Centre Hall Borough, PA: Building, Zoning Permit Steps and Fees
Centre Hall is a borough in Centre County, and it runs permit intake through its own Borough Office. This page paraphrases the borough’s Permit Applications page (dated April 27, 2026), its Borough Employees and ordinance pages and the Keystone Inspection Agency application that Benner and Spring Townships also post, all checked on November 23, 2026. The borough’s site is short, so this page is short on specifics and says where it is. County offices are on our Centre County guide.
Quick answer
- Where to apply: Borough Office, 134 North Hoffer Avenue, 814-364-1772
- Applications posted: building permit and plan examination, zoning permit, water tap
- Building permit projects named: decks, porches, driveways, sheds, signs and more
- Fees: calculated case by case; call the office for the amount
- Fences: not mentioned on the permit page
How do you apply in Centre Hall Borough?
The borough’s Permit Applications page lists three applications: building permit and plan examination, zoning permit, and water tap (water service). It describes the building permit as covering projects such as decks, porches, driveways, sheds and signs, and the list ends with “etc.”, so other projects are implied but not named. The page says the Borough Office processes applications and collects fees.
The steps it gives are short:
- Print and complete the permit application.
- Contact the Borough Office to get the calculated fee.
- Submit the completed application and the fee to the Borough Office.
No fee amounts are posted. The page says fees are calculated case by case, so you have to contact the office for the figure. It does not state accepted payment methods, review times or inspection procedures.
Contact details and who staffs the office
The Borough Office is at 134 North Hoffer Avenue, Centre Hall, PA 16828. The mailing address is PO Box 54, Centre Hall, PA 16828-0054. The phone is 814-364-1772 and the email is CHBW@verizon.net. The borough’s pages list no office hours. The borough’s employee page lists two maintenance staff, Kenny Strouse and Philip Orndorf, Jr., with the roles of code enforcement and zoning officer among their titles, and a Borough Secretary/Treasurer, Angela Mundy. It lists no direct phone numbers or emails for them. Borough Council meets the second Thursday of each month at 7pm at the Borough Building.
What the building and zoning applications are
The building permit form linked from the borough has a file name that references Keystone Inspection Agency, but the page does not describe that agency’s role. Benner and Spring Townships post the same Keystone application, and on those copies the agency is listed at 248 N. Main Street, Suite 1, Pleasant Gap, PA 16823, office phone 814-359-3333. That tells you who prepared the form, not who inspects in Centre Hall, so ask the Borough Office which agency applies.
On the Keystone application as posted by those townships, the permit covers new construction, addition, alteration, repair, relocation, change of use, plumbing, mechanical, electrical, sprinkler system, demolition and swimming pool. For residential work it asks for approved zoning, water, sewer and driveway permits, two sets of construction documents, a detailed site plan, and a certificate of insurance. It states a minimum footer depth of 36 inches below grade, including for decks, and has the applicant sign to follow the Pennsylvania Uniform Construction Code (Act 45 of 1999). Our UCC third-party agencies guide explains how municipalities use outside agencies, and our UCC permit application guide covers what a typical filing includes.
The zoning permit application is a separate PDF on the borough site. Ask the Borough Office for its fields, setbacks and fees.
Zoning, ordinances and the zoning map
The borough’s ordinance page lists zoning as Chapter 27 and links a Zoning Map PDF posted in April 2026. It also lists Chapter 2 on animals, Chapter 7 on recreational fires, including screened chimineas and fire pits with screens, and Chapter 19 on signs. The page does not summarize any of those chapters, so setbacks, height limits and what counts as a structure sit in Chapter 27. If you are quoting a deck, shed or driveway job in the borough, get the zoning district from the map and the rules from Chapter 27 or the borough office before you commit to a layout. See our property line guide for how to locate the line before you measure setbacks.
Driveways, utilities and digging
The permit page lists driveways among building permit projects, which is the only driveway language on the borough’s pages. It does not say whether the borough or PennDOT controls the road you connect to. For state roads, see our PennDOT driveway permit guide. Any excavation also falls under Pennsylvania’s one-call rules; see our 811 dig law guide.
What the borough does not state
- Fee amounts (calculated case by case, not posted).
- Whether fences or retaining walls need a permit (not mentioned on the permit page).
- The name and role of the UCC agency, if any, for the borough.
- Office hours, review times and inspection steps.
- Setbacks and size thresholds (in Chapter 27, not summarized).
We never treat silence as permission. If the borough page does not mention your project, call 814-364-1772 and ask before work starts.
Sources
Centre Hall Borough official pages, checked November 23, 2026: Permit Applications, Borough Employees, and FAQ About Ordinances. The Keystone Inspection Agency application details come from Benner Township’s posted copy, checked November 23, 2026. Rules and phone numbers change, so confirm before you start.
FAQ
Where do I apply for a building permit in Centre Hall Borough?
The borough says the Borough Office processes applications and collects fees. Print the application, call 814-364-1772 for the calculated fee, and submit both to the office.
Does a deck need a permit in Centre Hall Borough?
The borough lists decks, porches, driveways, sheds and signs among the projects covered by its building permit application.
What does a permit cost in Centre Hall Borough?
No amounts are posted. The borough says fees are calculated case by case and you must contact the office.
Does the borough say fences need a permit?
Not on the borough’s permit page. Fences are not mentioned, so ask the Borough Office.
This is a plain-English summary of what the municipality’s own pages state, not legal advice. Call the municipality to confirm, and check the PA UCC permit rules for any structure that needs a building permit.
Related: Pennsylvania guide · Centre County · Central PA permit fees · PA shed permits · PA building code · UCC permit exemptions.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “Centre Hall Borough, PA: Building, Zoning Permit Steps and Fees,” https://muthlerlandscaping.com/state-guides/pennsylvania/centre-hall-borough-permits/ (page updated November 23, 2026).
Get an email when your state’s rules change
We re-check every entry against official sources. Tell us your state and we’ll email you when something changes.