Guides · Retaining wall installation · Step 6
Geogrid placement in a retaining wall
Geogrid is the plastic or fabric mesh that ties a wall to the soil behind it. How many layers, how long, and what strength come from the wall design, not from a rule of thumb. What the installer controls is placement, direction and cover.
Lay the grid on the block with its strength direction running back into the soil, pull it taut, pin it, and cover it. Belgard sets the front edge 1 in. from the face; Unilock says 1 in. back from the face. NCMA gives a minimum length of 60% of wall height and at least 4 ft, but the design sets the real length and layers.
Steps
Belgard says geosynthetic-reinforced walls are designed by a qualified engineer. Unilock leaves length and layers to the engineer. Do not guess them. See geogrid and reinforced soil wall.
NCMA says the strength direction runs perpendicular to the wall face. Rolls have a strong direction and a weak one. Cut and lay accordingly, with no seams or overlaps at the units.
Belgard puts the front edge 1 in. from the face. Unilock says 1 in. back from the face. The grid sits on a clean, level block surface.
Belgard says the grid must be taut and pinned. Unilock pins it with 12-inch spikes. Remove slack before covering. See wall pins.
NCMA and Belgard both say at least 6 in. of fill goes over the grid before any equipment runs on it.
NCMA says to keep 3 in. of soil between overlapping grid layers at curves and corners. See corners and curves.
What each source says
| Source | Placement and cover |
|---|---|
| Belgard | Front edge 1 in. from the face; taut and pinned; at least 6 in. of backfill before vehicles cross the grid |
| Unilock | 1 in. back from the face; pinned with 12-inch spikes; length and layers set by the engineer |
| NCMA | Minimum length 60% of wall height and at least 4 ft; strength direction perpendicular to the face; no seams or overlaps at units; 3 in. of soil between overlapping layers at curves and corners; no equipment until 6 in. of fill |
| Allan Block | Rolls needed are roughly wall length times number of layers, divided by 50 ft (estimating guidance) |
None of the pages reviewed gives a one-size vertical spacing for grid layers. That comes from the design.
Questions
How long should geogrid be?
The design sets it. NCMA’s guide gives a minimum of 60% of wall height and at least 4 ft, as a floor, not a target.
Which way does geogrid run?
NCMA says the strength direction is perpendicular to the wall face, running back into the soil.
Can I drive over geogrid?
Not until it is covered. NCMA and Belgard both say at least 6 in. of fill goes on first.
How do I pin it?
Belgard says to pin it taut. Unilock uses 12-inch spikes. Check your block and grid maker for the right pin.
Sources: Belgard SRW Quick Reference Install Guide (2023); Unilock, How to Build Retaining Walls; NCMA retaining wall installation guide; Allan Block, Basic Installation. Checked Nov. 22, 2026.
Muthler Landscaping & Construction · Lock Haven, PA
Need a wall built in central PA?
We build segmental retaining walls from the base up. If your job is in our area, we can walk the site and quote it.
Get a quoteAll guidesMuthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.