. The one clear signal comes from the form itself, which is issued by Centre Region Code Administration.
The CRCA form lists its office as 2643 Gateway Drive, Suite #2, State College, PA 16801, phone 814-231-3056, website centreregioncode.org. That differs from what our Harris Township guide records from the CRCA’s own page (Suite #1 at the same street address, and the crcog.net site). The form is an upload from June 2021, so the suite number and web address may simply be out of date. Confirm by phone before you deliver anything.
What the zoning permit checklist requires
The township’s checklist says it will not issue a permit if anything is missing. A complete submission has five parts:
- A fully completed CRCA building and zoning permit application.
- A site plan showing distances from the septic system and septic field, the well, property lines and existing structures.
- Plans. The checklist says CRCA requires two sets, but tells you to confirm with the zoning officer whether that applies to your project.
- Payment at the time you submit.
- Your signature and the date on every application form.
The checklist does not list which projects need a zoning permit; it only says the plan requirement depends on the project. A sample site plan is linked on the permits page, which is worth opening before you draw your own.
What the application form asks for and who reviews it
The form carries separate permit-number boxes for building, zoning, water and sewer. It asks for the owner, tenant, contractor and design professional, the tax parcel number and street address, and whether the property is commercial, residential or rental. It also asks for building height, stories and square footage, the sewage and water source (public or private on-lot), a declared cost of work and a written description. The improvement categories are new building, addition, alteration, repair or replacement, demolition, electrical only and sprinkler system only.
Review splits in two. A zoning plans examiner checks lot square footage, percent coverage, off-street parking and the front, rear and side setbacks. A codes plans examiner checks type of construction and use group. The form has blanks for the permit fee, deposit and balance, but lists no amounts. Taken together, the form implies this sequence: submit the application and a site plan, pass zoning and codes review, pay the fee, then receive the building permit. The form does not name the Uniform Construction Code and does not describe inspections.
Driveway, pave-cut and road occupancy permits
The township posts a separate Driveway Permit Application and a Pave-Cut and Road Occupancy Permit Application, which links a PennDOT utility sketch plan form. We did not read the text of either PDF, so we cannot state what triggers them or what they cost. If your driveway, trench or utility work touches a road, ask the township which form applies and whether the road is a township or state road. Our PennDOT driveway permit guide covers state roads.
Other forms on the page
The zoning section also lists conditional use, nonconforming use registration, sign permit, home occupation, rezoning, ordinance amendment, zoning hearing variance, address request and agricultural building exemption forms. Home occupation materials include a 2019 ordinance and a 2019 FAQ. Subdivision and land development applications are Word files on third-party Dropbox links rather than township-hosted PDFs.
What the township does not state
- Which projects (decks, sheds, fences, patios, retaining walls, grading) need a zoning permit.
- Which office issues permits and which UCC agency inspects.
- Fee amounts. The page points to Resolution 2026-08, the Township Schedule of Fees, without an adoption date.
- Review times and inspection steps.
- Days for the 7:00 AM to 3:30 PM office hours.
- Stormwater rules; the page does not mention them.
For any structure that needs a building permit, the Pennsylvania Uniform Construction Code applies statewide. Our UCC permit application guide, UCC inspections guide and shed permit guide are general; the township’s pages control in Halfmoon.
Sources
Halfmoon Township official pages, checked November 23, 2026: Applications and Permits, Zoning Permit Checklist and Zoning and Building Permit Application. The driveway and road occupancy PDFs and the fee resolution were not read. Rules, hours and phone numbers change, so confirm before you start.
FAQ
Where do I file a zoning and building permit in Halfmoon Township?
The township says to download the form and bring it to the municipal offices at 100 Municipal Lane, Port Matilda. The main form is a Centre Region Code Administration application.
What must a Halfmoon zoning permit submission include?
A completed application, a site plan showing the septic system, well, property lines and existing structures, plans if required, payment, and a signature and date on every form. The township will not issue a permit if anything is missing.
Does Halfmoon Township publish its permit fees?
Not on the permits page. It points to Resolution 2026-08, the Township Schedule of Fees, and gives no adoption date.
Does the township list a driveway permit?
Yes. It posts a Driveway Permit Application and a Pave-Cut and Road Occupancy Permit Application, but the page does not explain when each applies.
This is a plain-English summary of what the municipality’s own pages state, not legal advice. Call the municipality to confirm, and check the PA UCC permit rules for any structure that needs a building permit.
Related: Pennsylvania guide · Centre County · Central PA permit fees · PA building code · UCC permit exemptions.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “Halfmoon Township, PA: Zoning and Building Permit Application, Driveway and Road Occupancy Forms,” https://muthlerlandscaping.com/state-guides/pennsylvania/halfmoon-township-permits/ (page updated November 23, 2026).
Get an email when your state’s rules change
We re-check every entry against official sources. Tell us your state and we’ll email you when something changes.