Erosion and Sediment Control Plan
An erosion and sediment control plan, or E&S plan, is a site-specific plan of drawings and a narrative that shows how you will limit erosion and sediment before, during and after earth disturbance.
What it means
Pennsylvania’s Chapter 102 defines an E&S plan as a site-specific plan with both drawings and a narrative that identifies best management practices (BMPs) to minimize accelerated erosion and sedimentation. Under 25 Pa. Code 102.4, a written plan is required when the earth disturbance is about 5,000 square feet or more, when another rule requires one, or when the site could discharge to a High Quality or Exceptional Value water. A person trained and experienced in E&S control methods prepares it.
What it must include
The plan must show where the perimeter and on-site BMPs go, give the sequence for installing and removing them, and set a maintenance program with inspections weekly and after each stormwater event. Each inspection is documented in a written report. The plan and reports are kept on site for review by DEP or the conservation district. It is separate from the post-construction stormwater plan (PCSM).
In the field
Projects at one acre or more of disturbance submit the plan with the permit application, and local ordinances may require submission for smaller ones, according to DEP’s E&S FAQ. Check your county conservation district and our PA stormwater plan rules page for local steps.
What the plan has to cover on the ground
Beyond the BMP layout, 25 Pa. Code 102.4(b)(5) lists what a plan must address: site topography, soils and past, present and proposed land uses; runoff volume and rate; the receiving surface waters and their classifications; calculations and drawings; and procedures for recycling or disposing of project materials. It must identify geologic formations or soil conditions that could cause pollution, and potential thermal impacts to surface waters, with BMPs for each. Unless the department approves otherwise, the E&S plan is a separate document labeled as such, and it is the final construction plan. DEP’s FAQ adds that the plan should account for drainage patterns, seeps and springs, slope steepness and stability, sinkholes, wetlands and streams.
Stabilization and numbers from DEP
DEP’s FAQ says temporary stabilization is required if earth disturbance stops for more than 4 days. Permanent stabilization requires a uniform 70 percent perennial vegetative cover or an acceptable permanent BMP, judged by looking down at the ground, and temporary BMPs such as silt fence are removed afterward. Perimeter controls sit 8 feet from the toe of slope. The FAQ also says E&S practices are required for any earth disturbance regardless of size, and that a written plan must be available on site. Plans are reviewed by county conservation districts, which may charge a fee, and DEP says structurally engineered BMPs should be designed by a licensed professional such as a professional engineer, landscape architect, geologist or land surveyor.
A plan for a single-family lot
DEP’s fact sheet for single-family lot work says that for a single-family residence a landowner or operator sketch is generally adequate. The sketch shows lot dimensions, the disturbed area, prominent drainage, wetlands and surface waters, major trees, the general lot slope and the BMPs to be used. The fact sheet counts clearing, grading, excavations, embankments and stockpiling of soil or rock as earth disturbance, and notes that many municipalities require a written plan below 5,000 square feet.
Common mistakes
Measuring only the footprint of the finished patio when stockpiles and access paths count as disturbance, leaving the plan off site, skipping the weekly and post-storm inspection reports, and removing controls before the ground is stabilized. Related entries: rock construction entrance and topsoil stripping. This page is planning information only. Confirm your project’s requirements with your county conservation district.
Frequently asked questions
When is a written E&S plan required in Pennsylvania?
At about 5,000 square feet or more of earth disturbance, or sooner where the site could discharge to an HQ or EV water (25 Pa. Code 102.4).
Do I need a plan under 5,000 square feet?
A written plan may not be required, but DEP’s fact sheet for single-family lots says E&S control practices are still required, and your township may have its own rules.
Who writes the plan?
Someone trained and experienced in E&S control methods suited to the project’s size and scope.