PCSM (Post-Construction Stormwater Management)

PCSM stands for post-construction stormwater management: how a site handles runoff after the earth disturbance is finished and the ground is permanently stabilized.

What it means

Pennsylvania’s Chapter 102 defines PCSM as stormwater management after earth disturbance is complete and the site is permanently stabilized. A PCSM plan is a site-specific plan with drawings and a narrative that identifies BMPs for managing changes in runoff volume, rate and quality. It is separate from the E&S plan, which covers the construction period.

When it applies

DEP’s E&S FAQ says that barns and houses that disturb one acre or more need NPDES coverage and post-construction stormwater management. Section 102.8 also says to minimize impervious areas. At project close-out, record drawings and a licensed professional’s certification go in with the notice of termination.

In the field

Typical PCSM measures include things like a dry well, an infiltration trench or a vegetated swale. Which ones your site needs is set in your approved plan. Your county conservation district can tell you the local steps.

What a PCSM plan must contain

Section 102.8(f) lists the minimum contents. The plan must show existing topography, soil and geologic conditions, and past, present and proposed land uses. It must state the net change in stormwater volume and rate for the whole site and for each drainage area, and name the receiving surface waters with their Chapter 93 classification. It must give the location, type and construction details of each BMP along with permanent stabilization specifications, an implementation sequence, and an inspection schedule for critical stages. Supporting calculations and drawings are required. So is a long-term operation and maintenance schedule covering inspections, repairs, written inspection reports and access, plus procedures for recycling or disposing of BMP-related materials. The plan also has to identify geologic or soil conditions that could cause pollution after construction, and thermal impacts.

Volume and rate targets

Under 102.8(g), BMPs must either meet the applicable Act 167 volume and water quality requirements or manage the net change in runoff volume for storms up to and including the 2-year, 24-hour event. For rate, they must meet the applicable Act 167 rate requirements or keep peak rates for the 2-, 10-, 50- and 100-year, 24-hour storms from exceeding preconstruction rates. Existing nonforested pervious areas are treated as meadow in good condition, and 20% of the existing impervious area being disturbed is also treated as meadow in good condition or better, with exceptions for certain roadway, rail and utility work. For High Quality or Exceptional Value receiving waters, the applicant must evaluate nondischarge alternatives and, if none exist, include ABACT. The general planning goals in 102.8(b) also apply to the extent practicable, including minimizing impervious areas, land clearing and grading, and soil compaction.

Who designs it, builds it and maintains it

The plan must be prepared by a person trained and experienced in PCSM design methods. Unless DEP approves otherwise, it is a separate document from the E&S plan, labeled PCSM or Post Construction Stormwater Management Plan, and it is the final construction plan. A licensed professional or designee must be onsite and responsible during critical stages, which may include installing underground treatment or storage BMPs and structurally engineered BMPs. After construction, long-term maintenance falls to the permittee or co-permittee unless the notice of termination names another person who has agreed to take it on. The permittee must also record an instrument with the recorder of deeds so the BMP shows up in a title search. DEP’s FAQ gives detention basins, rain gardens, and revegetation and soil restoration as examples of PCSM BMPs. This is planning information, not legal advice, so confirm your project’s requirements with your conservation district.

Frequently asked questions

What is the difference between E&S and PCSM?

E&S controls erosion during construction. PCSM manages stormwater from the finished, stabilized site.

Does a backyard patio need a PCSM plan?

DEP’s FAQ ties PCSM to NPDES coverage at one acre of disturbance. A small patio is usually well below that, but your township may have its own stormwater rules.

Where do the rules live?

25 Pa. Code 102.8 covers PCSM requirements, and 102.1 has the definitions.