Hardscaping · The Muthler Install Standard · Version 1.0, November 2026
Retaining Wall Detail and Paver Base Specs We Build To
Muthler builds to a written standard: 8 in. of compacted 2B stone under patios and walks, 12 in. under driveways, lifts of 3 in. or less, geogrid as long as the wall is tall, and a 14 in. stone drain behind every wall. Hand it to any contractor and ask for the same.
Each retaining wall detail and base spec below sits next to the published minimum. Standard owner: Thayne Muthler, Muthler Landscaping and Construction LLC.
- Patio or walk: 8 in. compacted 2B base, lifts of 3 in. or less
- Driveway: 12 in. compacted 2B base
- Wall pad: 8 in. of 2B, one full course buried
- Wall drain: 14 in. of clean 2B, 4 in. pipe, outlets every 30 ft or less
- Geogrid: full wall height, 6 ft minimum, layer at least every 2 courses
- Engineer: over 4 ft, tiered, or carrying a driveway, building or slope
What is the Muthler Install Standard?
It is the list of numbers our crews build to. Where the industry publishes a minimum, ours is at or above it, and where sources disagree we use the strictest figure. Minimums come from CMHA, NCMA, Belgard, Unilock and Allan Block, named in each row and listed under Sources. The Muthler column is our own standard. It is a build standard, not a stamped engineering design. Where a block or paver maker’s instructions are stricter than ours, we follow the maker.
| What | Published minimum | Muthler standard |
|---|---|---|
| Paver patios and walks | ||
| Compacted base, patio or walk | 4 in. on well-drained soil (CMHA). Belgard digs 10 to 12 in. in all in freeze-thaw climates. | 8 in. of 2B. 10 to 12 in. over soft, wet or filled ground. |
| Compacted base, driveway | 6 in. for a residential driveway (CMHA, Belgard) | 12 in. of 2B |
| Lift thickness | 4 to 6 in. with a 7,000 lbf plate (CMHA); 2 to 4 in. (Belgard) | 3 in. or less, at least 3 passes per lift |
| Subgrade | 98% of standard Proctor (CMHA) | 98%. Soft spots dug out and refilled with 2B. |
| Bedding layer | 1 in. of ASTM C33 concrete sand (CMHA, Belgard) | 1/2 in. of screeded screenings over separation fabric. Where a paver maker’s guide calls for something else, we follow the maker. |
| Base flatness before bedding | 3/8 in. over 10 ft (CMHA) | 1/4 in. over 10 ft |
| Surface pitch | 1.5% (CMHA); 2% (Belgard) | 1/4 in. per ft (about 2%), away from the house |
| Edge restraint | At least 1 in. vertical face (CMHA) | Every open edge, spiked about every 12 in. |
| Retaining walls | ||
| Leveling pad | 6 in. thick (NCMA, Belgard, Unilock) | 8 in. of 2B, 12 in. past the front of the block |
| Buried course | 6 in. below finished grade (Belgard) | One full course |
| Drainage zone behind the block | 12 in. (Belgard, NCMA); 14 in. (Unilock) | 14 in. of clean 2B |
| Backfill lifts | 6 to 8 in. (NCMA); 8 in. or less (Allan Block) | 6 in. or less, at least 3 passes |
| Compaction near the face | Hand-operated within 3 ft (NCMA); no self-propelled within 4 ft (Belgard) | Plate compactor only within 4 ft. No heavy equipment within 5 ft of the finished face. |
| Wall stacked ahead of backfill | 18 in. (Unilock) | 16 in. (2 courses) |
| Geogrid length | 60% of wall height and at least 4 ft (NCMA) | Full wall height, buried course included, and at least 6 ft |
| Fill over grid before machines cross | 6 in. (NCMA, Belgard) | 8 in. |
| Drain pipe pitch | 2% for secondary pipes (NCMA) | 1/4 in. per ft (about 2%) |
| Outlets to daylight | Every 20 to 50 ft (NCMA); every 50 ft (Belgard, Allan Block) | Both ends and every 30 ft or less |
| Engineer | Varies. Unilock’s guide names 36 in.; NCMA defers to local code. | Over 3 ft: block maker’s design chart and geogrid. Over 4 ft, tiered, or carrying a driveway, building or slope: stamped by a PA engineer. |
What does a retaining wall detail look like?
A retaining wall detail is a cross-section that shows every layer under, in and behind the wall with its size. This is ours: a segmental block wall with 3 ft 8 in. of exposed face, drawn in the order the layers go in. Our guides cover each step in depth: the trench and leveling pad, the first course, drainage stone, backfill and compaction and cap installation.
