Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE
Hardscape Contract
Contract #[000] · Date: [Date]

1. Parties and property

This contract is between [Company] (“Contractor”) and [Owner name(s)] (“Owner”) for work at [Property address] (“the Property”). Owner’s phone and email: [ ].

2. Scope of work

Contractor will furnish the labor, equipment and materials to build the following at the Property:

  • [e.g. 16 x 20 ft paver patio, 320 sq ft, with 6×9 soldier course border]
  • [e.g. 32 LF segmental block wall, 3 ft exposed height, with cap]
  • [e.g. 4 in. perforated drain behind wall, outlet to daylight at the north corner]
  • Removal and disposal of excavated material and construction debris, unless Owner keeps it on site as noted: [ ].

Write scope in quantities and dimensions. “320 sq ft, compacted base” settles arguments that “a nice patio” starts. Use the paver calculator and wall block calculator for the takeoff.

3. Base, drainage and wall specifications

ItemSpecification
Excavation depth[__ in. below finished grade]; soft or organic soil removed and replaced with compacted stone
Fabric[geotextile type, or “none”]
Base stone[stone type], compacted to [__ in.] in lifts of [__ in.] maximum
Bedding layer[material], [__ in.] screeded, not compacted
Surface drainageFinished surface pitched [__%] away from structures, toward [location]
Edge restraint[type]
Joint material[polymeric sand / other]; sealer [included / not included]
Wall height and layoutMaximum exposed height [__ in.]; total length [__ LF]; see attached plan [sheet #]
Wall base and reinforcementLeveling pad [__ in. x __ in.]; geogrid [none / __ layers, __ ft long]; backfill [__ ft of drainage stone]
Wall drainage[pipe size, outlet location]
Material toleranceProduct colors and textures vary by lot; finished work will meet the manufacturer’s published installation guide and tolerances for [product]

Engineering and permits. Owner and Contractor agree that [Contractor / Owner] will obtain permits and [Contractor / Owner] will pay for any engineered wall design. Walls above [__ in.] in height, or walls that carry a driveway, slope or building, will be built only to a stamped engineer’s design. Fees: [included / not included].

Pennsylvania: PA’s UCC regulations (34 Pa. Code § 403.62(c)(2)) exempt a retaining wall that is not over 4 ft in height, measured from the lowest level of grade to the top of the wall, unless it supports an added load. The model International Residential Code (R404.4) sets an engineering trigger for walls that retain more than 48 in. of unbalanced fill, with lower limits when a wall carries added loads, so confirm the exact thresholds in the code your municipality enforces. Your municipality can be stricter. See Pennsylvania retaining wall permits.

4. Materials

ItemProduct / colorQuantity
Pavers or surface material[Brand, style, color][sq ft]
Wall block and cap[Brand, unit, color][face sq ft / LF]
Base and drainage stone[type][tons]
Bedding and joint sand[type][ ]
Pipe, fabric, geogrid, edge restraint[ ][ ]

If a listed product is discontinued or unavailable, Contractor may substitute a product of equal or better quality only with Owner’s written approval.

5. Price and payment

Total contract price: [$00,000]. No payment is due or accepted before this contract is signed by both parties.

PaymentWhenAmount
Down paymentAt signing[$]
Special-order materials (listed separately)At signing; items: [list each item and its cost][$ or “none”]
Progress[e.g. base and drainage complete][$]
FinalAt substantial completion[$]

Pennsylvania: on a home improvement contract over $5,000, the deposit cannot exceed one-third of the price, plus the cost of special-order materials designated in the written contract (73 P.S. § 517.9(10)(i)). Down payment and special-order amounts must be stated separately (§ 517.7(a)(9)). See Pennsylvania deposit limits, and deposit limits by state for other states.

6. Schedule

Approximate start: [date or week]. Approximate completion: [date], about [X] working days on site. Weather, ground conditions, material delivery, inspections and utility locates can move these dates; Contractor will tell Owner promptly when they do.

