Guides · Paver installation

How to Install Pavers: Step by Step

Paver installation is a stack of layers, and each layer has a number attached: compacted soil, a compacted stone base, an inch of sand, the pavers, then sand in the joints. This guide walks the sequence in the order a crew builds it, using figures from the Concrete Masonry & Hardscapes Association (CMHA), Belgard and Oregon State University Extension.

Quick answer

Dig to the base depth plus 1 in. of sand plus the paver thickness. Compact the soil to 98% of standard Proctor, build a compacted stone base (at least 4 in. for patios and walks, at least 6 in. for residential driveways), set edge restraints, screed 1 in. of ASTM C33 concrete sand, lay pavers with joints of 1/16 to 3/16 in., then compact, sweep in dry joint sand and compact again. Source: CMHA PAV-TEC-002 (revised 2022).

The sequence at a glance

StepWhat happensThe numberSource
1. Plan and call 811Check the fit, mark the outline, set the slope, locate utilitiesCall at least 2 days before digging; slope 1.5% minimum (CMHA), at least 2% (Belgard)CMHA, Belgard
2. ExcavateDig for base plus sand plus paverAt least 8 in. below finished grade; 10 to 12 in. in freeze-thaw climates; 6 in. past the paver edgeBelgard
3. Compact the subgradeRemove organics, fix standing water, compact98% of standard Proctor (ASTM D698)CMHA
4. Geotextile (optional)Wet, clay or freeze-thaw soilOverlap at least 12 in.CMHA
5. Build the basePlace and compact in liftsAt least 4 in. for patios and walks, 6 in. for residential drivewaysCMHA, Belgard
6. Set edge restraintsInstall on the compacted baseAt least 1 in. vertical face against the paversCMHA, Belgard
7. Screed bedding sandScreed over pipes, then fill the voids1 in. nominal, ASTM C33 concrete sandCMHA, Belgard
8. Lay and cut paversBorder course, string lines, cut edge piecesJoints 1/16 to 3/16 in.CMHA, Belgard
9. Compact and fill jointsPlate, then dry sand, then plate againPlate of at least 5,000 lbf; at least 2 passes, then 2 to 3 more with sandCMHA
10. Seal (optional)Sweep clean, apply a sand-binding sealerNo numeric requirementCMHA, Oregon State

The sources do not agree on every figure. Base lifts are the main one: CMHA allows 4 to 6 in. lifts with a 7,000 lbf reversible plate, Belgard says 2 to 4 in. When in doubt, thinner lifts are the safer reading, and CMHA itself calls for thinner lifts with a 5,000 lbf machine.

Cross-section: what goes where

Every source describes the same stack. The depths below are minimums for a pedestrian patio or walk on well-drained soil unless the label says driveway. Our paver base depth guide and paver thickness guide go deeper on those two numbers.

Edge restraint: at least 1 in. vertical facePavers and joint sand2 3/8 in. min. for drivewaysBedding sand1 in. nominal, ASTM C33 sandCompacted aggregate base4 in. patios, 6 in. drivewaysGeotextile (optional)Wet, clay or freeze-thaw soilCompacted subgrade98% of standard ProctorNot to scale. Figures from CMHA PAV-TEC-002 and Belgard.
CMHA

The industry association’s construction bulletin PAV-TEC-002 (revised 2022) and guide specification PAV-TEC-009 (2013). The source for compaction, tolerance and sand specifications.

Belgard

A manufacturer’s installation guide. Useful for dig depth, joint width and compactor protection, and it recommends polymeric joint sand.

Oregon State Extension

A homeowner-level 10-step guide, with no author or date shown on the page. Used here for layout, paver quantity and maintenance.

Step 1: Plan the layout, slope and utilities

CMHA tells installers to call the utility locators at least two days before excavation and to check site access for vehicles and equipment. In Pennsylvania the call goes to 811; our Pennsylvania 811 guide covers the rules and our marking colors guide explains the paint.

Oregon State suggests sketching the area first and marking an outline about 8 in. beyond the planned edge. Order the pavers by multiplying length by width, then adding 5%, or 10% if many pieces need cutting. Our paver calculator does the arithmetic.

The slope has to be built in from the start. CMHA gives a 1.5% minimum, Belgard says at least 2%, and Oregon State says 1 in. per 4 ft away from the house. Our arithmetic: 2% is about 1/4 in. per foot, and 1 in. per 4 ft is about 2.1%. See our paver patio slope guide for drainage details.

Step 2: Excavate to the right depth

The formula in the Oregon State guide is base thickness plus 1 in. of bedding sand plus the paver thickness. Here is that formula worked out with the minimum figures from CMHA (our arithmetic):

JobBaseSandPaverDig depth (our arithmetic)
Patio or walk4 in.1 in.2 3/8 in.7 3/8 in.
Residential driveway6 in.1 in.2 3/8 in.9 3/8 in.