- 8 in. of compacted 2B pad, 12 in. past the front of the block
- One full course buried
- First course dead level, front to back and side to side
- Caps glued with two beads of construction adhesive
- 14 in. of clean 2B against the block
- 4 in. perforated pipe at the heel, 1/4 in. per ft to daylight
- 8 in. of topsoil on top, pitched 2 to 5% away from the wall
- Fill placed in lifts of 6 in. or less
- At least 3 compactor passes on every lift
- Plate compactor only within 4 ft of the face
- Never more than 2 courses of block ahead of the fill
Our retaining wall base depth guide explains how the trench and pad depths are worked out, and our retaining walls guide is the hub for the rest.
How much geogrid goes in a Muthler wall?
Geogrid goes the full height of the wall back into the hill, never under 6 ft, with a layer at least every 2 courses. NCMA’s floor is 60% of the wall height and at least 4 ft. The table has every rule, and the plan below shows one layer from above. Our geogrid placement guide covers direction and pinning, and when a wall needs geogrid explains the thresholds.
| Rule | Muthler standard | Published reference |
|---|---|---|
| When it goes in | Every wall with more than 3 ft of exposed face. Any wall with a driveway, slope or building above it, at any height. | Our standard. Block makers publish charts by soil and slope; the chart can ask for more. |
| Length | Full wall height, buried course included, and never under 6 ft. | NCMA: 60% of height, 4 ft minimum. |
| Spacing | A layer at least every 2 courses on 8 in. block (16 in. maximum). The top layer is within 16 in. of the top of the block. | Our standard. NCMA, Belgard and Unilock leave spacing to the design. |
| Coverage | 100% of the wall length. Rolls butted edge to edge, no gap over 1 in. Overlaps at curves and corners get at least 3 in. of fill between layers. | NCMA: no seams or overlaps at the units; 3 in. of soil between overlapping layers at curves and corners. |
| Position | Front edge 1 in. back from the face. Strong direction runs back into the hill, square to the face. | Belgard and Unilock: 1 in. from the face. |
| Tension | Pulled taut and pinned before any fill goes on. | Belgard. Unilock uses 12 in. spikes. |
| Fill cover | 8 in. of fill before any machine or truck crosses the grid. | NCMA and Belgard: 6 in. |
| Grid and block | Grid the block maker lists for that unit, with published connection data. | Block makers publish their own approved grids. |
How deep is a Muthler paver base, and how thick is each lift?
Under patios and walks we build 8 in. of compacted open-graded 2B, in lifts of 3 in. or less. Under driveways it is 12 in. CMHA’s minimums are 4 in. and 6 in. 2B is the old PennDOT name for AASHTO No. 57, a clean stone about 1 in. down to a No. 4 sieve; our crushed stone sizes chart lists the sources. Open stone drains well, so a layer of non-woven fabric goes between it and the screenings bed to keep the bed from sinking into the voids.
| Job | Compacted 2B base | Lifts | Dig depth (our arithmetic) |
|---|---|---|---|
| Patio or walk, firm ground | 8 in. | 3 + 3 + 2 in. | 10 7/8 in. |
| Patio or walk, soft, wet or filled ground | 10 to 12 in., over fabric | 3 in. lifts | 12 7/8 to 14 7/8 in. |
| Driveway | 12 in. | 4 lifts of 3 in. | 14 7/8 in. |
The dig depth adds the base, the 1/2 in. bed and a 2 3/8 in. paver. Belgard’s guide asks for 10 to 12 in. in all in freeze-thaw climates, so a firm-ground patio sits inside that range. Step-by-step sequence: our how to install pavers guide. Depths and thickness in detail: paver base depth and paver thickness. Driveways: our paver driveway guide. The hub is pavers and patios.
How do we drain a wall and a patio?
Water is what moves a wall or a patio, so drainage gets its own numbers. Walls get 14 in. of clean 2B and a pipe that exits to daylight at both ends and every 30 ft or less. Patios are pitched 1/4 in. per ft away from the house. Roof water leaves in its own solid pipe and never enters the wall or patio drain. On clay or wet ground a perforated pipe runs around the low edge in 2B. Pitch for patios is covered in our paver patio slope guide, and wall pipes in our drain pipe and outlets guide.
- 1/4 in. per ft minimum
- Away from the house
- No flat spots
- 4 in. perforated, in 2B
- 1/4 in. per ft to daylight
- Rock splash pad at each outlet
- 811 ticket number on the job file
- Utilities marked
Why does central PA need more than the minimum?