7. Site conditions and exclusions

Contractor will request utility marking from the one-call center before digging. The following are not included unless written in section 2:

  • Permit, survey and engineering fees, and HOA approvals, unless listed in section 3.
  • Rock, ledge, boulders, buried debris or unsuitable soil needing removal beyond normal excavation, and unmarked private lines (sprinkler, lighting, drain, gas, electric).
  • Repair of existing walls, patios, steps or drainage not in the scope.
  • Lawn restoration beyond [topsoil and seed along new edges].
  • Damage to driveways, curbs or lawn from deliveries along the access route Owner approves.
  • Sealing, snow-melt systems, lighting, irrigation, electrical, gas or plumbing, unless listed.

8. Changes

Any change to the scope, plan or materials will be written up as a change order showing the price and schedule effect. It takes effect only when dated and signed by Owner and Contractor, and before the changed work is done.

9. Warranty

Contractor warrants its workmanship for [X years] from completion. Manufacturers’ warranties on materials apply directly. The warranty does not cover damage from misuse, de-icing products the manufacturer does not approve, vehicle loads the design did not include, changes to grade or drainage by others, or settlement caused by others’ work. Owner must give Contractor written notice and a chance to inspect before others repair a defect.

10. Insurance and subcontractors

Contractor agrees to maintain general liability insurance of at least [$50,000 personal injury and $50,000 property damage, or your current limits]. Current coverage amount: [$ ]. Subcontractors known at signing: [name, address, phone, or “none”].

11. Owner’s right to cancel

[Insert your state’s required notice. Pennsylvania example only (the Act requires a notice of the right to rescind but does not prescribe its wording): “You, the Owner, may cancel this contract without penalty at any time within three business days of the date you signed it. To cancel, notify the Contractor at the address or phone above.” Have your attorney approve the final wording.]

Pennsylvania Attorney General Home Improvement Registration Hotline, toll-free: 1-888-520-6680.

12. Disputes

The parties will first try to resolve any dispute in good faith, by written notice and a meeting at the Property. Any lawsuit will be filed in the county where the Property is located. Nothing in this contract waives either party’s rights under the law of the state where the Property is located.

13. Signatures

This is the entire agreement, with the attached plan [sheet #] and the cancellation notice. Owner received a completed copy at signing.

Owner signature · Date
Contractor signature · Date
Printed name
Printed name and title

How to use this hardscape contract template

This is a fill-in contract for patios, walkways, retaining walls and drainage work. Each orange field is a decision to make before you sign, not a blank to skim past. If you only need a shorter bid document, use our landscape and hardscape proposal template; for planting and lawn jobs see the landscaping contract template, and for wood or composite decks the deck contract template. All of our free contractor templates are in one place.

Put the base and drainage in writing

Most callbacks on hardscape are base and water problems, not surface problems. Section 3 makes you state excavation depth, compacted base depth, pitch and wall drainage, so the Owner and your crew are reading the same numbers. Our guide on how to estimate a paver patio shows how the takeoff feeds these lines, and the gravel compaction calculator and French drain calculator help with stone and pipe quantities.

Decide wall height and engineering before pricing

Wall height drives permits, engineering and geogrid. Put the maximum exposed height and who pays for engineering in the contract so a “bit taller” request becomes a change order, not a favor. For how contractors scope this work, see what a hardscape contractor does and how jobs are priced, and for what homeowners ask when hiring, how to hire a pavers contractor.

Dig safely

Pennsylvania requires notice to the one-call center before excavation with powered equipment, generally not less than 3 nor more than 10 business days ahead for construction work. See the Pennsylvania 811 guide.

Pennsylvania checklist: does your contract meet HICPA § 517.7?

