Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

Penn Township (Snyder County), PA: Zoning Permit, Impervious Limits and Stormwater Duties

Penn Township is a township in Snyder County, Pennsylvania, with its offices on Clifford Road near Selinsgrove. Pennsylvania has several townships named Penn, so this page covers only the one whose website, penn-township.net, names Snyder County and a Selinsgrove address. The township’s Zoning Permit Application (marked revised 6/2026) is the main document we could read. Everything here was checked November 23, 2026. For the county, see our Snyder County guide.

Quick answer

  • Submit to: Zoning Enforcement Officer, Penn Township, 228 Clifford Road, Selinsgrove, PA 17870
  • Contact: 570-374-4778, fax 570-374-4931, penntwp@ptd.net
  • Office hours on the township site: Monday to Friday 8:30 am to 2:00 pm, other times by appointment
  • Projects on the form: new home, addition, garage, shed, pole barn, in-ground and above-ground pools, signs, agricultural buildings and manufactured homes
  • Zoning fee amount and UCC building permit agency: not stated on the municipality’s site

What does the Penn Township zoning permit cover?

The application lists these project types: new home construction, an addition, a garage, a shed, a pole barn, an in-ground pool, an above-ground pool, signs, an agricultural building, a commercial building, a manufactured or mobile home (new or used) and an other category for anything not listed. New homes, additions and commercial buildings carry additional submission requirements. Applicants circle one of the township’s zoning districts, which the form labels RR, R1, R2, VC, NC, HC, I, C, AC and WPOD.

The township website’s home page links to Zoning Office information, a list of zoning officers, zoning maps and the Zoning Hearing Board. Those pages describe offices and maps; the home page does not describe the permit process itself, so the application form is the better guide. The site also shows a 2009 copyright and some older content, so confirm current details with the office.

What do you have to submit?

  • A completed application with applicant, landowner (if different) and contractor information, plus the contractor’s workers’ compensation number and its expiration date.
  • Tax map, parcel and lot numbers, lot size, and access road information, including whether the road is a state, township or private road and its name and number.
  • A drawing of the proposed work, on the back of the form or as a separate sheet, showing setbacks measured from the actual property lines, including the road centerline, both sides and the rear.
  • A plot plan for certain construction types.
  • Driveway, sewer and water permit numbers, if they apply.
  • Existing and proposed dimensions (length, width, height and stories), the value of the project, and project-specific details such as steep slopes of 15 percent or more, the floodplain area and zone, parking, and the number and size of signs.
  • Documentation showing compliance with township ordinances covering zoning, subdivision and land development, sewage facilities, highway access, stormwater management, flood plain management and any other applicable rules.

The form has a fee field, but the township’s site does not give an amount or a fee schedule, so the fee is not stated on the municipality’s site. The office-use boxes record a permit number, the fee and a check number. For driveway permits along state roads, see our PennDOT driveway permit page.

What stormwater duties does the form put on you?

This is the most useful part of the form for site contractors. The applicant initials five statements. First, driveways and roads must not be built in a way that concentrates runoff onto a road or an adjacent property. Second, the development must not create runoff problems for roads or neighbors. Third, the developer must correct any stormwater problem on a road that the development causes, such as ponding, icing or sediment washout, at the developer’s expense. Fourth, the developer must repair stormwater damage to adjacent properties and fix the underlying conditions, also at the developer’s expense. Fifth, prior Board of Supervisors approval is required before any improvements that would exceed the maximum impervious coverage shown on the application, and the form says that includes placing stone.

That last item matters for patios, gravel drives and parking pads, because the form specifically names placing stone. The form does not print the coverage limit; it depends on the zoning district, so ask the office for the number before you quote a job. For the state rules that sit behind these duties, read our PA stormwater plan rules and PA drainage law pages.

Inspections, signature and what the form does not say

The applicant’s signature authorizes the Zoning Enforcement Officer to enter the property and inspect construction at any time during the project and up to 30 days after completion. The form states that falsifying information makes the application and permit null and void. It does not name the zoning officer, list office hours for the zoning officer, mention a review deadline or name a Uniform Construction Code agency, and the only other permit fields are driveway, sewer and water permit numbers. The township’s home page does not name a building permit agency either, so ask the office who handles UCC permits for your project; our UCC third-party agencies page explains the general setup. We are not stating that any project is exempt.

The township office is at 228 Clifford Road, Selinsgrove, PA 17870, with phone 570-374-4778, fax 570-374-4931 and email penntwp@ptd.net. The site lists office hours of Monday to Friday, 8:30 am to 2:00 pm, and says other hours are available by appointment. The site also links an Applications page, elevation certificates and flood information documents.

Sources

All checked November 23, 2026. Penn Township Zoning Permit Application (revised 6/2026); Penn Township Supervisors Office website. Fees change, so confirm with the township.

FAQ

Where do you submit a Penn Township zoning permit application?

To the Zoning Enforcement Officer, Penn Township, 228 Clifford Road, Selinsgrove, PA 17870. The township phone is 570-374-4778.

Does placing stone need approval in Penn Township?

The township’s form says prior Board of Supervisors approval is required before any improvements that would exceed the maximum impervious coverage on the application, and it says that includes placing stone.

How much is a Penn Township zoning permit?

The fee amount is not stated on the municipality’s site. The form has a fee field with no amount.

This is a plain-English summary, not legal advice. Call the township to confirm requirements and fees before you price or start work.

Related: Pennsylvania guide · Snyder County · PA permit fees · PA shed permits · PA building code.

Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.

Cite as: Muthler Landscaping & Construction, “Penn Township (Snyder County), PA: Zoning Permit, Impervious Limits and Stormwater Duties,” https://muthlerlandscaping.com/state-guides/pennsylvania/penn-township-snyder-county-permits/ (page updated November 23, 2026).