Surface Roughening: Grooving and Stair-Step Grading on Slopes
Surface roughening is the practice of leaving a slope with a rough soil surface and horizontal depressions, instead of a smooth, hard-packed face. Pennsylvania’s erosion and sediment control manual lists it as a way to slow runoff, help water soak in, help vegetation take hold and reduce erosion on slopes steeper than 3 horizontal to 1 vertical.
Surface roughening and the terms around it
- Surface roughening: according to the PA DEP manual, creating a rough soil surface with horizontal depressions to reduce runoff velocity, increase infiltration, aid vegetation establishment and reduce erosion.
- Stair-step grading: cutting a slope in small horizontal steps, one of the roughening methods in the manual.
- Grooving: using machinery to make depressions parallel to the contour. The manual lists it as a separate practice on the following page.
- Slope ratio (3:1): three feet horizontal for every one foot of vertical rise. See contour line for how slopes show on a plan.
- Topsoil stripping: removing and stockpiling topsoil before grading. See topsoil stripping.
Why it matters on a job
A freshly graded slope is exposed soil. According to the PA DEP manual, roughening provides a rough soil surface with horizontal depressions, and its stated purposes are to reduce runoff velocity, increase infiltration, aid vegetation establishment and reduce erosion. Those are the reasons a plan may call for a rough finish instead of a smooth one. Slope stabilization and erosion control are planned together in the erosion and sediment control plan, and that plan controls on any permitted job.
For a homeowner, the term may show up as a line item or a note on a grading plan. It helps to know that the rough finish is intentional. A slope that looks messy right after grading may be exactly what the plan calls for.
What the DEP manual specifies
Pages 70 and 71 of the PA DEP Erosion and Sediment Pollution Control Program Manual (document 363-2134-008, effective April 15, 2000 in the copy cited below) cover the practice. According to the manual:
- Where to apply it: on slopes steeper than 3:1, unless a stable rock face is provided.
- Stair-step grading: the horizontal cut should exceed the vertical cut by at least 10 inches. Individual vertical cuts should not exceed 30 inches in soft materials or 40 inches in harder rock.
- Benches: recommended at 30-foot vertical intervals on slopes of 3:1 or steeper that are more than 40 feet high.
- Grooving method: machinery makes depressions parallel to the contour. Discs, tillers or harrows work in softer materials on slopes gentler than 3:1, and front-end loader teeth may be used in harder materials.
- Groove dimensions: at least 3 inches deep and no more than 15 inches apart.
- Fill slopes: grooving may be used on fill slopes gentler than 3:1.
Verify these figures against the current manual and the approved plan before using them. This page does not cover the manual’s full design commentary on when roughening is chosen over other stabilization.
Roughening versus other terms that sound alike
In the manual, surface roughening is the umbrella practice, and grooving is described as one way to do it. A separate entry on page 70 recommends benches on high, steep slopes as a site preparation feature. A bench is a flat step in the slope, while a groove is a shallow depression cut along it. Roughening is also different from a silt fence, which is a separate practice in the same manual. On a wall job, such as a segmental retaining wall, the grading plan and the wall design are separate documents, and the manual’s roughening practice is written for graded soil slopes.
Surface roughening FAQ
What is surface roughening for?
The PA DEP manual says it reduces runoff velocity, increases infiltration, aids vegetation establishment and reduces erosion.
How deep and how far apart are the grooves?
At least 3 inches deep and no more than 15 inches apart, according to the manual, with the depressions running parallel to the contour.
What slopes does roughening apply to?
Slopes steeper than 3:1 unless a stable rock face is provided. Grooving with discs, tillers or harrows is described for slopes gentler than 3:1 in softer materials.
How big can the steps be in stair-step grading?
The manual says individual vertical cuts should not exceed 30 inches in soft materials or 40 inches in harder rock, and the horizontal cut should exceed the vertical cut by at least 10 inches.
Sources
Descriptions here are summaries of the manual. Verify against the current source, which governs.
Keep reading
- Hardscape and Site Work Glossary
- Related terms: topsoil stripping, contour line, silt fence and erosion and sediment control plan
Planning grading or slope work in central PA? Contact Muthler Landscaping & Construction for a straight answer. Planning information, not engineering advice.