In Pennsylvania this template is a home improvement contract once the homeowner signs it. Under the Home Improvement Consumer Protection Act (73 P.S. § 517.7(a)), a contract is not valid or enforceable against the owner unless it meets 13 requirements. The act covers home improvement work where the total cash price of all work agreed upon is more than $500 (§ 517.2). This template covers them as follows:

  • Written, legible, with your registration number: header (HIC Reg. #).
  • Signed by owner and contractor, with the entire agreement and required notices attached: section 13.
  • Date, and your name, street address and phone (a P.O. box alone is not an address): header.
  • Approximate start and completion dates: section 6.
  • Work, materials and specifications; changes only by signed written change order: sections 2, 3, 4 and 8.
  • Total price, or a time-and-materials provision with a written estimate and a 10% cap: section 5. This template uses a fixed price.
  • Down payment and special-order advance listed separately: section 5.
  • Known subcontractors, and the insurance agreement ($50,000 personal injury and $50,000 property damage minimum, with the current amount): section 10.
  • Attorney General’s toll-free number and notice of the right to cancel: section 11.

Rules that sit next to the checklist

  • Three business days to cancel. The owner may rescind without penalty within three business days of signing (§ 517.7(b)), apart from the emergency exception in the law.
  • Give a completed copy at signing with the required notices (§ 517.7(c)).
  • No payment before signing (§ 517.9(9)).
  • Clauses to leave out. An owner can void a contract that contains a hold-harmless clause, a waiver of code requirements, a confession of judgment, a jury-trial waiver, a contractor attorney-fee award, a waiver of HICPA rights or an automatic renewal without the required notice (§ 517.7(e)). An arbitration clause must be in capital letters, in 12-point boldface, on a separate page with a signature line for each party (§ 517.7(d)). This template uses none of these.
  • Refund on a stalled job. If no substantial portion of the work has been performed and more than 45 days have passed since the contract’s starting date, the contractor must refund within 10 days of a certified-mail request (§ 517.9(2)).
  • Mechanics liens. A subcontractor has no lien right on a single townhouse or a one- or two-unit building that is or will be the owner’s residence once the owner has paid the contractor the full contract price (49 P.S. § 1301(b)). Get written lien waivers as you are paid. See Pennsylvania mechanics lien deadlines.

The text of HICPA has been the subject of bills in the 2025-26 session, so confirm current requirements with the Attorney General’s office or a Pennsylvania attorney before you finalize your form.

Not in Pennsylvania?

Home improvement contract rules, deposit limits, cancellation periods and lien deadlines vary widely by state. Start with our state guides, including mechanics lien deadlines by state and deposit limits by state, then have an attorney in your state review your final form.

This template is a starting point, not legal advice. Have an attorney in your state review it once before you use it. If you want the plan drawn too, we draw plans for contractors under your logo.

Sources: Home Improvement Consumer Protection Act, Act 132 of 2008, 73 P.S. §§ 517.2, 517.7, 517.9 (text of Act 132 at attorneygeneral.gov); Mechanics’ Lien Law of 1963, 49 P.S. § 1301(b) (findlaw.com); 34 Pa. Code § 403.62(c)(2) (law.cornell.edu); International Residential Code R404.4 (confirm against the edition your municipality enforces); Pennsylvania One Call, Act 287 (pa1call.org; 811beforeyoudig.com).

Questions

Can I use this hardscape contract template for my business?

Yes, free for any contractor. Edit it however you like. It is a starting point, not legal advice, so have an attorney in your state review your final version once.

How much deposit can I take on a hardscape job in Pennsylvania?

On a home improvement contract over $5,000, no more than one-third of the price, plus the cost of special-order materials designated in the written contract. No payment may be taken before the contract is signed.

How long does a Pennsylvania homeowner have to cancel?

Three business days from signing, without penalty, under 73 P.S. § 517.7(b), apart from an emergency exception. The contract must include a notice of that right.

Do I need an engineer for a retaining wall?

Often, when the wall is tall or carries a load. Pennsylvania’s UCC rules exempt a retaining wall not over 4 ft in height unless it supports an added load, and the model IRC sets an engineering trigger at 48 in. of unbalanced fill. Your municipality can be stricter, so ask your code official.

Can a subcontractor lien my customer’s house?

In Pennsylvania, not on a single townhouse or a one- or two-unit building that is or will be the owner’s residence once the owner has paid the contractor the full contract price. Other states differ; see our state guides.

Template by Groundwork Design Co., the design studio of Muthler Landscaping & Construction LLC, Lock Haven, PA. Not legal advice.