Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE
Deck Contract
Contract #[000] · Date: [Date]

1. Parties and property

This contract is between [Company] (“Contractor”) and [Owner name(s)] (“Owner”) for work at [Property address] (“the Property”). Owner’s phone and email: [ ].

2. Scope of work

Contractor will furnish the labor, equipment and materials to build the following at the Property, as shown on the attached plan [sheet #]:

  • [e.g. 12 x 16 ft attached deck, 192 sq ft, walking surface about 30 in. above grade]
  • [e.g. Stairs, 5 risers, 4 ft wide, with landing]
  • [e.g. Guards on all open sides and handrails on stairs]
  • [e.g. Demolition and disposal of the existing deck, about __ sq ft]
  • Removal of construction debris at completion.

Give the dimensions, the height above grade and whether the deck is attached or freestanding. Those three facts drive footings, permit, guards and stairs. The deck span calculator and footing calculator help with the takeoff.

3. Structure and code specifications

ItemSpecification
Type[Attached to house / freestanding]
Footings[__ in.] diameter, [__ in.] deep, below the local frost depth of [__ in., confirmed with the building department], on undisturbed soil; count [__]
Posts and beams[size, species/grade, treatment]
Joists[size, species/grade, spacing, span]
Ledger (attached decks)[size] pressure-treated ledger fastened to the house band joist with [fastener type and spacing], with metal flashing; not attached to stone or masonry veneer; lateral load connections [per plan]
Decking[product, color, fasteners]
Guards and handrails[height, post size and attachment, infill]
Stairs[number of risers, riser height, tread depth, width, landing]
Ground cover under deck[none / fabric and stone]

The deck will be built to the code adopted and enforced by the municipality where the Property is located, as shown on the approved plan. Where this contract and the code differ, the code controls.

Pennsylvania adopted the 2021 International Residential Code, with state changes, effective January 1, 2026; municipalities enforce it themselves or through a third-party agency, and some have opted out. Under that code, deck footings must extend below the frost line set for your location (R507.3.2), and frost depth is set locally, so get the number from your building department. A ledger must be at least a 2×8, pressure-treated or naturally durable lumber, cannot be supported on stone or masonry veneer, and cannot carry concentrated beam or girder loads (R507.9.1.1). Guards are required where the deck surface is more than 30 in. above grade (R312.1.1) and must be at least 36 in. high (R312.1.2). Pennsylvania’s own stair rule allows risers up to 8 1/4 in. and treads at least 9 in. deep (34 Pa. Code § 403.21). Confirm all of these with your building department before you price. See Pennsylvania building codes, permits and contractor rules and Pennsylvania frost line depth.

4. Materials

ItemProduct / gradeQuantity
Framing lumber[species, grade, treatment][pieces / LF]
Decking[Brand, style, color][sq ft]
Railing[Brand, system, color][LF]
Concrete and footing forms[ ][cu yd / count]
Hardware, connectors, flashing[ ][ ]

If a listed product is discontinued or unavailable, Contractor may substitute a product of equal or better quality only with Owner’s written approval. Natural variation in wood and manufacturer-stated color variation in decking are not defects.

5. Permits and inspections

[Contractor / Owner] will apply for the building permit, and the permit fee is [included / paid by Owner at cost]. Contractor will schedule the inspections the municipality requires, such as footings and framing, and will not close in or cover work that must be inspected first. Contractor will request utility marking from the one-call center before digging. Owner will provide [deed, survey or property line markers, HOA approval] where needed for the permit.

Whether a deck needs a permit, and who issues it, depends on the municipality. Use the Pennsylvania building permit lookup to find who enforces the code in your township. Pennsylvania requires notice to the one-call center before excavation with powered equipment, generally not less than 3 nor more than 10 business days ahead for construction work (PA 811 guide).

6. Price and payment

Total contract price: [$00,000]. No payment is due or accepted before this contract is signed by both parties.

PaymentWhenAmount
Down paymentAt signing[$]
Special-order materials (listed separately)At signing; items: [list each item and its cost, e.g. custom railing ordered for this job][$ or “none”]
Progress[e.g. footings passed inspection][$]
Progress[e.g. framing passed inspection][$]
FinalAt substantial completion and final inspection[$]

Pennsylvania: on a home improvement contract over $5,000, the deposit cannot exceed one-third of the price, plus the cost of special-order materials designated in the written contract (73 P.S. § 517.9(10)(i)). The down payment and any special-order amount must be stated separately (§ 517.7(a)(9)). See Pennsylvania deposit limits and deposit limits by state.

