Guides · Retaining wall installation · Step 2

Retaining wall first course

The first course sets the line, level and batter for every course above it. Time spent here is the cheapest time on the job. Here is what Belgard, NCMA, Unilock and Allan Block say to do.

Quick answer

Start at the lowest elevation, set each block on the compacted pad, and level it front to back and side to side. Belgard says to remove the rear lip on rear-lip units and to run a string line along the back edge. Bury the first course at least 6 in. below finished grade, per Belgard. Offset vertical joints from course to course.

Steps

1. Start low

Belgard says to set the first course at the lowest elevation of the wall. On a sloped site the wall then steps up from that point. See stepping up the base.

2. Position on the pad

NCMA’s guide shows the first course set 6 in. from the front edge of the pad and 12 in. from the rear edge. That matches the pad built in step 1.

3. Trim the lips

On rear-lip units, Belgard says to remove the rear lip from the first course so the block sits flat on the pad.

4. Level both ways

Belgard calls for the first course to be level front to back and side to side, with a string line on the back edge to keep blocks in line. Tap blocks into the pad rather than shimming with loose material.

5. Fill and compact behind

Place drainage stone behind the first course and compact it before stacking. Never stack more than 18 in. of wall before backfilling, per Unilock. See drainage aggregate.

6. Offset the joints

Allan Block says to offset vertical seams at least 1/4 of a block length. Unilock says to offset joints by half a block. Use your block’s manual.

Source differences at a glance

ItemWhat the source says
Burial (Belgard)Bury at least 6 in. below finished grade
Position on pad (NCMA)6 in. from the front edge, 12 in. from the rear edge
Joint offsetAllan Block: at least 1/4 block length. Unilock: half a block
Stack height before backfill (Unilock)No more than 18 in.
Setback angleVaries by block system; not given here. Check your manual
Planning information, not engineering advice. Block systems differ in lip design, setback and joint rules. Install the way your block’s manual says, and have walls over the manufacturer’s height limit designed by an engineer. See when a wall needs an engineer.

Questions

Why start at the lowest point?

Belgard says to set the first course at the lowest elevation so the rest of the base can step up from it. Each step must be level on its own.

Do I have to remove the lip on the first course?

Belgard says to remove the rear lip on rear-lip units for the first course. Other systems differ, so follow your block’s manual.

How far should the first course be buried?

Belgard says at least 6 in. below finished grade. Allan Block’s embedment rules of thumb are covered on our embedment page.

How should the joints line up?

Offset them. Allan Block says at least 1/4 block length; Unilock says half a block.

Sources: Belgard SRW Quick Reference Install Guide (2023); Unilock, How to Build Retaining Walls; NCMA retaining wall installation guide; Allan Block, Basic Installation. Checked Nov. 22, 2026.

Muthler Landscaping & Construction · Lock Haven, PA

Need a wall built in central PA?

We build segmental retaining walls from the base up. If your job is in our area, we can walk the site and quote it.

Get a quoteAll guides

Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.