Belgard’s guide sets a floor on top of that: dig at least 8 in. below finished grade, and 10 to 12 in. in freeze-thaw climates or where extra base is needed. Central Pennsylvania freezes and thaws every winter, so the 10 to 12 in. line is the one that applies here. Belgard also says to over-excavate at least 6 in. past the paver perimeter so the base and edge restraint sit on compacted ground. CMHA notes that finished pavers can sit 1/8 to 1/4 in. above final grade to allow for minor settling.

Step 3: Prepare and compact the subgrade

Remove organic soil, roots, debris and large rocks, and backfill any holes with clean, compacted aggregate. Get rid of standing water. CMHA says to compact the subgrade to at least 98% of standard Proctor density (ASTM D698), and prefers modified Proctor (ASTM D1557) where traffic is constant.

In clay or slow-draining soil, CMHA recommends drainage: 4 in. perforated pipe wrapped in geotextile, surrounded by at least 3 in. of No. 57 or similar open-graded stone, with the outlet screened. Our perforated drain pipe guide explains the pipe.

Geotextile is optional. CMHA says to use it where soil stays saturated, freezes and thaws, or sits over clay or moist silt. Use woven or non-woven fabric with a maximum apparent opening size of 0.60 mm (ASTM D4751), overlap at least 12 in. down-slope, keep it wrinkle-free and keep truck tires off it while stone goes in.

Step 4: Build the aggregate base

UseMinimum compacted baseSource
Sidewalks, patios, pedestrian areas4 in. on well-drained soilCMHA, Belgard
Residential driveways6 in.CMHA, Belgard
Residential streets8 to 10 in. (CMHA); 8 in. for parking lots and streets (Belgard)CMHA, Belgard

Oregon State names 3/4 minus crushed rock, spread slightly damp, in three layers with each layer compacted and a plate compactor to finish. Our crusher run guide explains what that material is and how it is sold. CMHA says to compact the base for pedestrian and residential driveway use to at least 98% of standard Proctor, to spread it at optimum moisture, and never to place frozen material or build over a frozen subgrade.

The base surface has to be flat before any sand goes down: within 3/8 in. over a 10 ft straightedge. CMHA says bedding sand cannot be used to correct an uneven base. If the base is the kind that lets sand migrate down into it, CMHA says to add a choke course or cover joints near curbs and structures with geotextile. CMHA also allows recycled concrete aggregate, up to 100% in pedestrian areas, with a higher risk of efflorescence. Our plate compactor sizing guide covers the machine.

Step 5: Set the edge restraints

Edge restraints hold the whole field in place. CMHA calls for at least 1 in. of vertical restraining surface against each paver, set to the right elevation on the compacted base before the sand and pavers go in. Belgard says the same and tells you to follow the restraint maker’s instructions. Oregon State lists plastic, precast concrete, metal and wood as options and warns that pavers shift and separate without them.

Step 6: Screed the bedding sand

Use concrete sand that meets ASTM C33. CMHA and Belgard both say not to use masonry sand, limestone screenings or stone dust. Spread and screed it to a nominal 1 in. uncompacted thickness over removable pipes or rails, fill the voids left when the pipes come out, and do not walk on or disturb the screeded sand. Do not use frozen or saturated sand. Belgard says to keep it damp but not wet. See our sand under pavers guide for quantities.

Step 7: Lay and cut the pavers

Belgard says to start at a verified 90-degree corner, lay a border course and use string lines to keep rows and joints straight. CMHA says to draw pavers from three or four bundles to blend color variation, and to keep joints at 1/16 to 3/16 in. with spacer bars or string lines. Belgard prefers about 1/8 in. for most products.

Fill the edges with cut pavers. CMHA says to use a cut piece for any gap over 3/8 in. Cut with a double-blade splitter or a masonry saw (a diamond blade, per Belgard), and use dust controls, because CMHA flags silica exposure when sawing.

Step 8: Compact and fill the joints

CMHA calls for a vibrating plate compactor of at least 5,000 lbf operating at 75 to 90 Hz. Make at least two passes to seat the pavers, then spread dry joint sand and make two or three more passes until the joints are full. The guide specification asks for at least four passes with joint sand and says not to compact within 6 ft of an unrestrained edge. Belgard adds a protective layer between the machine and the pavers, such as cardboard, thin carpet, luan plywood or a urethane mat, especially for textured pavers, and says to keep joint sand no more than 1/2 in. below the paver surface.

On the sand itself, Belgard recommends polymeric jointing sand. CMHA allows joint sand that meets ASTM C144, and Oregon State says sifted play sand or sand sold for pavers works. Our polymeric sand guide covers the trade-offs.

Step 9: Seal if you want to

Sealing is optional. CMHA gives no numeric requirement. Oregon State says a sand-binding sealer keeps joint sand in place, discourages weeds and makes stains easier to clean, and that pressure washing strips the joint sand, which means repeating the sand and sealer steps afterward. See our paver sealer guide for the types.

