Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE
Home / Drainage guides / Dry extended detention basin

Dry extended detention basin: how the PA BMP Manual describes it

Quick answer: In the Pennsylvania Stormwater Best Management Practices Manual (BMP 6.6.3), a dry extended detention basin is an earthen basin that holds runoff temporarily to cut peak flows and, by releasing the water quality storm slowly, gives some pollutant removal. It is rated high for peak rate control but low for volume reduction and provides no recharge. It is a designed structure, not a yard depression.

What it is

The manual describes the basin as an earthen impoundment, built by damming a low spot or by excavating, that stores stormwater and lets it out gradually. Extended detention means the water quality design storm runoff is held for an extended period. Net volume reduction is minimal and comes mainly from the soil getting saturated and some evaporation. The manual rates volume reduction low, recharge none, peak rate control high and water quality low. Listed removal values are 60% for total suspended solids, 40% for total phosphorus and 20% for nitrate. Those are lower than infiltration practices such as the infiltration trench.

Where the manual says it fits

  • Low-density residential, industrial, commercial and urban settings, with every category in the applicability table (residential, commercial, ultra urban, industrial, retrofit, highway and road) marked yes.
  • Downgradient of disturbed or developed areas, capturing as much impervious runoff as possible.
  • Paired with other practices. The manual says the basin works best in combination with other BMPs.

The manual says not to build in jurisdictional waters including wetlands, not to remove trees to make room, and to avoid soils that are good candidates for infiltration practices. Where the water table is high it suggests a wet pond, constructed wetland or bioretention instead. See constructed wetland for that option.

Key design numbers

ItemWhat the manual says
Basin floorAt least 2 feet above the seasonal high water table
Minimum width10 feet
Length-to-widthRecommended minimum 2:1
Low-flow channelVegetated, maximum slope 3%
Embankment heightLess than 15 feet
Embankment side slopesNo steeper than 3:1 (horizontal to vertical)
FreeboardAt least 1 foot above the spillway design flood elevation
Sediment forebayMinimum length 10 feet, sized to trap about 2 years of sediment
Orifice sizeTypically at least 2.5 inches, reducible to 1 inch if protected from clogging

The three-part outlet

The outlet is multistage. A low-flow outlet releases the water quality storm slowly. A primary outlet, built from weirs, orifices, pipes or a combination, handles larger storm peaks. An emergency overflow spillway is sized for the spillway design flood, usually the 100-year event. Water quality storage sits below the primary outlet invert. The manual prefers several orifices over one pipe where possible, calls for energy dissipaters at the primary outlet, and wants an external trash rack on the primary and low-flow outlets.

Vegetation and soils

Keep the in-place bottom soil from being compacted. If it is, the manual says to restore it under BMP 6.7.3 (see our soil amendment page and minimizing soil compaction). Plant a diverse native mix on the basin bottom. Keep woody plants off embankments and at least 25 feet from the emergency spillway, use deep-rooted meadow grasses on interior slopes, and skip fertilizer and pesticides.

Construction sequence in brief

  1. Install erosion and sediment controls and stabilize surrounding ground first.
  2. Clear only the excavation area, keeping existing vegetation where feasible.
  3. Excavate, then build embankments and the inlet and outlet structures.
  4. Grade the subsoil without compacting the bottom; compact embankments and the ground around structures.
  5. Place planting soil, geotextiles and erosion controls, then seed, plant and mulch.

The informational specifications call for fill free of stones over 6 inches, placed in lifts of 8 inches or less and compacted to 95% standard Proctor. The embankment core has a top width of at least 4 feet.

When a basin becomes a regulated dam

The manual says PA DEP regulates the basin as a dam if the embankment is over 15 feet, the drainage area is over 100 acres, or the impounded volume exceeds 50 acre-feet at high water. It also says the basin is not for recreation and access should be discouraged.

Maintenance

The manual describes quarterly maintenance and requires an operations plan. Inspect bottoms, trash racks, outlets, riprap, gabions and inlets at least four times a year and after storms over 1 inch. Remove sediment only when the basin is completely dry, then stabilize and reseed right away. Check vegetation yearly for erosion and invasive species, keep cover at 95% or better, and re-establish it if cover drops by 10%. Annual maintenance is estimated at 3 to 5% of construction cost.

Where the manual leaves gaps or conflicts

  • Detention time: deferred to Chapter 3, with no value in this section.
  • Missing values: drawdown time, minimum drainage area, forebay depth, and low-flow orifice size are not given.
  • Cost: an equation and example costs are in 1997 dollars, so they are not current prices.
  • Maintenance rhythm: quarterly maintenance sits beside annual vegetation checks and four-times-yearly structure inspections.
  • Pub. 408 edition: the specifications cite the 2000 edition while the references list 1990.

Pennsylvania approvals and who designs it

Basin sizing, hydrographs and outlet design are engineering work. Expect municipal review and possibly an erosion and sediment plan or NPDES permit; see Chapter 102 and PA stormwater plan rules. Related practices: level spreader and vegetated filter strip.

Sources

  • Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.6.3 Dry Extended Detention Basin, read from a municipal copy hosted at indianlakepa.gov. Checked Nov. 23, 2026.

Related

All drainage guides · Rain garden · Subsurface infiltration bed · Culverts under driveways

Get a quote

FAQ

How steep can a detention basin embankment be?

The manual says embankment side slopes should be no steeper than 3:1, and embankment height should be less than 15 feet.

When is a detention basin regulated as a dam in Pennsylvania?

The manual says PA DEP regulates it as a dam if the embankment is over 15 feet, the drainage area is over 100 acres, or the impounded volume is over 50 acre-feet.

How much pollution does a dry extended detention basin remove?

The manual lists 60% for total suspended solids, 40% for total phosphorus and 20% for nitrate, and rates water quality benefit low.

How often should a basin be inspected?

At least four times a year and after storms greater than 1 inch, with sediment removed only when the basin is completely dry.

Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov. 23, 2026.