Landscaping Contract
Contract #[000] · Date: [Date]

1. Parties and property

This contract is between [Company] (“Contractor”) and [Owner name(s)] (“Owner”) for work at [Property address] (“the Property”). Owner’s phone and email: [ ].

2. Scope of work

Contractor will furnish the labor, equipment and materials for the following at the Property, as shown on the attached plan [sheet # / “none”]:

  • [e.g. Remove existing sod and shrubs in front bed, about 450 sq ft]
  • [e.g. Install 450 sq ft of planting bed with 3 in. of shredded hardwood mulch over amended soil]
  • [e.g. Plant the trees, shrubs and perennials in section 3]
  • [e.g. Install 1,200 sq ft of sod / seed and straw]
  • Removal of debris and cleanup at completion.

Write scope in square feet, cubic yards, plant counts and container sizes. Use the mulch and topsoil calculator, sod calculator and grass seed calculator for the takeoff.

3. Plants and materials

ItemSpecies / productSizeQty
Tree[Common name, botanical name][e.g. 2 in. caliper, B&B][ ]
Shrub[ ][e.g. 3 gal.][ ]
Perennial / grass[ ][e.g. 1 gal.][ ]
Mulch[type][__ in. depth][cu yd]
Topsoil / compost[type][__ in. depth][cu yd]
Edging / fabric / stakes[ ][ ][ ]

If a listed plant is unavailable, Contractor may substitute a plant of similar habit, size and exposure only with Owner’s written approval (email or text counts). Plant sizes are nursery-grade sizes, not guaranteed finished heights.

The Pennsylvania Department of Agriculture’s noxious weed list has 61 entries. It includes common landscape plants such as Japanese barberry, burning bush and Callery pear (all Class B), and the Department says listed noxious weeds cannot be sold, transported, planted or otherwise propagated in the state. Only certain approved barberry varieties are exempt; no exemption is listed for burning bush or Callery pear. The list changes, so check it before you specify shrubs and trees: Pennsylvania noxious weeds.

4. Lawn, irrigation and grading

ItemSpecification
GradingRough grade to [__%] slope away from structures; no regrading of existing drainage unless listed
New lawn[sod / seed mix], [sq ft], installed [planting window]
Irrigation[Not included / zones, heads, controller, backflow device, included]
Lighting / electrical[Not included / described]
Watering during the establishment period[Owner / Contractor, for __ weeks]

Seeding season matters for your warranty. Penn State Extension says late summer is the optimum time to seed in most of Pennsylvania, with mid-to-late spring the other good window, though spring seedings have to survive their first summer. Put the planting window in the contract. See Pennsylvania grass seed guide.

5. Price and payment

Total contract price: [$00,000]. No payment is due or accepted before this contract is signed by both parties.

PaymentWhenAmount
Down paymentAt signing[$]
Special-order materials (listed separately)At signing; items: [list each item and its cost, e.g. specimen trees ordered for this job][$ or “none”]
Progress[e.g. beds prepared and plants delivered][$]
FinalAt substantial completion[$]

Pennsylvania: on a home improvement contract over $5,000, the deposit cannot exceed one-third of the price, plus the cost of special-order materials designated in the written contract (73 P.S. § 517.9(10)(i)). The down payment and any special-order amount must be stated separately (§ 517.7(a)(9)). See Pennsylvania deposit limits and deposit limits by state. Sales tax: under 61 Pa. Code § 55.6, planting trees and shrubs and seeding or sodding to establish a new lawn are not taxable lawn care, while mowing, fertilizing, aerating, applying lawn pesticides and overseeding or sodding an existing lawn are. If taxable and non-taxable lawn care charges are not stated separately on one invoice, tax can apply to the whole invoice. Confirm your situation with the Department of Revenue or your accountant. See Pennsylvania landscaping sales tax.

6. Schedule

Approximate start: [date or week]. Approximate completion: [date]. Weather, soil conditions, plant availability and utility locates can move these dates, and Contractor may hold planting until conditions suit the plants.