Finished tolerances to check before you stop

CheckCMHA limit (PAV-TEC-002)
Surface elevationNo more than 3/8 in. high under a 10 ft straightedge
Bond linesWithin 1/2 in. over 50 ft
Lippage between neighboring paversNo more than 1/8 in. on pedestrian routes
Pavers beside catch basins, utility covers or drain channels1/8 to 3/8 in. above them, except where ADA tolerances apply

Where paver installs go wrong

MistakeWhy it failsSource
Masonry sand, screenings or stone dust as beddingBoth sources say to use ASTM C33 concrete sand insteadCMHA, Belgard
Using the sand layer to fix an uneven baseSand cannot correct base unevenness; the base must be within 3/8 in. over 10 ft firstCMHA
Skipping edge restraintsPavers shift and separateOregon State
Compacting within 6 ft of an unrestrained edgeThe guide specification prohibits itCMHA PAV-TEC-009
Building on frozen ground or with frozen sandFrozen base material and frozen or saturated sand should not be placedCMHA
Pressure washing after the jobIt strips joint sand, so the sand and sealer steps repeatOregon State

Late-season work needs extra care. Our winter hardscape guide covers what can be built in cold weather, and if pavers settle later, our sinking pavers guide covers the repair.

DIY or hire it out?

The sources imply a short tool list: a plate compactor of at least 5,000 lbf, 1 in. pipes for screeding, string lines, a splitter or masonry saw, and a protective mat for the compactor. A small patio is a realistic DIY job if you can rent the compactor and will follow the numbers above. Driveways, and any paver area beside a house wall, a slope or a drainage problem, are where a mistake costs the most. For prices see our paver patio cost guide, and for the driveway version of this job see our paver driveway guide. If you are still choosing the paver itself, start with our patio pavers guide or the pavers and patios hub.

Paver installation FAQs

How deep do you dig for pavers?

Dig to the base thickness plus 1 in. of bedding sand plus the paver thickness. With a 4 in. base and 2 3/8 in. pavers that adds up to 7 3/8 in. (our arithmetic). Belgard says to dig at least 8 in. below finished grade, and 10 to 12 in. in freeze-thaw climates or where extra base is needed. Central Pennsylvania freezes and thaws every winter, so the deeper figure is the safer reading.

How thick should the base be under pavers?

CMHA calls for at least 4 in. of compacted aggregate base under patios, sidewalks and other pedestrian areas on well-drained soil, and at least 6 in. under residential driveways. Belgard gives the same 4 in. and 6 in. figures. Heavier designs are left to an engineer in the CMHA text.

What sand goes under pavers?

Concrete sand that meets ASTM C33, screeded to about 1 in. loose. CMHA and Belgard both say not to use masonry sand, limestone screenings or stone dust as bedding sand. Our guide on how much sand goes under pavers covers ordering.

Do pavers need edge restraints?

Yes. Oregon State University Extension says pavers can shift and separate without edging, and CMHA calls for at least 1 in. of vertical restraining surface against each paver. Oregon State lists plastic, precast concrete, metal and wood as edging options.

How wide should paver joints be?

CMHA and Belgard both give 1/16 to 3/16 in., and Belgard prefers about 1/8 in. for most products. CMHA’s guide specification adds that no more than 5% of joints should be wider than 1/4 in.

How many passes with a plate compactor?

CMHA says to use a plate compactor with at least 5,000 lbf of force and make at least two passes to seat the pavers, then spread dry joint sand and make two or three more passes until the joints are full. Its guide specification says at least four passes for the joint sand. That specification also says not to compact within 6 ft of an unrestrained edge.

Do I need polymeric sand?

The sources do not all require it. Belgard recommends polymeric jointing sand because it stabilizes the joints and helps deter weeds and insects. CMHA allows joint sand that meets ASTM C144, and Oregon State says sifted play sand or sand sold for pavers works, with an optional sealer to hold it in place. Our polymeric sand guide covers how it behaves.

How much slope should a paver patio have?

The sources differ a little: CMHA gives a 1.5% minimum, Belgard says at least 2%, and Oregon State suggests 1 in. per 4 ft away from the house. Our arithmetic: 2% is about 1/4 in. per foot, and 1 in. per 4 ft is about 2.1%. Our patio slope guide covers the drainage details.

Can you lay pavers on frozen ground?

CMHA says not to place frozen base material or place base material over a frozen subgrade, and not to use frozen or saturated bedding sand. Our winter hardscape guide covers what can and cannot be built in cold weather in central Pennsylvania.

Sources: CMHA PAV-TEC-002-22, Construction of Interlocking Concrete Pavements (revised 2022); CMHA PAV-TEC-009-13, Guide Specification for the Construction of Interlocking Concrete Pavement; Belgard Product Installation Guide, pavers section (pages 6 to 8); Oregon State University Extension, 10-step paver installation guide (no author or date shown). Dig depths in the table are our arithmetic from the cited minimums.

Groundwork Design Co. · A Muthler Landscaping and Construction studio

Planning a patio or walkway? Get a plan first

Send photos and measurements and get a scaled plan, a material list and a written scope you can price line by line, from $349 with a first draft in 10 business days. Building in central Pennsylvania? Muthler can build it.