Guides · Retaining wall installation · Step 5
Retaining wall backfill and compaction
Poor compaction is a common reason walls settle or bulge. The rules are about thin lifts, enough density, and keeping heavy equipment off the block. Here is what NCMA, Belgard and Allan Block publish.
Backfill in thin lifts and compact each one. NCMA says 6 to 8 in. lifts, usually to at least 95% of standard Proctor density (ASTM D698). Allan Block says lifts of 8 in. or less with at least two passes. Within about 3 to 4 ft of the wall, use hand-operated equipment only; the sources differ, so follow your block’s manual.
Steps
Behind the stone zone, use soil that your design allows. Allan Block says to replace clay, wet or disturbed soil with granular material. See compaction.
NCMA gives 6 to 8 in. lifts. Allan Block gives 8 in. or less. Spread the fill evenly rather than dumping against the block.
NCMA allows only hand-operated equipment within 3 ft of the wall face and prefers a vibrating plate of at least 250 lb. Belgard says no self-propelled compactors within 4 ft of the wall back.
NCMA says walls usually need at least 95% of standard Proctor density (ASTM D698). Allan Block specifies at least two passes. Your design may set a different target.
NCMA says heavy equipment should stay at least 5 ft behind the wall face once the wall is complete. Check plate compactor sizing.
NCMA says the top of the wall is capped with about 8 in. of low-permeability soil. Unilock says to slope the ground 2 to 5% away from the wall. See cap installation.
Compaction rules by source
| Source | Lift thickness | Equipment and density |
|---|---|---|
| NCMA | 6 to 8 in. | Usually at least 95% standard Proctor (ASTM D698). Hand-operated equipment only within 3 ft of the face; vibrating plate of at least 250 lb preferred |
| Belgard | Not stated in the guide reviewed | No self-propelled compactors within 4 ft of the wall back |
| Allan Block | 8 in. or less | At least two passes per lift |
| Unilock | Not stated | Compact the 3/4-inch gravel base and drainage layer; never stack more than 18 in. of wall before backfilling |
Questions
How thick should each backfill lift be?
NCMA says 6 to 8 in. Allan Block says 8 in. or less. Thinner lifts compact more evenly.
How close can a compactor get to the wall?
NCMA allows only hand-operated equipment within 3 ft of the face. Belgard says no self-propelled compactors within 4 ft of the wall back. Use the stricter figure when in doubt.
What density does backfill need?
NCMA says usually at least 95% of standard Proctor density (ASTM D698). A project’s design can set a different number.
Can I run a skid steer behind the wall?
NCMA says heavy equipment stays at least 5 ft behind the wall face after the wall is finished. During construction, follow your block maker’s limits and the design.
Sources: NCMA retaining wall installation guide (current edition: CMHA SRW-MAN-003); Belgard SRW Quick Reference Install Guide (2023); Allan Block, Basic Installation; Unilock, How to Build Retaining Walls. Checked Nov. 22, 2026.
Muthler Landscaping & Construction · Lock Haven, PA
Need a wall built in central PA?
We build segmental retaining walls from the base up. If your job is in our area, we can walk the site and quote it.
Get a quoteAll guidesMuthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.