Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

Guides · Retaining wall installation · Step 7

Retaining wall cap installation

Caps finish the top of the wall and shed water off the top course. They are glued, not stacked loose. Published numbers are thin, so this page sticks to what Unilock, Allan Block and NCMA actually state.

Quick answer

Dry-fit the caps, then glue them to clean, dry block with concrete adhesive. Unilock calls for two 1/4-inch beads of adhesive and a cap overhang of 1-1/2 to 2 in. Allan Block cuts caps at 45 degrees at corners and uses high-strength construction adhesive. NCMA says caps are optional and secured per the manufacturer’s adhesive instructions.

Steps

1. Finish the top course

Backfill drainage stone to 6 in. below the coping, per Unilock, then fold filter fabric over it. The cap sits on the last course of block. See cap unit.

2. Dry-fit first

Lay the caps out without adhesive to set joints and cuts. Plan the overhang. Unilock says 1-1/2 to 2 in. of coping overhang.

3. Clean the surface

Unilock says surfaces must be clean and dry before gluing. Sweep off stone dust and wait out wet weather.

4. Glue the caps

Unilock applies two 1/4-inch beads of concrete adhesive. Allan Block uses a high-strength construction adhesive. Use the adhesive your block maker names.

5. Cut corners at 45 degrees

Allan Block says to cut caps at 45 degrees where walls turn at a corner. See corners and curves.

6. Finish the grade

Unilock folds the fabric over the stone and covers it with topsoil, and slopes the ground 2 to 5% away from the wall. NCMA describes a cap of about 8 in. of low-permeability soil on top.

What each source says

SourceCap guidance
UnilockOverhang 1-1/2 to 2 in.; two 1/4-inch beads of concrete adhesive; clean, dry surfaces
Allan Block45-degree cuts at corners; high-strength construction adhesive
NCMACaps optional; secured per the manufacturer’s adhesive instructions
BelgardCap details not covered in the quick reference guide reviewed
Planning information, not engineering advice. Freestanding walls, seat walls and walls with railings or fences on top have different loads and need their own details. See when a wall needs an engineer.

Questions

Do retaining walls need caps?

NCMA lists caps as optional. They finish the wall and cover the top block joints, and many designs include them.

What adhesive holds the caps?

Unilock names concrete adhesive in two 1/4-inch beads. Allan Block names high-strength construction adhesive. Use what your block maker specifies.

How much should the cap overhang?

Unilock says 1-1/2 to 2 in. The other sources reviewed do not give an overhang figure.

Can I glue caps in cold or wet weather?

Unilock says surfaces must be clean and dry. Adhesive temperature limits are on the product label, so check it.

Sources: Unilock, How to Build Retaining Walls; Allan Block, Building Corners in a Retaining Wall; NCMA retaining wall installation guide; Belgard SRW Quick Reference Install Guide (2023). Checked Nov. 22, 2026.

Muthler Landscaping & Construction · Lock Haven, PA

Need a wall built in central PA?

We build segmental retaining walls from the base up. If your job is in our area, we can walk the site and quote it.

Get a quoteAll guides

Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.

Related guides: overhang and adhesive overview and cap dimensions and specs by manufacturer.