7. Exclusions

Contractor will request utility marking from the one-call center before digging. These are not included unless written in section 2:

  • Pesticide or herbicide application, unless listed and performed by a licensed applicator.
  • Tree removal, stump grinding, large-root removal and pruning of existing trees.
  • Rock, buried debris, unsuitable soil or unmarked private lines (sprinkler, lighting, drain, gas, electric).
  • Repair of existing irrigation, lighting or drainage, and any controller programming not listed.
  • Deer, rabbit or vole protection, and soil testing or amendment beyond section 3.
  • Ongoing mowing, watering, weeding, pruning, mulch refresh or other maintenance.
  • Permits, survey, HOA approvals and stormwater plans, unless listed.

8. Changes

Any change to the scope, plan, plants or materials will be written up as a change order showing the price and schedule effect. It takes effect only when dated and signed by Owner and Contractor, and before the changed work is done.

9. Plant warranty

Contractor will replace, one time, any tree or shrub it planted that dies within [__ months] of completion, if Owner followed the care terms in section 10. Perennials, annuals and seeded lawns are [covered for __ weeks / not warranted]. The warranty does not cover loss from drought or flooding, freezing, disease, pests, animals, fire, road salt, construction by others, vehicle or mower damage, or weather outside normal conditions. Replacements carry no further warranty. Contractor’s workmanship warranty on non-plant work runs [X years] from completion.

10. Owner care

Owner will water new plantings as follows: [e.g. deep watering twice a week for the first __ weeks, more in heat], keep mulch off trunks, and protect plants from mowers, trimmers and pets. Owner will tell Contractor in writing within [__ days] if a plant declines so Contractor can inspect it.

11. Insurance and subcontractors

Contractor agrees to maintain general liability insurance of at least [$50,000 personal injury and $50,000 property damage, or your current limits]. Current coverage amount: [$ ]. Subcontractors known at signing: [name, address, phone, or “none”].

12. Owner’s right to cancel

[Insert your state’s required notice. Pennsylvania example only (the Act requires a notice of the right to rescind but does not prescribe its wording): “You, the Owner, may cancel this contract without penalty at any time within three business days of the date you signed it. To cancel, notify the Contractor at the address or phone above.” Have your attorney approve the final wording.]

Pennsylvania Attorney General Home Improvement Registration Hotline, toll-free: 1-888-520-6680.

13. Disputes

The parties will first try to resolve any dispute in good faith, by written notice and a meeting at the Property. Any lawsuit will be filed in the county where the Property is located. Nothing in this contract waives either party’s rights under the law of the state where the Property is located.

14. Signatures

This is the entire agreement, with the attached plan [sheet #] and the cancellation notice. Owner received a completed copy at signing.

Owner signature · Date
Contractor signature · Date
Printed name
Printed name and title

How to use this landscaping contract template

This is a fill-in contract for planting beds, new lawns, mulch, grading and similar landscape installation. It is not a recurring maintenance agreement. If your job is mostly patios, walls or drainage, use the hardscape contract template; for wood or composite decks, the deck contract template. For a shorter bid with a design plan attached, see our landscape and hardscape proposal template. Everything is listed on our free contractor templates page.

Plants are where landscaping disputes start

A plant that dies in its first summer is a frequent source of disputes, and “it was supposed to be guaranteed” is the usual argument. Sections 9 and 10 spell out what is replaced, for how long, and what the owner has to do. Put the planting window and the watering responsibility in writing and the argument mostly goes away.

Price from quantities, not a lump

List the yards of mulch, square feet of sod and plant counts. It protects you on change orders and makes your price easy to compare. For labor and hourly pricing, see how much to charge per man hour for landscaping. Our paver patio estimating guide shows the same takeoff habits for hardscape.

Say what is not included

Irrigation repairs, tree work, pest treatment and ongoing maintenance cause the most scope arguments. Section 7 settles them before the first plant goes in. Pennsylvania licenses commercial pesticide applicators and the businesses that employ them, so check the rules before you offer any application; see the Pennsylvania pesticide license guide.

Pennsylvania checklist: does your contract meet HICPA § 517.7?

