Concrete forms hold wet concrete in shape until it can stand on its own. Flatwork like patios, walks and driveways is formed with straight lumber staked to grade, round piers with fiber tubes, and walls with plywood or metal panels or insulated concrete forms that stay in place. Wall forms should stay on at least 8 to 12 hours after the pour when it’s above 50°F, per the Journal of Light Construction.
Match the form height to the finished thickness, stake it so it can’t bow or float, set the top to the grade you want water to follow, coat it with form release, and leave it on until the concrete won’t chip or slump when you pull it.
What are the main types of concrete forms?
| Form type | Used for | Notes |
|---|---|---|
| Dimensional lumber (2×4, 2×6, 2×8) | Slabs, patios, walks, driveways | A 2×4 is actually 3-1/2 inches tall and a 2×6 is 5-1/2, so a 4-inch slab is often formed with a 2×4 set on a little base or with a 2×6 |
| Bender board or plywood strips | Curves on walks and patios | Thin enough to bend; needs closer stakes |
| Fiber tubes | Round piers and deck footings | Set plumb and braced; cut off or peel after the pour |
| Plywood or metal panels | Walls, footings, steps | Held with ties and bracing against the concrete’s push |
| Insulated concrete forms (ICF) | Foundation and retaining walls | Foam blocks that stay in place as insulation |
Lumber actual sizes are the standard dressed sizes for nominal 2-by lumber. Our concrete slab cost guide covers what slabs run.
How do you set forms for a concrete slab or walk?
Pull string lines, then set the form tops to the finished grade, with a slight slope so water drains away from the house.
Drive stakes on the outside every few feet and at every joint, screw or nail them to the form, and cut them flush or below the top so the screed rides clean.
Coat the inside faces with form release so the boards pull clean, then check the height and slope once more before the truck arrives.
The base under the form matters more than the form; see our concrete driveway installation page for the base we build and the concrete driveway cost guide.
When can concrete forms be removed?
The Journal of Light Construction advises leaving wall forms in place at least 8 to 12 hours after the pour when it’s above 50°F, and holding off on backfilling or other heavy loads against new foundation walls for at least seven days. Cold weather slows the concrete, so forms stay on longer. Forms that hold up a suspended slab or beam are a different matter and come off only when the engineer or spec says. ACI 347, the American Concrete Institute’s formwork guide, covers removal of forms and supports in detail.
Pull side forms too early and corners chip and edges slump. Pull shoring under a structural slab too early and it can fail. When in doubt, leave it on.
Sources: JLC, how soon can forms be stripped, ACI 347, guide to formwork for concrete.
Concrete forms: frequently asked questions
What size lumber do you use for concrete forms?
Match the board to the slab thickness. A 2×4 is 3-1/2 inches tall and a 2×6 is 5-1/2, so 4-inch slabs are often formed with 2x4s set on a bit of base, or with 2x6s.
How far apart should form stakes be?
Every few feet and at every joint, closer on curves and deeper pours, so the form can’t bow when the concrete pushes on it.
How long should concrete forms stay on?
JLC advises at least 8 to 12 hours for wall forms above 50°F, longer in cold weather. Don’t load new walls with backfill for at least seven days.
What keeps concrete from sticking to forms?
A form release agent brushed or sprayed on the inside faces before the pour.
Can you reuse concrete forms?
Yes, lumber and metal forms can be cleaned and reused if they’re still straight. Fiber tubes and ICF are one-time.
What are ICF forms?
Insulated concrete forms: foam blocks stacked as a wall form and filled with concrete. They stay in place as insulation.
Do you form and pour concrete?
Yes. In central PA we form and pour concrete driveways and replace settled slabs. See our concrete driveway installation page.
Sources: Journal of Light Construction, form stripping · ACI 347, guide to formwork
Muthler Landscaping and Construction · Central Pennsylvania
Pouring a driveway or slab?
Want a design? Start here: our designers lay out driveways, patios and grades for any U.S. property. In central PA, we build the base, form and pour. Call (570) 397-9800.
Concrete driveways Want a design? Start here.Muthler Landscaping and Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.