East Buffalo Township, PA: Zoning, CKCOG Building Permits and the $50 Driveway Permit Rules
East Buffalo Township is in Union County, and its township office is on Fairground Road in Lewisburg. Building and zoning permits do not come from that office. The township’s Code Enforcement and Planning and Zoning pages point to the Central Keystone Council of Governments (CKCOG), which sits at a separate Lewisburg address with its own phone. The township does publish one permit in detail: the driveway permit and its ordinance. This page paraphrases the township’s pages and that ordinance and says where they are silent or inconsistent. Everything below was checked on November 23, 2026. For county-level offices, see our Union County guide. Neighboring Buffalo Township has its own page: Buffalo Township (Union County).
Quick answer
- Township office: 589 Fairground Road, Lewisburg, PA 17837; 570-523-6320; info@ebtwp.org (no hours printed)
- Building and zoning permits: CKCOG, 1610 Industrial Boulevard, Suite 400A, Lewisburg; 570-522-1326; permits@ckcog.com
- Driveway or work in a road right-of-way: township permit, $50 by check
- Zoning permit: the township says one is required but names no form or office
- Fences, patios, sheds, retaining walls: not addressed on the township’s pages
Who issues what in East Buffalo Township?
The Code Enforcement page says building permit forms and applications come from the building permit and construction code enforcement staff at CKCOG. It lists the codes adopted in Chapter 5 of the township ordinances: building, plumbing, fire prevention, national electric and existing structures. It does not name a Uniform Construction Code agency, and it gives no application or inspection steps. It also states that a zoning permit is required in the township, without saying where to get one. The Planning and Zoning page fills in part of that: it lists CKCOG as the department contact and says permit forms can be downloaded from CKCOG’s forms page.
CKCOG’s own site says zoning approval and floodplain compliance are needed before a building permit is issued. It lists Building Code Department hours of Monday to Friday, 7:30 am to 4:30 pm and Zoning Department hours of 8:30 am to 4:30 pm, effective July 13, 2026, plus toll-free (877) 457-9401. Keep the two numbers straight: the township’s 570-523-6320 is the municipal office, and CKCOG’s 570-522-1326 handles permits.
Driveway permit: what the ordinance requires
The township’s applications page links a driveway permit application bundled with the ordinance (Ordinance 289, Chapter 21, Part 5), form revision June 2024, ordinance effective December 14, 2006. Any work in a public road’s right-of-way needs the permit first, including building or rebuilding a driveway or changing the grade, line or width of a shoulder, berm or drainage area. The owner or the owner’s authorized agent applies. The Roadmaster or Assistant Roadmaster signs, and the Board of Supervisors can grant exceptions after a hearing with 20 days of written notice. The fee is $50 by check payable to the township.
The application needs a drawing of existing and proposed buildings, the driveway, distances to property lines and streets, and stormwater details such as a swale or pipe. The standards, paraphrased:
- Setbacks: at least 5 feet from side and rear lot lines and 15 feet from the front line, except where the driveway crosses to reach the street.
- Intersections: centerline at least 50 feet from any street intersection.
- Sight triangle: nothing over 2.5 feet high, except approved mailboxes and newspaper boxes.
- Drainage: keep it flowing with a pipe of at least 15 inches in diameter or a swale across the driveway; runoff may not be sent onto neighbors except through an approved system.
- Width where it meets the road: at least 8 feet for single use and 16 feet for multiple use.
- Surface: it meets the existing road edge, is sealed there and uses the same paving as the street within the right-of-way; beyond the right-of-way, a dustless material approved by the township.
- Angle: 90 degrees where possible and never under 60. The printed text says percent, which looks like a typo.
- One entrance per lot per street frontage, plus a 10-by-20-foot turnaround so vehicles do not back into the street.
- Shared driveways between two abutting lots need a maintenance and use agreement, recorded with the Union County Recorder of Deeds within 10 days of permit issuance.
For Commonwealth roads, work must meet PennDOT standards, and copies of any PennDOT permit go to the township. Violations can bring a fine of up to $1,000 and/or imprisonment as summary offenses allow. The document does not address inspections or bonding. See our PennDOT driveway permit guide for state roads. The applications page also links a right-of-way occupancy permit from March 2026; call the township to confirm whether it applies to your job.
Zoning, districts and fees
The Planning and Zoning page lists the zoning districts but not which projects need a permit. The districts are Agricultural Preservation, Agricultural Residential, Bucknell University, General Commercial, Highway Commercial, Industrial, Low, Medium and Urban Residential, and Woodland Preservation. The linked zoning map is revision 2016 and was uploaded in 2021, and the page does not say whether it is current. Building permit fees are not published; the code page says only that a fee schedule is kept at the township office. The applications page lists no fees besides what the driveway form states, and it was last modified April 17, 2026.
Conflicts and gaps to know about
- The township names no form, office or fee for the zoning permit it says is required.
- The property maintenance code was adopted in 2013, but the linked copy is the 2018 edition.
- Fences, decks, sheds, patios, retaining walls and grading are not addressed on the township pages.
- The zoning page was last modified in October 2024 but links a 2026 recycling schedule.
- No township office hours are printed.
For any structure that needs a building permit, the Pennsylvania Uniform Construction Code applies statewide. Our UCC permit application guide and UCC inspections guide are general; the township’s pages control in East Buffalo.
Sources
East Buffalo Township official pages, checked November 23, 2026: Code Enforcement, Planning and Zoning, Applications and Permits and the Driveway Permit Application with Ordinance. Central Keystone Council of Governments: ckcog.com, checked the same day. Rules, hours and phone numbers change, so confirm before you start.
FAQ
Who issues building permits in East Buffalo Township?
The township’s pages direct applicants to Central Keystone Council of Governments (CKCOG) in Lewisburg, 570-522-1326, for building permit forms and applications.
How much is the East Buffalo driveway permit?
The driveway permit application states a $50 fee, paid by check to the township. It is required before any work in a public road right-of-way.
How far must a driveway be from my property line?
The ordinance requires at least 5 feet from side and rear lot lines and 15 feet from the front lot line, except where the driveway crosses to reach the street.
Does the township say fences or patios need a permit?
Not on the township’s pages. The township says a zoning permit is required but does not list projects, so ask CKCOG before work starts.
This is a plain-English summary of what the municipality’s own pages state, not legal advice. Call the municipality to confirm, and check the PA UCC permit rules for any structure that needs a building permit.
Related: Pennsylvania guide · Union County · Central PA permit fees · PA building code · UCC permit exemptions.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “East Buffalo Township, PA: Zoning, CKCOG Building Permits and the $50 Driveway Permit Rules,” https://muthlerlandscaping.com/state-guides/pennsylvania/east-buffalo-township-permits/ (page updated November 23, 2026).