A paver patio must shed water. The pitch is built into the subgrade and the base, not added at the end with the sand.

Quick answer

Belgard lists a 2% minimum on p. 6 and a 1.5% minimum (3/16 in. per ft) on p. 12, with many pavements at 2% (1/4 in. per ft). CMHA gives 1.5% minimum and Unilock slopes the base 1.5 to 2%. Slope away from the house. Checked Nov. 23, 2026.

What each source says

SourceSlope
Belgard, p. 6Minimum surface slope 2%
Belgard, p. 12Minimum recommended 1.5% (3/16 in. per ft); many pavements at 2% (1/4 in. per ft)
Belgard, p. 7Subgrade slope 1 to 2%
CMHA/ICPI, PAV-TEC-002Pavement surfaces: minimum 1.5%
Unilock, patio guideBase sloped 1.5 to 2%
Unilock, basic guideSlope away from the house or building; no minimum stated

Belgard’s own pages disagree on the minimum. Our call: plan on 2%, or about 1/4 in. per ft, away from the house, since that is the figure the Belgard and Unilock ranges both reach. Confirm with your paver’s instructions and any engineer on the job.

Where the pitch comes from

Subgrade

Slope the compacted subgrade 1 to 2% in the drainage direction (Belgard p. 7).

Base

Unilock screeds or rakes the gravel base to a 1.5 to 2% slope, following string lines. Check it with a straightedge and level before the sand goes on.

Sand and pavers

The bedding stays a uniform bed. Do not use extra sand to make slope; Belgard says screed a uniform 1 in. nominal bed, and CMHA says not to use bedding sand to correct an uneven base.

Checking the pitch

Belgard says the finished base should be within 3/8 in. over 10 ft (pp. 6, 13), and CMHA allows no more than 3/8 in. variation under a 10 ft straightedge on the final surface. At 1/4 in. per ft, a 10 ft run drops about 2 1/2 in. (our arithmetic). Belgard says pavers pitched at 2% drain quickly and carry sediment to the edges or drains (p. 9), so plan where that water and sediment will go. Belgard also gives about 12% as the maximum comfortable walking slope (p. 12), which matters if the site itself is steep.

Common mistakes

  • Building the pitch into the bedding sand. CMHA lists uneven bases reflecting through the surface over time as a common problem.
  • Skipping string lines and grade stakes, so the base is not checked against a set slope (Unilock screeds to string lines).
  • Sloping toward the house or a low spot with no outlet.
  • Poor compaction or saturated, weak soils, which CMHA ties to settlement and rutting. Settlement can create birdbaths that defeat the slope.

Soils and Pennsylvania winters

Slope only works if the base underneath drains. Unilock raises base depth from 6 to 8 in. to 10 to 12 in. on poor-draining subsoil, with total excavation of 14 to 16 in. CMHA describes a 4 in. perforated pipe in at least 3 in. of No. 57 stone, wrapped in geotextile, for clay or slow-draining soils under vehicle traffic. Belgard calls for excavation 10 to 12 in. deep in freeze-thaw areas, and says not to place base over a frozen subgrade (p. 13). Central Pennsylvania has freezing winters, so we treat the freeze-thaw figures as the ones that apply here. That is our inference. Call 811 before you dig (Belgard pp. 4, 12; CMHA says at least two days ahead).

Related: excavation depth, compacting the base, screeding bedding sand.

When to bring in a professional

CMHA says heavy-duty and industrial pavements need a qualified civil engineer. For a home patio, get site drainage designed if water could reach a foundation or a neighbor’s property, because slope alone does not solve it.

Planning figures, not engineering. Where water could reach a foundation or a neighbor, get site drainage designed. Slope alone does not solve it.

Questions

What slope should a paver patio have?

Belgard lists 1.5% as a minimum recommended slope and many pavements at 2% (1/4 in. per ft), with 2% as the minimum on another page. CMHA gives 1.5% minimum and Unilock slopes the base 1.5 to 2%.

Which way should a patio slope?

Away from the house or building, per Unilock’s basic guide and Belgard.

Where is the slope built in?

Into the subgrade (Belgard 1 to 2%) and the base (Unilock 1.5 to 2%), not the sand bed.

Can I fix a flat patio with more bedding sand?

No. Belgard and CMHA both say the bedding is a uniform layer, about 1 in., and should not be used to correct the base.

Do I need drainage pipe under a patio?

CMHA describes perforated pipe in stone for clay or slow-draining soils under vehicle traffic. Unilock instead adds base depth on poor-draining subsoil. Ask a designer for your site.

Sources: Belgard Technical Resource Guide, pp. 4, 6, 7, 9, 12, 13; Unilock, How to Build a Patio on Grade; Unilock Basic Tech Guide; CMHA/ICPI PAV-TEC-002, Construction of Interlocking Concrete Pavements. Checked Nov. 23, 2026.

Muthler Landscaping & Construction · Lock Haven, PA

Drainage problem?