Vegetated filter strip: what the PA BMP Manual says
Quick answer: In the Pennsylvania Stormwater BMP Manual, a vegetated filter strip is a gently sloping, densely vegetated area that filters, slows and infiltrates sheet flow. The manual recommends a minimum length of 25 feet, says slope should never exceed 8%, and rates its water quality benefit High but its volume and peak rate benefits Low.
What it is
BMP 6.4.9 quotes the EPA definition of a filter strip as a permanent, maintained strip of planted or indigenous vegetation between nonpoint pollution sources and receiving waters. The strip is designed for sheet flow, not concentrated flow, so flow-concentrating surface features are not acceptable. It is best suited to roads, highways, roof downspouts, small parking lots and pervious surfaces. In highly impervious areas the manual says to use it as pretreatment for infiltration trenches or bioretention rather than as a standalone practice. Its main target is suspended solids, with some reduction of hydrocarbons, metals and nutrients.
Key design numbers
| Item | What the manual says |
|---|---|
| Minimum recommended length | 25 feet; shorter strips still provide some benefit |
| Strip slope | Never over 8%; under 5% preferred |
| Contributing area slope | Generally under 5% unless energy dissipation is provided |
| Strip width | At least the width of the contributing area |
| Drainage area to strip area | Not more than 6:1 |
| Maximum lateral slope | 1% |
| Seasonal high water table | 2 to 4 feet below any point on the strip |
| Drain-down | Maximum 72 hours |
Pollutant removal figures in the manual are 30% for total suspended solids, 20% for total phosphorus and 10% for nitrate. Volume reduction and recharge are rated Low to Medium, and peak rate control Low.
Length depends on cover and soil
Length depends on slope, vegetative cover and soil type. The manual’s example for Type C soil on a 6% slope calls for 100 feet of turf grass, 75 feet of native grasses with some trees, or 50 feet of indigenous woods, and notes that turf needs the longest strip. If the required length is not available, the strip still works but is less effective. Vegetation options are turf grass, meadow grasses, shrubs and native plants including trees, or indigenous woods, and native vegetation is preferred.
Level spreaders and extras
- Level spreaders: recommended to turn concentrated flow into sheet flow. Options include a geotextile-lined gravel trench (typically 12 inches wide and 24 to 36 inches deep), curb stops, a concrete sill, slotted or depressed curbs, or an earthen berm with perforated pipe.
- Pervious berm (optional): 6 to 12 inches high, built of sand, gravel and sandy loam, with an outlet pipe or weir to drain within 24 hours.
- Check dams: for slopes over 5%, in durable nontoxic materials such as rock, brick or wood, no more than 6 inches high.
- Bypass and traffic: install berms or curbs along the sides to prevent bypass, and discourage foot and vehicle traffic with a visible barrier.
For cold climates the manual says to use salt-tolerant vegetation, remove sand buildup at the toe, set trench bottoms below the frost line, use perforated pipe at least 8 inches in diameter, and consider backup practices for winter. Compacted soils should be tilled to 12 to 18 inches.
Construction sequence in brief
- Start only after upslope areas are stabilized and erosion controls are in place.
- Rough grade with light equipment, avoiding compaction, and build the level spreader without compacting its subgrade.
- Fine grade carefully, because small irregularities can disrupt sheet flow.
- Seed or sod, and stabilize seeded areas with matting or blankets maintained for at least 75 days after the season’s first storm.
- Remove temporary controls only after full stabilization, and allow at least one full growing season before upland flow reaches the strip.
Maintenance
The manual says to inspect quarterly for the first two years, then biannually, and after storms over 1 inch during establishment. Remove sediment when buildup exceeds 2 inches, fill rills under 12 inches wide with crushed gravel and regrade wider channels. Standing water should not persist beyond 48 to 72 hours. Mow to 4 to 6 inches, or 6 inches in fall, only when the soil is dry. Keep at least 85% vegetative cover and reestablish if damage exceeds 50%.
Cost
The manual gives a construction range of $0 to $50,000 per acre and annual maintenance of $100 to $1,400 per acre, in the manual’s own dollars. It says land is the main cost, so a strip is most practical where unused land is available.
Where the manual is inconsistent
- Length table: the table titled as required length lists only maximum slopes by soil group and cover, with no lengths.
- Drain-down: the optional berm must drain within 24 hours, while maintenance allows the strip up to 72 hours. The two are not reconciled.
- Check dam size: the variations section limits check dams to 6 inches high, while the specifications give wood check dams as 6 to 12 inches in diameter.
- Ranges and wording: standing water and water table limits are given as ranges, and “biannually” could mean twice a year or every two years.
Pennsylvania approvals and who designs it
A filter strip counted toward a stormwater plan needs a qualified professional for sizing, grading and level spreader design, and may need approval from your municipality, the county conservation district or DEP. Check whether an erosion and sediment plan or NPDES permit applies (see Chapter 102 and PA stormwater plan rules). Our swale guide and infiltration trench guide cover practices a strip can discharge to or pretreat.
Sources
- Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.4.9 Vegetated Filter Strip, via the PA DEP eLibrary (greenport.pa.gov). Checked Nov 23, 2026.
Related
All drainage guides · Infiltration berm · Infiltration basin · Curtain drains
FAQ
How long should a vegetated filter strip be?
The PA BMP Manual recommends a minimum length of 25 feet, though shorter strips still provide some benefit. Required length depends on slope, vegetative cover and soil type.
How steep can a filter strip be?
The manual says slope should never exceed 8%, with slopes under 5% preferred.
Is a filter strip a standalone practice?
In highly impervious areas the manual says to use it as pretreatment for infiltration trenches or bioretention, not as a standalone practice.
Why are level spreaders recommended?
The strip is designed for sheet flow, and level spreaders are recommended to spread runoff evenly across the strip.
Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov 23, 2026.