Perc Test (Percolation Test): PA Chapter 73 Requirements
A perc test, short for percolation test, measures how quickly water drops in a hole dug into the soil. In Pennsylvania, 25 Pa. Code Section 73.15 sets out how the test is run for on-lot sewage systems: how many holes, how big, how they are prepared and presoaked, and how readings are taken and averaged into a rate in minutes per inch.
Perc test and the terms around it
- Percolation test: according to 25 Pa. Code 73.15 as published by Cornell’s Legal Information Institute, a test using holes in the proposed absorption area to find an average percolation rate.
- Percolation rate: the drop in water level in the final test period, expressed in minutes per inch.
- Absorption area: the part of the lot where the sewage system’s effluent will be spread into the soil. Only holes inside the proposed area count toward the average.
- Limiting zone: the seasonal high water table, rock formation or other slowly permeable layer that sets how deep the test hole goes. See setback for another distance rule that shapes where a system can sit.
- Presoak: filling the hole with water ahead of the readings so the test reflects steady conditions.
Why it matters on a job
On a lot without public sewer, the soil has to be able to take in treated effluent, and the perc test is one of the ways that capacity is judged. It matters to anyone buying a lot, planning an addition that could affect a system, or siting a patio, a pool or a wall near an absorption area. The same idea, how fast water moves into soil, also drives stormwater features such as an infiltration trench, a dry well or a rain garden. Those are covered by different rules, and this page is only about the sewage percolation test in Chapter 73.
What 25 Pa. Code 73.15 sets
The section is written in numbered paragraphs. It provides:
- Number and location, (1) and (2): six or more tests, in separate holes spaced uniformly over the proposed absorption area. Only holes within that area are used in the arithmetic average.
- Hole size, (3): a uniform diameter of 6 to 10 inches.
- Hole depth, (3): if the limiting zone is 60 inches or more below the mineral soil surface, dig to the depth of the proposed absorption area. If a seasonal high water table, rock formation or similar slowly permeable condition is less than 60 inches down, the depth is 20 inches. If the limiting condition is rock with open joints, fractures or solution channels, or loose rock fragments without enough fine soil, the depth is 8 inches above the limiting zone or 20 inches, whichever is less.
- Preparation, (4): scarify the bottom and sides to remove smeared soil and expose a natural interface, remove loose material, and place 2 inches of coarse sand or fine gravel in the bottom.
- Presoak, (5): fill to at least 12 inches over the gravel and let it stand 8 to 24 hours. Immediately before testing, keep at least 6 inches over the gravel, readjusting every 30 minutes for 1 hour.
Scarifying here means roughening the hole surfaces so smeared soil does not seal them. It is a different meaning of the word than the lawn-care use.
Readings and the average
The reading interval depends on the water drop in the last 30 minutes of the final presoak. If water remains, readings are taken every 30 minutes. If no water remains, readings may be taken every 10 minutes. Readings are measured from a fixed reference point and continue until at least eight are complete or a stabilized rate is reached, whichever comes first. A stabilized rate is a difference of 1/4 inch or less between the highest and lowest of four consecutive readings. The drop in the final period, in minutes per inch, goes into the average.
Two special cases are spelled out. A hole with no measurable rate is assigned 240 minutes per inch for the average, and the area may be placed over those holes if the average falls within the limits in 25 Pa. Code 73.16, Table A. A hole that is dry at the end of a 10-minute interval is left out of the average. If one-third or more of the holes are dry at that point, the area may not be designed or installed over them unless the local agency finds an anomaly caused the fast rate and a retest falls within acceptable limits. If no anomaly is found, the agency may accept results from the remaining holes if additional testing outside the area of the dry holes supplements them.
What this page does not cover
This page does not say who may conduct the test, and it does not list the acceptable rate limits, which are in Section 73.16. The test is one part of a larger site evaluation and permit process run by the local sewage enforcement office. Rules change, so verify against the current 25 Pa. Code and with the local agency before relying on anything here. For a lot-specific answer, contact the local sewage enforcement officer.
Perc test FAQ
How many test holes does Pennsylvania require?
Six or more, in separate holes spaced uniformly over the proposed absorption area, under 25 Pa. Code 73.15(1).
How big are the test holes?
A uniform diameter of 6 to 10 inches. Depth depends on the limiting zone and can be the depth of the proposed absorption area, 20 inches, or 8 inches above the limiting zone, whichever the section calls for.
How long is the presoak?
The initial presoak stands 8 to 24 hours with at least 12 inches of water over the gravel. The final presoak keeps at least 6 inches over the gravel, readjusted every 30 minutes for 1 hour.
What happens if a hole has no measurable rate?
It is assigned 240 minutes per inch for the average, and the area may be placed over it if the average is within the limits in 73.16, Table A.
Sources
Descriptions here are summaries of the regulation. Verify against the current source and with your local sewage enforcement office, which govern.
Keep reading
- Hardscape and Site Work Glossary
- Related terms: infiltration trench, dry well, rain garden, setback and easement
Planning site work on a rural lot in central PA? Contact Muthler Landscaping & Construction for a straight answer. Planning information, not engineering advice.