A swale is a shallow vegetated channel that carries runoff across a yard and lets some soak in. Clemson Extension’s design numbers: channel slope 1 to 4 percent, side slopes 5 percent or less, soil that infiltrates at least 0.5 inch per hour, and flow under 5 cubic feet per second.

Swale vs. rain garden vs. French drain

Clemson says a swale conveys water from one point to another, unlike a rain garden, which holds it. A French drain is buried pipe. Use a swale where you have open ground and gentle slope, and a drain where you do not.

Design numbers (Clemson HGIC 1863)

  • Soil infiltration at least 0.5 in/hr; poorly drained soils need an underdrain.
  • Side slopes 5% or less; lengthwise slope 1 to 4%. At 4% a weir may be needed, and check dams can help on steeper grades.
  • Size as a rule of thumb at least 1% of the area draining to it.
  • Not recommended where flow may exceed 5 cfs, on very flat or steep ground, or where groundwater reaches the bottom.
  • Include a high-flow bypass or overflow outlet to a natural area or storm sewer.

Clemson does not give width, depth or length values or construction steps. The Massachusetts and Virginia guides below fill that gap, but they come from other states, so treat them as planning numbers and have a pro lay out grades.

Dimensions and sizing (Massachusetts CZM homeowner guide)

The Massachusetts Office of Coastal Zone Management’s homeowner fact sheet gives numbers a homeowner can use:

  • Depth: about 18 inches, to hold a 12 inch design water depth with 4 to 6 inches of freeboard.
  • Base width: 2 to 10 feet, in a trapezoidal channel with gentle curves to slow the water.
  • Side slopes: roughly 25 to 30 percent in the general guidance. Its worked example uses 25 percent.
  • Lengthwise slope: no steeper than about 1 to 3 percent. If steeper ground cannot be avoided, add check dams.
  • Sizing: design to hold the first inch of runoff from the drainage area. For 2,500 sq ft of roof and pavement, that is 200 cubic feet, and with a 3 foot base, 25 percent sides and 1 foot of water the example works out to about 28.6 feet of swale.

Siting, soil and setbacks

  • Setbacks: Massachusetts and Virginia Cooperative Extension both say at least 10 feet from building foundations, 50 feet from septic fields and 100 feet from drinking-water wells.
  • Water table: keep the swale bottom at least 2 feet above the seasonal high water table (both guides).
  • Slope limits: Virginia Tech says not to build on slopes over 4 percent, because water moves too fast and erodes the channel, and says flow needs at least a 1 percent slope.
  • Soil test: dig a hole 1 to 2 feet deep. Massachusetts says a hole that drains in under 24 hours is acceptable, and that water seeping in within an hour signals poor drainage. Do the test in spring, not right after heavy rain. Virginia notes a perc test may be needed. Avoid compacted or high-clay soils, since runoff will not infiltrate quickly.
  • Utilities and ordinances: check local setbacks, right-of-way and easements, and call 811 before digging (Virginia Tech). In Pennsylvania see 811 and PA One Call for homeowners.

Build steps

  1. Call 811 and check local rules before you dig.
  2. Test the soil and confirm the water table, then mark the path with a gentle curve and a lengthwise slope inside the 1 to 4 percent range.
  3. Excavate the trapezoidal channel. Avoid compacting the soil with heavy equipment, and till the bottom if it was compacted (Massachusetts).
  4. Add topsoil rich in organic matter, then plant densely or establish grass cover as quickly as possible.
  5. Protect new planting with an erosion-control blanket of natural fibers. Use triple-shredded mulch, not lightweight chips or straw that wash away.
  6. Build the overflow outlet so that big storms have a safe path.

Plants and care

Use dense, deep-rooted native plants that tolerate wet and dry. Inspect twice a year and after big storms for sediment, clogged inlets and erosion; repair with sod, rock or erosion matting. Keep fertilizer and herbicide use minimal. Avoid swales at stormwater hotspots like gas stations. Massachusetts suggests water-tolerant plants on the swale bottom (blue flag iris, swamp milkweed, cardinal flower) and drought-tolerant plants on the upper sides (switchgrass, little bluestem, gray dogwood). It says to plant in spring or fall, avoid big trees that shade the understory, and weed new swales regularly. In a grassed swale, mow once every 1 to 2 years in late winter or very early spring and never cut the grass shorter than the expected water depth. Virginia Tech says standing water should clear within four days, since mosquitoes can breed in seven.

Check dams

On steeper or longer swales, Massachusetts recommends check dams of wood, logs, fiber logs or stone, and says soil check dams are not recommended. Keep them no more than half the height of the swale banks, extend the ends up the bank and embed the bottom in the soil. One or two are typically enough for a swale under 100 feet.

Common mistakes

  • Aiming the swale at a neighbor’s property or a wetland. Oklahoma State Extension warns that improving drainage uphill can increase seepage downhill.
  • Building on high groundwater, or in high-clay or compacted soil.
  • No overflow path, which leaves muddy runoff in large storms.
  • Making the channel too steep. Over 4 percent, Virginia Tech says it erodes.
  • Skipping the utility check.
  • Leaving bare soil that can erode into the swale.

Pennsylvania notes

None of these sources is from Pennsylvania. The Massachusetts guide notes that rain over 1 inch is relatively rare in that state, which is a sizing assumption that may not hold for your site. Winter ground frost and spring thaw runoff in central PA are things to raise with your excavator when you plan the outlet. Ask your municipality and county conservation district about stormwater rules before you move earth, and do not send water onto a neighbor’s lot or a road. Planning only, confirm with your local code office.

When to hire a pro

Massachusetts says a professional is not required for a single-family home, but suggests a civil engineer, landscape architect or landscape contractor for design, excavation equipment and plant selection, and says to consult a professional if you are unsure about off-site impacts. Virginia Tech says small swales can be hand-dug, but to consult an engineer or grading contractor for larger, wider or longer swales or swales in a right-of-way or easement. If the swale needs to cross a long distance, tie into a storm drain or sit near the foundation, hire it out. For a wet basement, see wet basement causes and outdoor fixes.

Sources: Clemson Extension HGIC, An Introduction to Bioswales (2015); Oklahoma State Extension, Addressing Drainage Issues; Massachusetts CZM, Stormwater Solutions for Homeowners: Vegetated Swales; Virginia Cooperative Extension, Grass Swales (SPES-12P). Checked Nov 22-23, 2026.

Related

Drainage guide · Channel drain vs French drain · All guides

Get a quote

FAQ

What slope should a swale have?

Clemson Extension gives 1 to 4 percent along the channel and side slopes of 5 percent or less.

How big should a swale be?

Clemson’s rule of thumb is at least 1 percent of the area draining to it. A Massachusetts homeowner guide suggests about 18 inches deep with a 2 to 10 foot base, sized to hold the first inch of runoff.

Does a swale need an overflow?

Yes. Clemson says to include a high-flow bypass or overflow outlet.

How far should a swale be from the house?

Massachusetts and Virginia Cooperative Extension both say at least 10 feet from foundations, 50 feet from septic fields and 100 feet from wells.