In Pennsylvania this template is a home improvement contract once the homeowner signs it. Under the Home Improvement Consumer Protection Act (73 P.S. § 517.7(a)), a contract is not valid or enforceable against the owner unless it meets 13 requirements. The act covers home improvement work where the total cash price of all work agreed upon is more than $500 (§ 517.2). This template covers them as follows:

  • Written, legible, with your registration number: header (HIC Reg. #).
  • Signed by owner and contractor, with the entire agreement and required notices attached: section 14.
  • Date, and your name, street address and phone (a P.O. box alone is not an address): header.
  • Approximate start and completion dates: section 6.
  • Work, materials and specifications; changes only by signed written change order: sections 2, 3, 4 and 8.
  • Total price, or a time-and-materials provision with a written estimate and a 10% cap: section 5. This template uses a fixed price.
  • Down payment and special-order advance listed separately: section 5.
  • Known subcontractors, and the insurance agreement ($50,000 personal injury and $50,000 property damage minimum, with the current amount): section 11.
  • Attorney General’s toll-free number and notice of the right to cancel: section 12.

Rules that sit next to the checklist

  • Three business days to cancel. The owner may rescind without penalty within three business days of signing (§ 517.7(b)), apart from the emergency exception in the law.
  • Give a completed copy at signing with the required notices (§ 517.7(c)).
  • No payment before signing (§ 517.9(9)).
  • Clauses to leave out. An owner can void a contract that contains a hold-harmless clause, a waiver of code requirements, a confession of judgment, a jury-trial waiver, a contractor attorney-fee award, a waiver of HICPA rights or an automatic renewal without the required notice (§ 517.7(e)). An arbitration clause must be in capital letters, in 12-point boldface, on a separate page with a signature line for each party (§ 517.7(d)). This template uses none of these.
  • Refund on a stalled job. If no substantial portion of the work has been performed and more than 45 days have passed since the contract’s starting date, the contractor must refund within 10 days of a certified-mail request (§ 517.9(2)).
  • Mechanics liens. A subcontractor has no lien right on a single townhouse or a one- or two-unit building that is or will be the owner’s residence once the owner has paid the contractor the full contract price (49 P.S. § 1301(b)). Get written lien waivers as you are paid. See Pennsylvania mechanics lien deadlines.

The text of HICPA has been the subject of bills in the 2025-26 session, so confirm current requirements with the Attorney General’s office or a Pennsylvania attorney before you finalize your form.

Not in Pennsylvania?

Home improvement contract rules, deposit limits, cancellation periods, lien deadlines and pesticide licensing vary widely by state. Start with our state guides, including mechanics lien deadlines by state and deposit limits by state, then have an attorney in your state review your final form.

This template is a starting point, not legal advice. Have an attorney in your state review it once before you use it. If you want the plan drawn too, we draw plans for contractors under your logo.

Sources: Home Improvement Consumer Protection Act, Act 132 of 2008, 73 P.S. §§ 517.2, 517.7, 517.9 (text of Act 132 at attorneygeneral.gov); Mechanics’ Lien Law of 1963, 49 P.S. § 1301(b) (findlaw.com); PA Department of Agriculture, Controlled Plant and Noxious Weed Lists (pa.gov); Penn State Extension, lawn establishment (extension.psu.edu/lawn-establishment); 61 Pa. Code § 55.6, lawn care services (law.cornell.edu); PA Business One-Stop Shop, construction contractors and landscapers guide (hub.business.pa.gov).

Questions

Can I use this landscaping contract template for my business?

Yes, free for any contractor. Edit it however you like. It is a starting point, not legal advice, so have an attorney in your state review your final version once.

How much deposit can a landscaper take in Pennsylvania?

On a home improvement contract over $5,000, no more than one-third of the price, plus the cost of special-order materials designated in the written contract. No payment may be taken before the contract is signed.

Do Pennsylvania homeowners have a right to cancel a landscaping contract?

Yes. Three business days from signing, without penalty, under 73 P.S. § 517.7(b), apart from an emergency exception. The contract must include a notice of that right.

Should I guarantee plants?

That is your business decision, but put the terms in writing: what is replaced, for how long, how many times and what the owner must do. Section 9 of the template shows one way to do it.

Does a landscaping job in Pennsylvania need a sales tax line?

It depends on the work. Under 61 Pa. Code § 55.6, planting trees and shrubs and seeding or sodding to establish a new lawn are not taxable lawn care, while mowing, fertilizing, aerating, lawn pesticide application and overseeding or sodding an existing lawn are. Confirm your situation with the Department of Revenue or your accountant.

Template by Groundwork Design Co., the design studio of Muthler Landscaping & Construction LLC, Lock Haven, PA. Not legal advice.