Compare contractor quotes: a patio and retaining wall checklist

To compare contractor quotes, tick what each one lists in writing, not just the total. For a paver patio or block wall, that means base depth, compaction, edge restraint, drainage stone, geogrid, permit and warranty. A quote that leaves several out may be pricing a smaller job, so ask before you compare prices. Deposit caps, licensing and permits differ by state, so pick your state to check them.

Start the checklist
How the score works

An item counts only if it is written in the quote. Each benchmark below comes from ICPI, CMHA, NCMA, Unilock, Belgard, Allan Block or the FTC, with the source linked. Rules such as the deposit cap differ by state, so those items link to your state’s guide.

A lower quote is not wrong by itself. It is a question: what did it leave out?

Quote comparison checklist

1. What are the quotes for?

2. Enter the quotes

Quote A

Quote B

Quote C (optional)

3. Tick what each quote lists in writing

Tick an item only if it is on the quote or contract. If a contractor only said it, leave it unticked and ask for it in writing.

What gets built

Excavation depth and soil removalWhy it matters

Unilock’s patio guide digs 10 to 12 in. deep over well-draining soil and 14 to 16 in. over poor-draining soil, and 6 in. past the paver edge.

Base depthWhy it matters

ICPI calls for at least 4 to 6 in. of compacted base under walks and 6 to 8 in. under residential driveways. Unilock says 6 to 8 in. for patios over well-draining soil and 10 to 12 in. over poor-draining soil.

CompactionWhy it matters

ICPI: at least 98% of standard Proctor density, in lifts of typically 4 to 6 in. Unilock: 3 in. lifts, a 10,000 lb plate compactor, at least three passes per lift.

Edge restraintWhy it matters

Unilock says all edges must be restrained, set on the compacted base and not on the sand. CMHA calls for it at the perimeter and wherever the paving or pattern changes.

Bedding sand and joint sandWhy it matters

ICPI: screed the bedding sand to 1 to 1½ in. thick, uncompacted. Joint sand is what lets the surface spread loads down to the base.

Slope and drainageWhy it matters

Unilock recommends a 1.5 to 2% slope on the base, about 3/16 to 1/4 in. per foot (our math).

Base and buried blockWhy it matters

NCMA and Belgard call for a leveling pad at least 6 in. thick after compaction, extending 6 in. past the first course. Belgard buries at least 6 in. of block; Allan Block digs 6 in. plus 1 in. per foot of wall height.

CompactionWhy it matters

Allan Block: at least two plate compactor passes on the base, and backfill compacted in lifts of 8 in. or less.

Drainage stone behind the wallWhy it matters

Belgard backfills 12 in. behind the wall with 3/4 in. angular, free-draining stone on every course. NCMA and Allan Block also call for at least 12 in. behind the units.

Drain pipe to daylightWhy it matters

Belgard: 4 or 6 in. perforated pipe low behind the wall, with an outlet every 50 ft. Allan Block requires pipe on reinforced walls, gravity walls over 4 ft and poor-drainage sites.

Geogrid: layers and length, or why noneWhy it matters

NCMA: geogrid at least 60% of the wall height and never under 4 ft long. Layers and length come from the wall design.

Engineered design, if the wall needs oneWhy it matters

Belgard says geogrid-reinforced walls are designed by a qualified engineer. IRC R404.4 requires an engineered design past 48 in. of unbalanced fill, or past 24 in. with a load above.

Rules before digging

Utility locate (811)Why it matters

Call 811 before any digging with powered equipment. Every state runs its own notice period and rules.

Check your state: Dig laws by state

Permit and local rulesWhy it matters

Whether a patio needs a permit depends on your state and town. Ask who pulls the permit and what your municipality requires before work starts.The model building code (IRC R105.2) exempts a retaining wall up to 4 ft, measured from the bottom of the footing to the top of the wall, unless it supports a surcharge. States and towns adopt their own versions.

Check your state: Permit rules by state

Paperwork and warranty

License or registration number on the quoteWhy it matters

Many states license or register home improvement contractors, and some require the number on contracts and ads. The FTC says to confirm the license with your state or county government and to look for the license number on the contract.

Check your state: Licensing by state

Proof of insuranceWhy it matters

The FTC advises hiring a licensed and insured contractor and asking for proof of insurance. Some states set minimum coverage.

