PCSM stormwater analysis under 25 Pa. Code 102.8(g) and (h): storm sizes and special protection waters
Paragraph (g) of 25 Pa. Code 102.8 is the part of the post construction stormwater management (PCSM) rule that deals with numbers. It names the 2-year/24-hour storm for volume and water quality, and the 2-, 10-, 50- and 100-year/24-hour storms for peak rate. Paragraph (h) adds antidegradation steps for discharges to High Quality (HQ) or Exceptional Value (EV) waters.
General information only, not legal advice. This page paraphrases the regulation text. Verify against the current source before relying on any figure. Where the source was silent, this page says “not stated.” For the plan contents, see our PCSM plan contents page.
Where paragraph (g) applies
The stormwater analysis in (g) applies to most permitted activities. It does not apply to site restoration or reclamation activities, or to the small activities covered by paragraph (n). Paragraph (n) lists, among others, DEP-permitted activities that disturb less than 1 acre. Which category a specific project falls in is not decided here; ask the conservation district or DEP.
Step one: site characterization (g)(1)
The source calls for a predevelopment assessment of soil and geology, including infiltration and geotechnical studies. The assessment must show the test site locations, depths and methods. The paragraph does not give a number of tests or a required depth: not stated. For the glossary meaning of a related field test, see perc test, and for soil groups see hydrologic soil group.
Step two: volume and water quality (g)(2)
An applicant must either meet the volume and water quality requirements of an applicable current Act 167 plan, or manage the net change in runoff for storms up to and including the 2-year/24-hour event. Our Act 167 stormwater plans page covers those county plans. Four criteria shape how the net change is figured:
- (i) Existing nonforested pervious areas are treated as meadow in good condition, with exceptions for certain roadway, rail and utility work that returns the area to its existing condition.
- (ii) Existing impervious area: where impervious area exists, 20% of the impervious area to be disturbed is treated as meadow in good condition or better, with the same exceptions.
- (iii) When 20% is impracticable: where existing site conditions present public health, safety or environmental limits, the applicant may show that the 20% target is impracticable. The applicant must then maximize volume reduction and treatment.
- (iv) Alternatives: alternative approaches are allowed if they are more protective, or if they maintain existing hydrology, water quality and erosive conditions.
The section does not say how “meadow in good condition” is converted into a runoff number; that method is not stated in this paragraph. For the glossary definition of the surfaces involved, see impervious surface.
Step three: peak rate (g)(3)
For peak rate, the applicant must meet the rate requirements of an applicable Act 167 plan, or manage the net change in peak rate for the 2-, 10-, 50- and 100-year/24-hour storms so that it does not exceed preconstruction rates.
| Item | What the source says |
|---|---|
| Storms for peak rate | 2-, 10-, 50- and 100-year/24-hour |
| Storm for volume and quality | Up to and including the 2-year/24-hour |
| Computations | Hydrologic computations or routing analysis are required |
| Exempt | DEP-approved direct discharges to tidal areas, or approved no-detention areas |
| Alternatives | Allowed if more protective or if they preserve preconstruction hydrology |
Documentation and extra requirements (g)(4) to (g)(6)
- The applicant must document the methods used to calculate total runoff volume and peak rate.
- The applicant must describe construction techniques or special measures for soil and geologic limitations.
- DEP, or a conservation district after consulting DEP, may require more information or additional BMPs on a case-by-case basis.
Special protection waters: paragraph (h)
For activities that discharge to HQ or EV waters, the applicant must satisfy antidegradation requirements under 25 Pa. Code 93.4c(b). Paragraph (h) breaks that into three parts:
- Evaluate and include nondischarge alternatives, unless none exist for the project.
- If the applicant shows that none exist, include ABACT (Antidegradation Best Available Combination of Technologies), subject to an exception in 93.4c(b)(1)(iii).
- Use the design standards in the Pennsylvania Stormwater Best Management Practices Manual (No. 363-0300-002, December 2006, as amended).
The paragraph does not define HQ or EV classifications itself; those come from Chapter 93, which the section references. How to look up a stream’s classification is not stated in this paragraph. The manual named in (h)(3) is the same one that supports pages in our drainage guides, such as the infiltration basin and rain garden pages.
How this fits with the rest of Chapter 102
The PCSM plan must contain a net change in runoff volume and rate (item 4 of 102.8(f)), and (g) is the section that supplies the standard for that change. The E&S side, with its own plan contents, is on our E&S plan contents page. The design manuals that 102.11 points to are on the 102.11 page.
What this page does not say
- Rainfall depths for each storm: not stated in the section.
- Software or calculation methods to use: not stated in the section.
- Fees or review times: not stated in the section.
Sources
- 25 Pa. Code 102.8, PCSM requirements (Cornell Legal Information Institute, checked Nov 23, 2026)
Related
All Pennsylvania site work regulations · NPDES overview · PCSM glossary
FAQ
Which storm does 102.8(g) use for volume and water quality?
Applicants meet an applicable Act 167 plan, or manage the net change in runoff for storms up to and including the 2-year/24-hour event.
Which storms are used for peak rate?
The 2-, 10-, 50- and 100-year/24-hour storms, so that the net change in peak rate does not exceed preconstruction rates.
What is the 20% meadow rule?
Where impervious area exists, 20% of the impervious area to be disturbed is treated as meadow in good condition or better, with listed exceptions.
What extra steps apply near HQ or EV waters?
Paragraph (h) calls for evaluating nondischarge alternatives, ABACT if none exist, and use of the BMP Manual design standards.
General information only. This page does not state or imply that any company complies with these rules, and it is not legal advice. The regulation text and DEP control. Source checked Nov 23, 2026; verify against the current source.