Constructed wetland: how the PA BMP Manual describes it
Quick answer: In the Pennsylvania Stormwater Best Management Practices Manual, BMP 6.6.1 Constructed Wetland is a shallow marsh system with a permanent water surface and emergent vegetation. It needs a large footprint and drainage area, and it is mainly a peak rate and water quality practice rather than a volume reducer.
What it is
The manual describes shallow marsh systems that can reduce peak rates and volume only to a certain degree. Variations are shallow wetlands, extended-detention shallow wetlands, pocket wetlands (serving roughly 5 to 10 acres), pond and wetland systems, and subsurface-flow wetlands. Stated performance is Low volume reduction, Low recharge, High peak rate control and High water quality, with 85% for TSS and TP and 30% for nitrate.
Key design numbers
| Item | What the manual says |
|---|---|
| Drainage area | At least 10 acres, or 5 acres for pocket wetlands, or a constant inflow source |
| Wetland size | 3% to 5% of the drainage area |
| Open water | 18 inches to 6 feet deep, about 35% to 40% of surface area |
| Low marsh / high marsh | 6 to 18 inches deep / up to 6 inches deep |
| Length to width | At least 2:1 |
| Side slopes | 4:1 to 5:1 where possible |
| Forebay | 10% to 15% of permanent pool volume, 4 to 6 feet deep |
| Buffer | 25 feet from the maximum water surface |
| Maintenance access | At least 9 feet wide, maximum slope 15% |
Siting limits include not within 10 feet of a property line or 50 feet of a private well or septic system. Areas deeper than 4 feet get two safety benches, each 4 to 6 feet wide. Outlet orifices are at least 2.5 inches in diameter, and an online facility needs an emergency spillway passing the 100-year storm with 1 foot of freeboard.
Soils, planting and DEP dam rules
Hydrologic soil groups C and D are suitable as they are, while A and B soils may need a liner, and soils must be tested. If a liner is used it needs at least 12 inches of subsoil over it, and marsh topsoil is at least 12 inches. The emergent zone should be about 60% to 65% of the normal water surface, split roughly half high marsh and half low marsh. The manual flags possible PADEP dam regulation (Title 25, Chapter 105) if the drainage area is over 100 acres, the embankment is over 15 feet or the capacity is over 50 acre-feet.
Construction and maintenance
The 10-step sequence starts with diverting flows and stabilizing the adjacent area, and says matching the design grades when placing planting soil is crucial. Maintenance is heavy early on: inspect every 2 to 3 weeks in the first growing season, at least 4 times a year for the first 2 years and after storms over 2 inches in 24 hours, and support the plants for the first 3 years. Keep at least 85% emergent cover, and remove forebay sediment before it is 50% full, typically every 3 to 7 years. Nutrients may be released by decaying plants.
Where the manual contradicts itself
- Drainage area: “5 to 10 acres” in the key elements, 10 acres (5 for pocket wetlands) in the design considerations.
- Soils: the key elements call for relatively impermeable soils or a liner, yet C and D soils are allowed without modification.
- Permanent water: a permanent water surface is required, yet the shallow marsh may be dry at the surface for up to one month.
- Construction order: subsoil grading comes after embankments and structures in the sequence, though the specifications imply compaction follows excavation right away.
- Benches and sediment: 6.6.1 uses 4 to 6 foot benches and removes forebay sediment every 3 to 7 years, while BMP 6.6.2 uses a different bench layout and 5 to 10 years.
- Old cost figures (2004 dollars): $30,000 to $65,000 per acre, with annual maintenance 2% to 5% of capital and “very little data.” Treat as dated.
Pennsylvania approvals and who designs it
A constructed wetland is an engineered basin and needs a qualified professional such as a licensed engineer or wetland specialist. It requires municipal approval and may trigger DEP permits, including erosion and sediment control and, for larger embankments, dam rules. Check Chapter 102 and PA stormwater plan rules.
Sources
- Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.6.1 Constructed Wetland, via the PA DEP eLibrary (greenport.pa.gov). Checked Nov 23, 2026.
Related
All drainage guides · Infiltration basin · Riparian forest buffer
FAQ
How big is a constructed wetland compared with its drainage area?
The PA BMP Manual says the wetland area is 3% to 5% of the drainage area.
How much drainage area is needed?
The manual is inconsistent: 5 to 10 acres in the key elements, and at least 10 acres (5 for pocket wetlands) in the design considerations.
Does it need a liner?
The manual says C and D soils are suitable as they are, A and B soils may need a liner, and soils must be tested.
When might DEP dam rules apply?
The manual says possibly if the drainage area is over 100 acres, the embankment over 15 feet or the capacity over 50 acre-feet.
Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov 23, 2026.