Check your state: Insurance rules by state

Work, materials and dates in writingWhy it matters

The FTC says a written estimate should cover the work, the materials, the completion date and the price, and that any verbal promise about scope or cost belongs in writing.

Check your state: Contract requirements by state

Deposit within your state’s capWhy it matters

Some states cap how large a deposit a contractor can require, and the FTC advises against paying the full cost up front or in cash only. Hold the final payment until the work is done and you are satisfied.

Check your state: Deposit limits by state

Right-to-cancel noticeWhy it matters

The FTC says a contract signed in your home, or anywhere but the contractor’s permanent business location, should include a written notice of your right to cancel within three business days.

Check your state: Right to cancel by state

Workmanship warranty in writingWhy it matters

Belgard and Techo-Bloc say their warranties do not cover installation labor, and Unilock’s guarantee covers the product. Belgard says improper installation voids its warranty.

4. Your score

—Tick what each quote lists in writing

    How do you compare contractor quotes?

    Match the scope first and the price second. Tick every item above only if it is written in the quote, then ask each contractor with gaps to confirm in writing and re-price before you compare totals.

    1. Make every quote cover the same size, material and finish.
    2. Tick an item only if it is on the page, not promised on the phone.
    3. Ask each contractor to confirm the missing items in writing and send a revised total.

    Check the contractor’s license or registration with your state before anything else; our state guides show what your state requires. Why two excavation quotes can be $5,000 apart shows how a gap builds up, and why a paver patio quote runs higher than online cost guides explains the price side. For paver jobs, how to hire the right paver contractor has the questions to ask.

    How deep should the base be under pavers?

    ICPI calls for at least 4 to 6 in. of compacted aggregate base under walks and 6 to 8 in. under residential driveways, and says thicker bases may be needed for soil, frost and traffic.

    Unilock’s patio guide specifies 6 to 8 in. of compacted base over well-draining subsoil and 10 to 12 in. over poor-draining subsoil, which means digging 10 to 12 in. or 14 to 16 in. deep. It also recommends a 1.5 to 2% slope on the base, about 3/16 to 1/4 in. per foot by our math, so water runs off. A quote that gives no depth in inches gives you nothing to compare. Our paver driveway requirements guide and how to install pavers walk through the layers.

    How should the base be compacted?

    ICPI calls for at least 98% of standard Proctor density (ASTM D698) on pedestrian and residential driveway bases, compacted in lifts of typically 4 to 6 in. depending on the compactor.

    Unilock is more specific: 3 in. lifts, a reversible plate compactor with 10,000 lb of driving force, and at least three passes per lift. ICPI says to screed the bedding sand to 1 to 1½ in. thick, and not to fill base depressions with sand, because they eventually show in the surface. A quote that says only “compact base” does not say which of these you are getting. See the gravel compaction calculator for lifts and tons.

    Do paver edges need edge restraint?

    Yes. Unilock’s guide says all edges of a patio must be restrained, and CMHA calls for restraint at the perimeter and wherever the paving or laying pattern changes. A building wall can serve as the restraint.

    Plastic restraint goes on the compacted base, not the bedding sand, secured with 12 in. spikes (Unilock). Our guide to installing paver edge restraints covers the types that count and where they go (CMHA PAV-TEC-003).

    What should a retaining wall quote include?

    The base and buried block, compaction, drainage stone and pipe, geogrid where the design calls for it, any engineering, and the permit. Belgard sets a leveling pad at least 6 in. deep after compaction and buries at least 6 in. of block.

    NCMA also calls for a leveling pad at least 6 in. thick, and Allan Block digs 6 in. plus 1 in. per foot of wall height for the buried block. Allan Block compacts the base with at least two plate passes and backfills in lifts of 8 in. or less. To check the height a block can hold, use the retaining wall block chooser, and for quantities the block calculator.

    How much drainage stone goes behind a retaining wall?

    Belgard calls for 12 in. of 3/4 in. angular, free-draining stone behind the wall on every course, and NCMA and Allan Block also call for at least 12 in. behind the units.

    Belgard adds 4 or 6 in. perforated pipe low behind the wall with an outlet every 50 ft. Allan Block requires drain pipe on reinforced walls, gravity walls over 4 ft and poor-drainage sites, vented to daylight every 50 ft (Belgard guide, Allan Block, NCMA). A quote that says only “gravel backfill” is not saying how thick or what stone.