Central Pennsylvania freezes and thaws every winter, and Belgard sets its deeper dig depth for freeze-thaw climates. Our crews also dig a lot of clay, which holds water against the base. A thicker base, thin lifts, a clean-stone drain and geogrid are how a patio or wall stays level through that. Ask anyone quoting the same job to put their numbers next to these.
What should you ask any contractor?
Hand them this list. A contractor who builds to a standard answers in numbers, and puts them in the written contract.
- How deep is the compacted base, and what stone is it? Muthler: 8 in. of 2B under patios and walks, 12 in. under driveways.
- How thick is each lift, and what compacts it? Muthler: 3 in. or less under pavers, 6 in. or less behind walls, a plate compactor of at least 5,000 lbf for pavers, at least 3 passes per lift.
- What goes between the base and the bedding layer? Muthler: non-woven fabric, so the bed cannot sink into the open stone.
- What is the pitch, and which way does the water go? Muthler: 1/4 in. per ft minimum, away from the house, with no flat spots.
- For a wall, how deep is the pad and how many courses are buried? Muthler: 8 in. of compacted 2B and one full course.
- How wide is the drainage zone, and where does the pipe come out? Muthler: 14 in. of clean 2B, a 4 in. perforated pipe, solid outlets to daylight at both ends and every 30 ft or less.
- How long is the geogrid, and how often does it go in? Muthler: full wall height and at least 6 ft, a layer at least every 2 courses, 100% coverage.
- Who stamps a wall over 4 ft? Muthler: a Pennsylvania engineer. We build from the stamped sheet.
- Is the 811 ticket number on the job file before digging? Muthler: yes, every job.
- Is all of this in the written contract? Ask for it there. Numbers that are not in the contract are not a promise.
Install standard FAQs
What does a retaining wall detail drawing show?
A cross-section of every layer under, in and behind the wall, with the size of each one: the compacted pad, the buried course, the block, the drainage zone, the pipe, the geogrid and the soil cap. Ours is the drawing above. Where the block maker’s design sheet is stricter than our standard, the sheet wins.
How deep should the base be under a paver patio?
CMHA calls for at least 4 in. of compacted base on well-drained soil, and 6 in. under a residential driveway. We build 8 in. of compacted 2B under patios and walks, 10 to 12 in. over soft or wet ground, and 12 in. under driveways.
How thick should each compacted layer be?
CMHA allows 4 to 6 in. lifts with a heavy plate; Belgard says 2 to 4 in. We use 3 in. or less per lift under pavers and 6 in. or less behind a wall, with at least 3 passes of the compactor on every lift.
What is 2B stone, and why build on it?
2B is the old PennDOT name for AASHTO No. 57: clean, open-graded crushed limestone, about 1 in. down to a No. 4 sieve. Water drains straight through it. A layer of fabric over it keeps the screenings bed from sinking into the voids.
How long should geogrid be in a retaining wall?
NCMA gives a floor of 60% of the wall height and at least 4 ft. We run grid the full height of the wall, buried course included, and never under 6 ft, with a layer at least every 2 courses on 8 in. block. The block maker’s design sheet can ask for more.
How wide should the drainage zone behind a retaining wall be?
Belgard and NCMA say at least 12 in.; Unilock says 14 in. We use 14 in. of clean 2B, with a 4 in. perforated pipe at the heel pitched to solid outlets.
When does a retaining wall need an engineer?
Sources differ, and local code governs. For our own builds: over 3 ft of exposed face, we build from the block maker’s design chart and add geogrid. Over 4 ft, any tiered wall, and any wall carrying a driveway, a building or a slope needs a stamped design from a Pennsylvania engineer.
Does building to this standard cost more than a minimum-spec job?
Usually yes. It means more stone, more compaction passes and more hours. Ask any contractor to price the minimum build and this build against the same drawing, so you can see what the difference buys.
Sources: CMHA PAV-TEC-002-22, Construction of Interlocking Concrete Pavements; CMHA PAV-TEC-009-13, Guide Specification; Belgard Technical Resource Guide, pavers section; Belgard SRW Quick Reference Install Guide (2023); Unilock, How to Build Retaining Walls; NCMA retaining wall installation guide; Allan Block, Basic Installation. The Muthler column, dig depths and drawings are our own standard and arithmetic. Planning information, not engineering advice. Walls over 4 ft, tiered walls and walls carrying a driveway, building or slope need a Pennsylvania engineer, and local code governs.
Free estimate · Central Pennsylvania
Want your patio or wall built to this standard?
Call or text (570) 397-9800 for a free estimate in Lock Haven, Williamsport, State College and the towns between. We will price it to this standard and show you the layers.
Get a free estimate Retaining walls PatiosMuthler Landscaping and Construction LLC · 913 Bellefonte Avenue, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.