7. Schedule

Approximate start: [date or week]. Approximate completion: [date]. Weather, ground conditions, permit and inspection timing, and material delivery can move these dates; Contractor will tell Owner promptly when they do.

8. Exclusions

These are not included unless written in section 2:

  • Repair of the existing house structure, rot or damage found behind siding or at the band joist when the ledger is exposed, and any structural engineering of the house.
  • Rock, ledge, buried debris, unsuitable soil or unmarked private lines (sprinkler, lighting, drain, gas, electric).
  • Loads the plan does not show, such as a hot tub, planter boxes, a roof or a pergola. See the hot tub weight calculator and price those separately.
  • Electrical, lighting, gas or plumbing work, and relocation of house vents, meters or dryer exhausts.
  • Staining, sealing or painting, unless listed.
  • Lawn and landscape repair beyond [topsoil and seed at disturbed areas].
  • Permit, survey, engineering and HOA fees, unless listed in section 5.

9. Changes

Any change to the size, height, layout, materials or plan will be written up as a change order showing the price and schedule effect. It takes effect only when dated and signed by Owner and Contractor, and before the changed work is done. Changes the inspector requires are priced the same way unless the plan already should have shown them.

10. Warranty

Contractor warrants its workmanship and structural framing for [X years] from completion. Manufacturers’ warranties on decking, railing and fasteners apply directly. The warranty does not cover wear, weathering, fading, checking, cracking or splitting normal for the material, damage from misuse or overloading, settlement caused by others’ work, or failure to maintain the surface as the manufacturer directs. Owner must give Contractor written notice and a chance to inspect before others repair a defect.

11. Insurance and subcontractors

Contractor agrees to maintain general liability insurance of at least [$50,000 personal injury and $50,000 property damage, or your current limits]. Current coverage amount: [$ ]. Subcontractors known at signing: [name, address, phone, or “none”].

12. Owner’s right to cancel

[Insert your state’s required notice. Pennsylvania example only (the Act requires a notice of the right to rescind but does not prescribe its wording): “You, the Owner, may cancel this contract without penalty at any time within three business days of the date you signed it. To cancel, notify the Contractor at the address or phone above.” Have your attorney approve the final wording.]

Pennsylvania Attorney General Home Improvement Registration Hotline, toll-free: 1-888-520-6680.

13. Disputes

The parties will first try to resolve any dispute in good faith, by written notice and a meeting at the Property. Any lawsuit will be filed in the county where the Property is located. Nothing in this contract waives either party’s rights under the law of the state where the Property is located.

14. Signatures

This is the entire agreement, with the attached plan [sheet #] and the cancellation notice. Owner received a completed copy at signing.

Owner signature · Date
Contractor signature · Date
Printed name
Printed name and title

How to use this deck contract template

This is a fill-in contract for new decks, deck replacements and deck additions. For patios, walls and walkways use the hardscape contract template, and for planting and lawn work the landscaping contract template. For a shorter bid with a plan attached, see the landscape and hardscape proposal template. All of them are listed on our free contractor templates page.

Nail down footings and the ledger before you price

Footing depth and the ledger connection are where deck jobs get expensive and where inspectors look first. Section 3 makes you state the frost depth you confirmed and how the ledger is attached. Our guides on how deep footings should be and freestanding deck plans cover the sizing, and what to put under a deck covers the ground cover line.

Small freestanding decks are different

The 2021 IRC lets a small freestanding deck skip footings if it is 200 sq ft or less, its joists sit directly on precast pier blocks at grade, and its walking surface is no more than 20 in. above grade (R507.3). Do not assume your municipality allows it without asking.

Write inspections and permits into the schedule and payments

Tie progress payments to passed inspections, not to calendar dates. It keeps the job honest for both sides, and the owner can see why each payment is due. If you are weighing deck against patio for a customer, patio vs. deck compares cost, lifespan and permits.

Pennsylvania checklist: does your contract meet HICPA § 517.7?

