Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

Infiltration Trench: What the PA Stormwater BMP Manual Says

Home / Drainage guides / Infiltration trench

Infiltration trench: how the PA BMP Manual describes it

Quick answer: In the Pennsylvania Stormwater Best Management Practices Manual, an infiltration trench is a linear, stone-filled trench with a continuously perforated pipe, designed with a positive overflow and meant to empty within 72 hours. It is a regulated stormwater practice, not a casual yard project.

What it is

The manual (BMP 6.4.4) describes an infiltration trench as a continuously perforated pipe, set at a minimum slope, inside a stone-filled trench. It is usually part of a conveyance system, so large storms pass through the pipe while some of the runoff volume soaks into the ground. The manual says every infiltration trench is designed with a positive overflow, and that stone depth is recommended to be no more than six feet. Unlike an infiltration bed, a trench can be built without heavy equipment driving into it.

Where the manual says it fits

  • Roof leaders: roof runoff often carries little sediment, so it suits a trench. The manual calls for a cleanout with a sediment sump between the building and the trench.
  • Inlets, catch basins and area drains: sediment and debris must be dealt with, using a sediment trap below the pipe invert and a water quality insert or other pretreatment in high-traffic or high-sediment areas.
  • With vegetated filters: a trench can follow or combine with a vegetative filter, grassed swale or similar element.

The manual also says a trench is not for use in hot spot areas without pretreatment. A trench can sit beside roads or paved areas, but the drainage should run downhill away from the pavement subbase, or the trench should sit below the subbase.

Key design numbers

ItemWhat the manual says
Trench width3 to 8 feet
Stone depthRecommended no more than 6 feet
BottomLevel, or sloped no more than 1%; steps allowed on steeper grades
StoneAASHTO No. 3 (2-inch to 1-inch), washed, about 40% voids
PipeContinuously perforated, smooth interior, 8-inch minimum inside diameter, cleanouts or inlets at both ends and at intervals
GeotextileNonwoven, wrapping top, sides and bottom, at least 16 inches of overlap
CoverAt least 6 inches of vegetated topsoil
DrawdownInfiltrate or empty within 72 hours

Infiltration volume is calculated as bottom area times the design infiltration rate (inches per hour) times the infiltration period (hours) times 1/12, and the infiltration period may not exceed 72 hours. The manual’s stated performance figures are 85% for total suspended solids and total phosphorus and 30% for nitrate.

Soils come first

The trench must sit on uncompacted soil, and the subgrade cannot be compacted during construction. The manual requires soil investigation and percolation testing, pointing to Protocol 2 in Appendix C and the Guidelines for Infiltration Systems for water table depth. That section of the manual does not give numeric distances for bedrock separation, well or foundation setbacks, or karst limits. Those must be taken from the appendix and from local rules. See our guides on percolation testing and soil infiltration rate.

Construction sequence in brief

  1. Protect the area from compaction and install the trench late in construction, keeping sediment-laden water out.
  2. Excavate to a level, uncompacted subgrade free of rock and debris.
  3. Line bottom and sides with nonwoven geotextile.
  4. Place stone in 8-inch lifts, lightly compacted, and set the perforated pipe.
  5. Fold the fabric over the top, add 6 inches of topsoil, then seed and stabilize.
  6. Remove any sediment from inlets within 24 hours and keep erosion controls until the site is stabilized.

Maintenance

The manual says to inspect and clean catch basins and inlets at least twice a year, keep surface vegetation healthy, and reseed bare spots promptly. Do not park or drive on a vegetated trench, and avoid compaction from mowers. A trench that clogs with sediment stops infiltrating, which is why pretreatment and cleanouts matter.

Where the manual contradicts itself

  • Surface: the variations section allows a gravel surface, but the design elements require at least 6 inches of vegetated topsoil.
  • Geotextile values: the trench specification lists the tests (grab tensile, Mullen burst, flow rate) without numbers, while the infiltration bed and dry well specifications give values.
  • Pipe size: the trench calls for an 8-inch minimum, the infiltration bed 6 inches and the dry well 4 inches. These are different practices, so treat them as variations.

Pennsylvania approvals and who designs it

Sizing, soil testing and overflow design need a qualified professional such as a licensed engineer, and a trench used for stormwater control may need approval from your municipality, the county conservation district or DEP. Check whether an erosion and sediment plan or NPDES permit applies (see Chapter 102 and PA stormwater plan rules). For related drainage parts, see perforated drain pipe, geotextile fabric, and the glossary entries for infiltration trench and positive overflow.

Sources

  • Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.4.4 Infiltration Trench, via the PA DEP eLibrary (greenport.pa.gov). Checked Nov 23, 2026.

Related

All drainage guides · Curtain drains · Install a dry well · Build a drainage swale

Get a quote

FAQ

How long should an infiltration trench take to drain?

The PA BMP Manual says the trench should infiltrate or empty within 72 hours, and the infiltration period cannot exceed 72 hours.

How wide and deep can the trench be?

The manual gives a width of 3 to 8 feet and recommends stone depth of no more than 6 feet.

Can a trench be used where the soil is compacted?

The manual says the trench goes on uncompacted soil and requires soil investigation and percolation testing first.

Is a gravel surface allowed?

The manual is inconsistent: its variations section allows a gravel surface, but the design elements call for at least 6 inches of vegetated topsoil.

Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov 23, 2026.