Home / Drainage guides / Subsurface infiltration bed

Subsurface infiltration bed: what the PA BMP Manual says

Quick answer: In the Pennsylvania Stormwater BMP Manual, a subsurface infiltration bed is a buried stone storage bed under 12 to 18 inches of vegetated soil. The manual calls for 2 feet of separation to the water table and bedrock, a maximum 5:1 impervious-to-infiltration ratio, and a positive overflow.

What it is

BMP 6.4.3 in the Pennsylvania Stormwater Best Management Practices Manual describes a subsurface infiltration bed as a vegetated, highly pervious soil layer sitting over a uniformly graded aggregate storage bed. It suits flat open spaces such as lawns, meadows and playfields downhill from impervious areas. Beds can be stepped or terraced on slopes as long as each bed bottom stays level. Because the infiltration surface is typically below the frost line, the manual says the system functions year-round. Plastic storage cells are listed as an alternative that can more than double storage compared with stone, at a substantially higher cost.

Key design elements

  • At least 2 feet of separation to the seasonally high water table and to bedrock.
  • A distributed infiltration area with a maximum 5:1 impervious-to-infiltration ratio.
  • Natural, uncompacted soils with acceptable infiltration capacity, and no bed bottom on compacted fill.
  • Open-graded, clean stone with at least 40% void space, wrapped in nonwoven geotextile.
  • A perforated pipe network along the bed bottom and a positive overflow.
  • Protection from sediment during construction.

Design numbers

ItemWhat the manual says
Aggregate section12 to 36 inches, uniformly graded, clean-washed, such as AASHTO No. 3
Soil cover over the bed12 to 18 inches
Bed bottomLevel, or sloped no more than 1%
Surface grading1% to 3%
Outlet pipe top4 inches below the top of the aggregate, with multiple discharge points
Surface pondingUnder 6 inches may be allowed for added capacity
GeotextileNonwoven, 16-inch overlaps, secured at least 4 feet outside the bed during construction

The manual rates the practice High for volume reduction, recharge and water quality, and Medium to High for peak rate control, with removal figures of 85% for total suspended solids, 85% for total phosphorus and 30% for nitrate. Infiltration volume is bed bottom area times the design infiltration rate (inches per hour) times the infiltration period (hours) times 1/12, with the period set at 2 hours or the time of concentration, whichever is larger.

Where it connects

Roof leaders can connect directly to the perforated piping, with cleanouts and a sediment sump still recommended. Catch basins, inlets and area drains can also connect, with sediment traps below the discharge inverts. The manual says to consider pretreatment, such as filters or wetlands, where spills or groundwater contamination are a threat, and to consider carefully whether a bed suits hot spots such as fueling stations. An excavated bed can serve as a temporary sediment basin during construction if it is excavated at least 1 foot above the final bed bottom.

Construction sequence in brief

  1. Install toward the end of construction if possible, and keep erosion and sediment controls in place.
  2. Do not compact the subgrade or run heavy equipment over it before the fabric and stone go in.
  3. Remove fine accumulations and scarify the soil to at least 6 inches, then grade the bottom level by hand.
  4. Install control structures, cleanouts and perforated piping.
  5. Place geotextile, then stone in lifts of 8 inches or less, lightly compacted, keeping equipment off the bottom.
  6. Place soil media in lifts of 6 inches or less, seed, and keep inlet protection until the site is stabilized.

Maintenance

The manual says to inspect and clean all catch basins and inlets at least twice a year, keep vegetation over the bed in good condition, and revegetate bare spots quickly. Vehicles should be prohibited on the infiltration area, and mower compaction avoided. If access is needed, the manual suggests considering permeable turf reinforcement. The cost section lists a typical construction cost of about $5.70 per square foot, assuming 2.0 feet of aggregate, but warns that actual cost varies with design and site conditions.

Where the manual is inconsistent or silent

  • Drain time: the section gives no numeric drain time and defers to Chapter 3 criteria, while the infiltration basin section uses 72 hours and the pervious pavement section caps the infiltration period at 72 hours. Here the period is 2 hours or time of concentration with no cap.
  • Stone size: the design considerations describe No. 3 stone as 1 to 2 inches, while the pervious pavement section gives 1.5 to 2.5 inches in one place and 2 to 1 inch in its specification.
  • Pretreatment: one design consideration requires a water quality inlet or sumped catch basin for all surface inlets, while the applications text says a water quality insert may be needed only in high-traffic or high-sediment areas.
  • Cross-references: the specifications point to compost amendment under a BMP number that differs from the manual’s table of contents.

Pennsylvania approvals and who designs it

A subsurface bed is an engineered, buried facility. Sizing, soil testing, overflow design and the pipe layout need a qualified professional, and the project may need approval from your municipality, the county conservation district or DEP. Check whether an erosion and sediment plan or NPDES permit applies (see Chapter 102 and PA stormwater plan rules). Our permeable pavers guide covers the paved-surface version of an infiltration bed.

Sources

  • Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.4.3 Subsurface Infiltration Bed, via the PA DEP eLibrary (greenport.pa.gov). Checked Nov 23, 2026.

Related

All drainage guides · Infiltration trench · Infiltration basin · Drawdown time

Get a quote

FAQ

How deep is the stone layer in a subsurface infiltration bed?

The PA BMP Manual calls for an aggregate section of 12 to 36 inches, uniformly graded and clean-washed, with at least 40% void space.

How much soil goes over the bed?

The manual lists a soil cover of 12 to 18 inches above the bed, planted with native grasses, meadow mix or low dense vegetation.

Can it work in winter?

The manual says the infiltration surface is typically below the frost line, so the system functions year-round.

How far must the bed bottom be above the water table and bedrock?

The manual lists a minimum 2-foot separation to the seasonally high water table and to bedrock.

Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov 23, 2026.