Site stabilization under 25 Pa. Code 102.22: the 70% cover and 4-day numbers
Section 102.22 of Title 25 is the Pennsylvania rule on site stabilization. It has two halves. Permanent stabilization means a minimum uniform perennial vegetative cover of 70%, or an acceptable permanent BMP. Temporary stabilization is triggered when earth disturbance pauses for more than 4 days. The only two numbers in the section are 70% and 4 days. The federal construction stormwater rule uses a different trigger of 14 calendar days, covered below and labeled as federal.
General information only, not legal advice. This page paraphrases summaries of the regulation text read on Nov 23, 2026. Verify against the current sources before relying on any number. Anything the sources did not state is marked “not stated.”
Permanent stabilization: 102.22(a)
When an earth disturbance activity, or any stage or phase of one, is finally complete, the site must be permanently stabilized right away. The section says this can involve restoring, replacing or amending topsoil, then seeding, mulching or using another method that protects the site from accelerated erosion and sedimentation. See our glossary entries on topsoil stripping, mulch and hydroseeding for the plain meaning of those methods.
Temporary controls stay until stabilization: (a)(1)
Erosion and sediment (E&S) controls must stay in place and be maintained until permanent stabilization is complete. After that, the temporary controls can be removed. Any ground disturbed while removing them must be permanently stabilized once removal is finished. Examples of such temporary controls in our glossary include silt fence and compost filter sock.
What counts as “permanently stabilized”: (a)(2)
An area qualifies in either of two ways:
- It has a minimum uniform perennial vegetative cover of 70%, dense enough to resist accelerated erosion and sedimentation.
- It is covered by an acceptable BMP that permanently minimizes erosion and sedimentation.
How cover is measured, such as by area counts or photographs, is not stated in the section. This definition also matters for ending permit coverage, because 102.7(a) ties the notice of termination to permanent stabilization as defined here. See our notice of termination page.
Temporary stabilization: 102.22(b)
If earth disturbance stops temporarily and the pause will last more than 4 days, the site must be immediately seeded, mulched or otherwise protected from erosion and sedimentation until work resumes. An area qualifies as temporarily stabilized in either of two ways:
- It has a minimum uniform coverage of mulch and seed, dense enough to resist accelerated erosion and sedimentation.
- It is covered by an acceptable BMP that temporarily minimizes erosion and sedimentation.
Unlike the permanent standard, the temporary standard gives no percentage: not stated. For the glossary meaning of some acceptable-BMP candidates, see erosion control blanket and surface roughening. Whether a given product meets the “acceptable BMP” wording is decided by the design standards in the manual named in 102.11, covered on our 102.11 page.
Side by side
| Item | Permanent (102.22(a)) | Temporary (102.22(b)) |
|---|---|---|
| Trigger | Activity, or a stage or phase of it, is finally complete | Disturbance stops temporarily for more than 4 days |
| Timing | Right away | Immediately |
| Vegetation standard | Minimum uniform perennial cover of 70% | Minimum uniform mulch and seed coverage, no percentage stated |
| BMP alternative | Acceptable BMP that permanently minimizes erosion and sedimentation | Acceptable BMP that temporarily minimizes erosion and sedimentation |
The federal comparison: 40 CFR 450.21(b)
This section is federal, not Pennsylvania, and is labeled so. The federal construction and development rule, 40 CFR 450.21(b), says stabilization of disturbed areas must start immediately in two situations: when earth-disturbing work has permanently stopped on any part of the site, or when the work has stopped temporarily and will not resume for more than 14 calendar days. A pause of 14 days or less does not by itself start the requirement. The federal text also says that in arid, semiarid and drought-stricken areas, where starting vegetative stabilization right away is infeasible, the permitting authority specifies alternative measures. The permitting authority sets the period within which stabilization must be finished. Stabilization may not be required in limited circumstances where a part of the site’s intended function requires it to stay disturbed.
The federal text read for this page did not mention frozen ground or a 7-day deadline for sensitive waters or steep slopes. Section 102.11(c) of the Pennsylvania rules says activities needing an NPDES permit must also comply with 40 CFR Part 450 where applicable and consistent with state law, and that the state provision applies in a conflict unless the federal one is more stringent. How the 4-day and 14-day numbers interact on a specific permitted site is not stated in the sources read. Our NPDES overview also quotes the federal 14-day trigger.
Related federal minimums in paragraph (a)
The federal paragraph (a) lists minimum erosion and sediment controls that touch stabilization. They include minimizing the amount of soil exposed during construction, minimizing disturbance of steep slopes, minimizing soil compaction except where the area’s intended function requires it, and preserving topsoil unless infeasible. It also calls for natural buffers around waters of the United States and runoff directed to vegetated areas, unless infeasible. Stockpiles are not mentioned in the federal text read.
What this page does not say
- Seed mixes, mulch rates or planting dates: not stated in 102.22.
- A deadline for finishing permanent stabilization after work ends beyond “right away”: not stated.
- Frozen-ground rules: not stated in the sources read.
Sources
- 25 Pa. Code 102.22, Site stabilization (Cornell Legal Information Institute, read Nov 23, 2026)
- 40 CFR 450.21, Effluent limitations (federal, via Cornell Legal Information Institute, read Nov 23, 2026)
Related
All Pennsylvania site work regulations · E&S plan contents · Chapter 102 thresholds
FAQ
What percent vegetative cover counts as permanent stabilization in PA?
Section 102.22(a)(2) says a minimum uniform perennial vegetative cover of 70%, dense enough to resist accelerated erosion and sedimentation, or an acceptable BMP that permanently minimizes erosion and sedimentation.
When must a paused site be temporarily stabilized?
Under 102.22(b)(1), if disturbance stops temporarily and the pause will last more than 4 days, the site must be immediately seeded, mulched or otherwise protected.
Can erosion controls be removed before the site is stabilized?
No. Section 102.22(a)(1) says E&S controls stay in place and are maintained until permanent stabilization is complete.
Is the federal trigger the same as the PA trigger?
No. The federal rule at 40 CFR 450.21(b) uses a pause of more than 14 calendar days. The Pennsylvania section uses more than 4 days.