    When does a retaining wall need geogrid or an engineer?

    It depends on the block, the soil and what sits above the wall, and the wall design sets the layers. As a floor, NCMA puts geogrid at least 60% of the wall height and never under 4 ft long.

    Belgard says geogrid-reinforced walls are designed by a qualified engineer. The model code, IRC R404.4, requires an engineered design when a wall retains more than 48 in. of unbalanced fill, or is over 24 in. with a load above it such as parked cars or a fence (ICC summary). That is the model code, so ask your local code office how it applies to your wall. Our guides cover when a wall needs geogrid and how geogrid is placed.

    Do I need a permit for a patio or retaining wall?

    It depends on your state and town. The model building code (IRC R105.2) exempts a retaining wall up to 4 ft, measured from the bottom of the footing to the top of the wall, unless it supports a surcharge, but states and towns change that rule. Check yours before you sign.

    Our retaining wall permit guide lists the exemption for all 50 states and D.C. For a patio, ask your town’s code office what it requires, who pulls the permit and whether the fee is in the price. Before any digging with powered equipment, call 811; notice periods differ by state (811 dig laws by state).

    What does a hardscape warranty cover?

    Paver and block makers warrant the product, not the installer’s labor. Belgard, Unilock and Techo-Bloc each publish a transferable lifetime warranty for residential use, and Belgard and Techo-Bloc say it excludes installation labor. The workmanship warranty has to come from your contractor.

    Improper installation can also void the product coverage. Belgard says it voids its warranty, Techo-Bloc excludes damage from installation that does not meet local codes, and Unilock says improper installation may void its warranty. Unilock’s guarantee page does not say whether labor is covered. Get your contractor’s warranty length and coverage in writing. Brand terms change; the warranty for your purchase governs. See what each brand’s warranty allows.

    What paperwork should a contractor quote show?

    The contractor’s name, address and license or registration number where your state requires one; proof of insurance; the work, materials and dates; a deposit within your state’s cap; and your right to cancel. The FTC lists most of these, and states add their own rules.

    The FTC’s home improvement guide says a written estimate should cover the work, materials, completion date and price, and that a contract signed away from the contractor’s business should state your right to cancel within three business days. It also says some states cap deposits. Pay no more up front than your state allows and hold the final payment until the work is done.

    Which contractor rules are set by state law?

    Deposit caps, contractor licensing or registration, required contract terms, right to cancel, lien rules, permits and 811 notice all vary by state. Check each against your own state’s law before you sign or pay.

    Pick your state in step 1 for its guide, or open the comparison for the rule you need.

    Each state guide covers licensing, deposits, liens and insurance and links the official source. Your state agency or local building department has the final word.

    Sources: ICPI Tech Spec 10, Application Guide for Interlocking Concrete Pavements (base thickness, 98% Proctor, lifts, bedding sand); Unilock, How to Build a Patio on Grade (excavation, base, lifts, slope, edge restraint); CMHA/ICPI PAV-TEC-003, edge restraints; Belgard SRW Quick Reference Install Guide, 2023 (pad, buried block, drainage stone, pipe, engineer); Allan Block, Basic Installation (trench, base rock, pipe, lifts); NCMA, Retaining Wall Installation Guide (pad, geogrid length, drainage fill); ICC, 2015 IRC significant changes, R404.4 (engineered walls); FTC, How to Avoid a Home Improvement Scam (written estimates, deposits, licensing, insurance, right to cancel); Muthler state guides (deposit limits, contract requirements, right to cancel, 811, retaining wall permits, IRC R105.2); Belgard warranty; Unilock guarantee; Techo-Bloc warranties.

    Planning guidance, not engineering or legal advice; check your state’s law. Checked Nov. 26, 2026.

    Muthler Landscaping & Construction · Groundwork Design

    Want a design? Start here.

    Get a patio or retaining wall plan with the layers, drainage and materials spelled out, so every contractor quotes the same job. Available in every state.

    Start your designRetaining wall plan

    Building in central Pennsylvania? We build paver patios and block retaining walls from Lock Haven. Get a free estimate or call (570) 397-9800 · PA HIC #PA212584. Also: patio cost calculator, retaining wall cost calculator, all tools.

    Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.