Minimize total disturbed area: how the PA BMP Manual describes it
Quick answer: BMP 5.6.1 in the Pennsylvania Stormwater Best Management Practices Manual says the cheapest stormwater control is not to disturb the ground in the first place. It asks designers to fit roads, lots and buildings to the existing slope, mark a limit of disturbance on the plans and in the field, and restore any soil that construction traffic or stockpiles compact.
What it is
BMP 5.6.1, “Minimize Total Disturbed Area – Grading,” is a non-structural practice in Chapter 5. The idea is to reduce grading, vegetation clearing and soil disturbance without changing the building program, by adjusting roads, lots, building locations and elevations to the existing topography. The manual criticizes plans drawn in two dimensions from zoned density that ignore slope. Roads that do not follow the contours create extensive earthwork and vegetation loss, and rigid lot rules for frontage, setbacks and driveways push buildings to the middle of lots, which forces terracing and clearing. The manual calls the result a “cookie cutter” pattern.
Ratings in the manual
The manual credits 40% for total suspended solids and 0% for phosphorus and nitrate. Volume reduction, recharge, peak rate control and water quality are all rated high. Residential, commercial and industrial uses are marked as applicable, while ultra-urban, retrofit and highway uses are marked limited.
Key design elements
- Identify and avoid special-value and environmentally sensitive areas.
- Minimize overall site disturbance and disturbance on each individual lot.
- Maximize soil restoration to recover permeability.
- Limit the locations of construction traffic and of stockpiling and storage areas.
What municipalities can change
The manual says municipalities should consider flexibility in four areas, without compromising public safety: the maximum grade of road vertical alignment, the maximum curvature of road horizontal alignment, lot frontage and building setbacks. These criteria usually sit in the municipal subdivision and land development ordinance and the zoning ordinance. The manual notes that related practices, including road width, parking ratios, impervious cover reduction and chemical landscape maintenance, are interrelated with this one.
The minimum disturbance plan
The manual describes a minimum disturbance and minimum maintenance plan prepared at the concept stage. Its steps are:
- Avoid sensitive areas: delineate primary and secondary conservation areas under BMP 5.4.1, including woodlands, and place development on the remaining land.
- Limit site disturbance: adjust alignments, lots and buildings to reduce grading while meeting safety standards, show limits of disturbance on submitted plans, and mark them in the field with flagging or fencing.
- Limit lot disturbance: confine grading to roadways and building footprints. The manual cites LEED limits of 40 feet beyond the building perimeter, 5 feet beyond primary roadway curbs, walkways and main utility trenches, and 25 feet beyond pervious paving that needs staging. It also says New Jersey Pinelands municipalities reduce clearing around single-family homes to 25 feet.
- Restore soil: if bulk density is not reduced after fill, treat those areas as semi-impervious when calculating runoff.
- Control construction traffic: delineate and limit the areas, then restore them as pervious after development.
- Control stockpiling: delineate storage areas and restore them. For low-density projects, topsoil stripping may be unnecessary and should be minimized or avoided.
Soil protection is covered in more detail in our guide to minimizing soil compaction, and the glossary explains topsoil stripping.
How it helps stormwater
For volume, the manual says undisturbed vegetation increases infiltration and evapotranspiration, and that unavoidable runoff can be managed with non-erosive sheet flow onto vegetated areas using level spreaders (see level spreader). For peak rate it names lower runoff coefficients, higher infiltration, longer travel times and more on-site storage. For water quality it lists less construction sediment, less need for fertilizer and pesticide, added filtration and infiltration, and thermal mitigation.
Construction and maintenance
The manual says most of the measures belong in the concept site plan, and only soil restoration applies during and after construction. Maintenance is not separately addressed, although lower disturbance implies less re-establishment of maintained landscape. Erosion control during construction is a separate topic; see the glossary entry on the erosion and sediment control plan.
Costs (2002 figures, old)
The manual cites R.S. Means site work data from 2002. Examples include $2,900 per acre to cut and chip light trees up to 6 inches in diameter and $1,400 per acre to grub stumps, rising to $9,700 and $5,600 per acre for trees up to 24 inches. Stripping and stockpiling topsoil is listed at $0.52 to $1.78 per cubic yard, and fine grading with seeding at $2.33 per square yard. The manual estimates roughly $20,000 per acre in total and possibly more on difficult sites. These are old numbers and not current prices. The manual’s point is that the developer avoids these costs, so the practice is described as self-crediting.
Where the manual contradicts itself
- Calculations: the stormwater section says no calculations are applicable, yet the functions section refers to Chapter 8 volume methods and says the effects are self-credited through lower runoff coefficients or higher infiltration.
- Water quality: water quality is rated high and the text calls avoiding chemical applications potentially the most effective technique, but the credits for phosphorus and nitrate are 0%.
- Building program: the practice is described as working without changing the building program, but the design steps call for moving lots and buildings.
Pennsylvania approvals and who designs it
The limit of disturbance, grading plan and any runoff credit belong to a qualified professional such as a licensed engineer, and your municipality, the county conservation district or DEP may review them. Check whether an erosion and sediment plan or NPDES permit applies (see Chapter 102, PA stormwater plan rules and PCSM).
Sources
- Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 5.6.1 Minimize Total Disturbed Area – Grading, via the PA DEP eLibrary. Checked Nov 23, 2026.
Related
All drainage guides · Minimize soil compaction · Rooftop disconnection · Hillside erosion
FAQ
How far beyond a building should clearing extend?
The manual cites LEED limits of 40 feet beyond the building perimeter and 5 feet beyond roadway curbs, walkways and main utility trenches, and says some New Jersey Pinelands municipalities limit clearing around single-family homes to 25 feet.
What should happen to construction traffic areas?
They should be delineated and limited, then restored as pervious after development.
Is topsoil stripping always needed?
No. For low-density projects the manual says it may be unnecessary and should be minimized or avoided.
Does this practice need calculations?
The manual says none are applicable, yet it also refers to Chapter 8 methods for self-credited volume and peak rate benefits.