Milton Borough, PA: Zoning Permit Fee, Fence, Shed, Deck and Driveway Rules
Milton is a borough in Northumberland County. The borough website has a Permits and Applications page, and the forms and a property owner notice it links to say a good deal about what needs a permit. This guide paraphrases those documents and flags what the borough does not state. The permits page was last modified October 4, 2024, the property owner notice is dated May 16, 2025, and everything was checked November 23, 2026. For the county, see our Northumberland County guide.
Quick answer
- Zoning permit fee: $50 on the borough’s zoning permit application, with no zoning fee if a building permit is required for the same work
- Projects on the zoning form: garages, carports, sheds, decks, patios, porches, pools, fences, signs, additions and demolition
- Driveways: the borough’s notice says a permit is required to construct one
- Office: Borough Office, 2 Filbert Street, Milton, PA 17847, (570) 742-8759
- Retaining walls and stormwater: not stated on the municipality’s site
Who handles permits in Milton Borough?
The borough’s property owner notice says its Code Enforcement Office covers zoning, planning, floodplain, building and property maintenance. It names Doug Diehl as the Code Enforcement and Zoning Officer, with a phone number of (570) 742-8759 and hours of Monday through Friday, 8:30 am to 3:30 pm. The Borough Office is at 2 Filbert Street, Milton, PA 17847; the permits page lists office hours of Monday through Friday, 8:00 am to 4:00 pm, a fax of (570) 742-2322 and the phone number above. The permits page itself does not say who issues each permit and does not name a third-party agency, but the building permit form is a borough form and lists the borough phone and a Building Code Official as the plan reviewer.
What does the zoning permit application cover and cost?
The zoning permit application lists a $50.00 fee, and it says there is no fee if a building permit is required for the same work. The form covers new construction, additions, alterations, relocations and demolition, changes of use, signs, and accessory structures including garages, carports, sheds, decks, patios, porches, in-ground or above-ground pools and fences. Home occupations need a separate application.
Applicants provide a sketch plat plan showing the lot shape, existing and proposed buildings and distances to property lines. The form also asks for front, side and rear yard depths, building height and footprint, and the impervious surfaces such as sidewalks, open patios and driveways, noting whether each is brick, concrete or asphalt. Lot coverage is calculated as a percentage. Fence and pool entries ask for material, height and distance from the property line. The applicant also reports the estimated construction cost, including their own labor, plus the contractor’s name and phone number. The borough does not print its setback or height limits on the form, so those numbers are not stated there.
Timing is spelled out. Work must begin within six months and finish within 24 months of issuance unless the Zoning Hearing Board sets other limits, or the permit becomes void. Any aggrieved party may appeal within 30 days of issuance. The form adds that it does not replace other local, state or federal permits.
How does the building permit work?
The borough’s building permit application is a Uniform Construction Code form. It offers permit types including new building, addition, alteration, remodeling, demolition, change of use and trade permits for electrical, mechanical, HVAC and plumbing. A submission includes three site plans and three sets of construction drawings, proof of liability insurance and proof of workers’ compensation insurance, plus a plan review checklist. The form’s fee amounts are blank, so the building permit fee is not stated on the municipality’s site. Our UCC permit application and permit exemptions pages cover the state side.
What does the borough say about floodplain, fences, pools and driveways?
The property owner notice says that in the floodplain, a permit is required for any man-made development, and it lists fencing, sheds, garages, pools and playsets as floodplain development that must be anchored against flotation, with flood vents installed as required. Development in the floodway needs borough, PA DEP and engineering approvals. The notice also says permits are required for sidewalk replacement, driveway construction and placing dumpsters on roadways. For pools, hot tubs and spas holding more than 24 inches of water, it requires a barrier at least 48 inches high with a self-closing, self-latching gate that swings away from the pool. Compare that with our PA pool fence law page. If a property is in a floodplain, the zoning form requires a Floodplain Permit Addendum Review checklist, and its office section treats improvements over 51 percent of building value as substantial.
Which other forms are posted?
- Zoning conditional use, special exception and variance applications.
- A mobile food vendor zoning permit application.
- Required solar permit information.
- A Floodplain Permit Addendum Review checklist.
The permits page lists no stormwater plan form and no retaining wall requirements. For those, see our retaining wall permit guide and stormwater plan rules, then ask the borough.
Sources
All checked November 23, 2026. Permits and Applications; Zoning Permit Application; Building Permit Application; Property Owners Helpful Information; Floodplain Permit Addendum Review Checklist. The permits page links an older 2021 Word version of the zoning form. Fees change, so confirm with the borough.
FAQ
How much is a zoning permit in Milton Borough?
The borough’s zoning permit application lists a $50.00 fee, with no zoning fee if a building permit is required for the same work.
Does Milton Borough require a permit for a shed or fence?
The zoning permit application lists sheds and fences among the accessory structures it covers, and the borough’s notice lists both as floodplain development needing permits and anchoring.
Do you need a permit for a driveway in Milton?
Yes. The borough’s property owner notice says a permit is required to construct a driveway.
This is a plain-English summary, not legal advice. Call the borough to confirm requirements and fees before you price or start work.
Related: Pennsylvania guide · Northumberland County · PA permit fees · PA building code · PA shed permits.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “Milton Borough, PA: Zoning Permit Fee, Fence, Shed, Deck and Driveway Rules,” https://muthlerlandscaping.com/state-guides/pennsylvania/milton-borough-permits/ (page updated November 23, 2026).
Get an email when your state’s rules change
We re-check every entry against official sources. Tell us your state and we’ll email you when something changes.