In Pennsylvania this template is a home improvement contract once the homeowner signs it. Under the Home Improvement Consumer Protection Act (73 P.S. § 517.7(a)), a contract is not valid or enforceable against the owner unless it meets 13 requirements. The act covers home improvement work where the total cash price of all work agreed upon is more than $500 (§ 517.2). This template covers them as follows:

  • Written, legible, with your registration number: header (HIC Reg. #).
  • Signed by owner and contractor, with the entire agreement and required notices attached: section 14.
  • Date, and your name, street address and phone (a P.O. box alone is not an address): header.
  • Approximate start and completion dates: section 7.
  • Work, materials and specifications; changes only by signed written change order: sections 2, 3, 4 and 9.
  • Total price, or a time-and-materials provision with a written estimate and a 10% cap: section 6. This template uses a fixed price.
  • Down payment and special-order advance listed separately: section 6.
  • Known subcontractors, and the insurance agreement ($50,000 personal injury and $50,000 property damage minimum, with the current amount): section 11.
  • Attorney General’s toll-free number and notice of the right to cancel: section 12.

Rules that sit next to the checklist

  • Three business days to cancel. The owner may rescind without penalty within three business days of signing (§ 517.7(b)), apart from the emergency exception in the law.
  • Give a completed copy at signing with the required notices (§ 517.7(c)).
  • No payment before signing (§ 517.9(9)).
  • Clauses to leave out. An owner can void a contract that contains a hold-harmless clause, a waiver of code requirements, a confession of judgment, a jury-trial waiver, a contractor attorney-fee award, a waiver of HICPA rights or an automatic renewal without the required notice (§ 517.7(e)). An arbitration clause must be in capital letters, in 12-point boldface, on a separate page with a signature line for each party (§ 517.7(d)). This template uses none of these.
  • Refund on a stalled job. If no substantial portion of the work has been performed and more than 45 days have passed since the contract’s starting date, the contractor must refund within 10 days of a certified-mail request (§ 517.9(2)).
  • Mechanics liens. A subcontractor has no lien right on a single townhouse or a one- or two-unit building that is or will be the owner’s residence once the owner has paid the contractor the full contract price (49 P.S. § 1301(b)). Get written lien waivers as you are paid. See Pennsylvania mechanics lien deadlines.

The text of HICPA has been the subject of bills in the 2025-26 session, so confirm current requirements with the Attorney General’s office or a Pennsylvania attorney before you finalize your form.

Not in Pennsylvania?

Home improvement contract rules, deposit limits, cancellation periods, lien deadlines, frost depths and deck codes vary by state and by town. Start with our state guides, including mechanics lien deadlines by state and deposit limits by state, then have an attorney in your state review your final form.

This template is a starting point, not legal advice. Have an attorney in your state review it once before you use it. If you want the plan drawn too, we draw plans for contractors under your logo.

Sources: Home Improvement Consumer Protection Act, Act 132 of 2008, 73 P.S. §§ 517.2, 517.7, 517.9 (text of Act 132 at attorneygeneral.gov); Mechanics’ Lien Law of 1963, 49 P.S. § 1301(b) (findlaw.com); 2021 International Residential Code R312.1.1, R312.1.2, R507.3, R507.3.2, R507.9.1.1 (confirm against the edition your municipality enforces; see also Penn State Housing Research Center deck design materials, phrc.psu.edu); 34 Pa. Code § 403.21 (law.cornell.edu); Pennsylvania Construction Code Act, 35 P.S. § 7210.101 et seq. (pa.gov Department of Labor and Industry, Uniform Construction Code); Pennsylvania One Call, Act 287 (pa1call.org; 811beforeyoudig.com).

Questions

Can I use this deck contract template for my business?

Yes, free for any contractor. Edit it however you like. It is a starting point, not legal advice, so have an attorney in your state review your final version once.

How much deposit can a deck builder take in Pennsylvania?

On a home improvement contract over $5,000, no more than one-third of the price, plus the cost of special-order materials designated in the written contract. No payment may be taken before the contract is signed.

How deep do deck footings have to be in Pennsylvania?

Under the 2021 IRC, deck footings must extend below the frost line set for your location, with an exception for small freestanding decks. Frost depth is set by each municipality, so ask your building department for the number.

Can a deck ledger be attached to brick veneer?

No. The 2021 IRC says a deck ledger cannot be supported on stone or masonry veneer. It also must be at least a 2×8 pressure-treated or naturally durable board and cannot carry beam loads.

How long does a Pennsylvania homeowner have to cancel a deck contract?

Three business days from signing, without penalty, under 73 P.S. § 517.7(b), apart from an emergency exception. The contract must include a notice of that right.

Template by Groundwork Design Co., the design studio of Muthler Landscaping & Construction LLC, Lock Haven, PA. Not legal advice.