Pennsylvania Home Improvement Contract: The 13 Required Terms (HICPA Section 7)
Pennsylvania’s Home Improvement Consumer Protection Act (Act 132 of 2008, 73 P.S. 517.1 et seq., “HICPA”) does not just say contractors should use a written contract. Section 7(a) says a home improvement contract is not valid or enforceable against the owner unless it contains a list of specific items. This page paraphrases the list below from the act as published by the General Assembly, checked on November 23, 2026. Verify against the current statute text before you build or rely on a form. This page covers the contents list; our companion page covers cancellation rights, arbitration clauses and clauses that let an owner void the contract.
Quick answer
- Where: HICPA Section 7(a), 73 P.S. 517.7(a)
- Rule: a contract missing the listed items is not valid or enforceable against the owner
- Thirteen items, including registration number, signatures, dates, work description, price, subcontractors, insurance, the toll-free number and a rescission notice
- Copy: the owner gets a completed copy at signing, at no charge (Section 7(c))
- Safety valve: a court may still allow payment for the reasonable value of requested work if denying it would be inequitable (Section 7(g))
What does Section 7(a) require in a contract?
| Item | What the act requires, paraphrased |
|---|---|
| 7(a)(1) | Written, legible, with the performing contractor’s registration number |
| 7(a)(2) | Signed by the owner (or agent or other contracted party) and by the contractor or its salesperson |
| 7(a)(3) | Contains the entire agreement, with copies of all required notices attached |
| 7(a)(4) | States the date of the transaction |
| 7(a)(5) | Contractor’s name, address and telephone number; a post office box alone is not an address |
| 7(a)(6) | Approximate starting and completion dates |
| 7(a)(7) | Description of the work, materials and specifications; changes need a signed written change order |
| 7(a)(8) | Total sales price, or a time-and-materials provision with its own required terms |
| 7(a)(9) | Down payment and any special-order materials advance, listed separately |
| 7(a)(10) | Names, addresses and phone numbers of all known subcontractors at signing |
| 7(a)(11) | Agreement to maintain the required insurance and the current coverage amount at signing |
| 7(a)(12) | The Bureau of Consumer Protection toll-free number from Section 3(b) |
| 7(a)(13) | Notice of the three-business-day right of rescission |
The items that cause the most trouble
Entire agreement and attached notices (item 3). Everything the parties agreed to belongs in the document, and the required notices travel with it. A separate proposal, a text thread or a verbal promise about a finish that never made it onto the page is the kind of gap this item targets.
Work description and change orders (item 7). The contract must describe the work, the materials and the specifications. After that, the specifications cannot change without a written change order signed by the owner and the contractor. The same idea shows up as a prohibited act in Section 9, which we cover on our prohibited acts page, where a material deviation without a dated, signed change order stating the price change is listed.
Price or time and materials (item 8). A contract can state a total sales price. If it uses a time-and-materials provision instead, the contractor must give the owner a written initial cost estimate before work starts, and the contract must state four things: the dollar value of that estimate, that costs may not exceed the estimate by more than 10 percent, the total potential cost in actual dollars (estimate plus the 10 percent), and that costs will not go above that figure without a signed written change order.
Down payment shown separately (item 9). The down payment and any advance for special-order materials must be listed separately. That matters because the deposit cap in Section 9 for contracts over $5,000 is tied to one-third of the price plus designated special-order materials. See our deposit limits guide for that rule.
Subcontractor list (item 10). Every subcontractor known at signing goes on the contract with name, address and phone. A post office box alone does not count as an address. If you bring in a sub after signing, ask a Pennsylvania attorney how to handle late additions to the list.
Insurance statement (item 11). The contract must agree to maintain the insurance described in Section 4(a)(1)(ix) and state the current coverage amount at signing. Under Section 4, that means proof of personal injury liability coverage of at least $50,000 and property damage coverage of at least $50,000, with a self-insurance attestation allowed in place of a policy if the Bureau finds it sufficient. Section 7(a)(11) is expressly subject to Section 12, which preserves certain local insurance standards adopted before January 1, 2006. The act’s own wording controls, so read Sections 4 and 12 before you fix the number on a form.
Registration number on more than the contract
Section 6 also requires the registration number in every advertisement distributed in Pennsylvania and on every contract, estimate and proposal given to a Pennsylvania owner. So the number belongs on your estimate before there is a contract at all. Registration itself is covered on our contractor registration page.
What happens if the contract is missing an item?
The act’s remedy is stated against the contractor: the contract is not valid or enforceable against the owner. Section 7(g) softens that. A contractor who complied with subsection (a) may still recover for work performed, measured by the reasonable value of services the owner requested, if a court finds that denying payment would be inequitable. Read closely, that safety valve is tied to compliance with subsection (a), so do not count on it to rescue a sloppy form. Whether a particular omission is fatal is a legal question for a Pennsylvania attorney, not something a web page can settle.
Practical checklist before you send a contract
- Walk the thirteen items against your form line by line; do not assume a template from another state or an older year covers them.
- Put your registration number on estimates, proposals and ads, not only the final contract.
- Give the owner a completed copy when it is signed (Section 7(c)).
- Separate the deposit from any special-order advance on the payment schedule.
- Attach the required notices so the document contains the entire agreement.
- Have a Pennsylvania attorney review the final form once, then reuse it.
Sources
Home Improvement Consumer Protection Act, Act 132 of 2008, Sections 4, 6, 7, 9 and 12, text published by the Pennsylvania General Assembly (PDF). Checked Nov. 23, 2026. Verify against the current statute text before relying on any item or number.
FAQ
Does a Pennsylvania home improvement contract have to be in writing?
Yes. Section 7(a)(1) says the contract must be written and legible and include the performing contractor’s registration number, or it is not valid or enforceable against the owner.
What must a time-and-materials contract state?
Under Section 7(a)(8), the dollar value of the written initial estimate, that costs may not exceed it by more than 10 percent, the total potential cost in dollars, and that no increase beyond that without a signed written change order.
Must the contract list subcontractors?
Section 7(a)(10) requires the names, addresses and telephone numbers of all known subcontractors at the time of signing.
Does the owner get a copy of the contract?
Yes. Section 7(c) requires the contractor or salesperson to give the owner a completed copy at signing, free of charge, with all required notices.
Questions about a project in central Pennsylvania? Muthler Landscaping & Construction LLC, 913 Bellefonte Avenue, Lock Haven, PA 17745, PA HIC #PA212584, (570) 397-9800.
This is a plain-English summary of what the official sources state, not legal advice. Statutes get amended and courts interpret them, so talk to a Pennsylvania attorney about your own situation before you rely on any of it.
Related: Pennsylvania guide · Contractor registration · Contractor deposit limits · HICPA prohibited acts.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “Pennsylvania Home Improvement Contract: The 13 Required Terms (HICPA Section 7),” https://muthlerlandscaping.com/state-guides/pennsylvania/hicpa-section-7-required-contract-terms/ (page updated November 23, 2026).