Quick answer: In the Pennsylvania Stormwater BMP Manual, an infiltration berm is a low earthen embankment built along a contour to hold back and infiltrate runoff. The manual prefers berms no more than 24 inches high, mowed side slopes no steeper than 4:1, and at least 2 feet of separation to bedrock and the seasonal high water table.
What it is
BMP 6.4.10 in the Pennsylvania Stormwater Best Management Practices Manual covers infiltration berms and retentive grading. An infiltration berm is a linear, built-up earthen embankment placed along existing contours on a moderately sloping site to divert, hold back and infiltrate runoff. Berms can also serve non-stormwater purposes, such as landscape interest, noise or wind screening, and separating land uses. Retentive grading creates shallow saucers that store and infiltrate runoff where the site use allows. The manual says berms suit small impervious areas with limited open space, and work better as pretreatment for other distributed infiltration practices on very large, highly impervious sites.
Key design elements
- At least 2 feet of separation to bedrock and to the seasonally high water table.
- A distributed infiltration area with a maximum 5:1 impervious-to-infiltration ratio.
- Natural, uncompacted soils with acceptable infiltration capacity, following Protocols 1 and 2 in Appendix C.
- Low berms, preferably no more than 24 inches high.
- Mowed side slopes no steeper than 4:1, with the crest near one edge rather than in the middle.
- Minimum turf cover, with meadow, shrubs and trees recommended.
The manual says berms should not be placed on mapped low-shear-strength or slip-prone soils.
Side slopes and soil
| Item | What the manual says |
|---|---|
| Mowed berm side slopes | 4:1 or flatter |
| Tree-planted berm side slopes | 5:1 or flatter |
| Herbaceous (unmowed) side slopes | Up to 3:1; never steeper than 2:1 |
| Berms along slopes (infiltration design) | Under 12 inches high and vegetated |
| Top soil layer | Top one foot should be high-quality topsoil, well-drained soil below |
| Angle of repose | Non-compacted clay 5 to 20%, dry sand 33%, loam 35 to 40%, compacted clay 50 to 80% |
The manual recommends several small berms over a few large ones, run level along a constant-elevation contour. It says gravel should not be placed directly under topsoil. Shapes should blend with the landscape, with smoothly convex crests and concave toes.
Where the manual uses berms
- Meadow or woodland infiltration berms.
- Slope protection, using diversion berms: compacted earth ridges across a slope, built in series to intercept runoff and lengthen flow paths.
- Flow pathway creation, including retrofits of low impact development and detention basins.
- Berms around constructed wetlands, which the manual refers to its constructed wetland section.
The manual also lists an infiltration trench option, but does not recommend trenches in woodland because of the risk of root damage. See our infiltration trench guide.
Construction sequence in brief
- Install temporary erosion and sediment controls and finish grading outside the berm area, keeping disturbance low.
- Lightly scarify the berm footprint before soil is delivered.
- Place fill in 8-inch lifts, compacting each lift to the design specification and shaping as you go.
- Protect the ponding area from compaction. If it is compacted, scarify to at least 8 inches.
- Finish grade so crest and base are level, plant with turf, meadow, shrubs or trees, and mulch with compost mulch.
Maintenance
The manual says to inspect regularly to confirm water is infiltrating and to monitor drawdown after major storms. Mow turf, mulch trees and shrubs annually if needed, and mow meadow areas once a year with clippings removed. Keep heavy equipment off the infiltration area, remove trash and invasive plants, and check for channelization, restoring level grade promptly. The manual describes berms as often less expensive than other practices because extensive clearing is not needed, but gives no dollar figures.
Where the manual is inconsistent or silent
- Height: the key design elements allow berms up to 24 inches, while the infiltration design text limits berms along slopes to under 12 inches. They appear to address different contexts, but the manual does not reconcile them.
- Soil testing: the key elements call for following Protocol 1, yet one design consideration says soil testing is not required within existing woodland.
- Clay: design considerations allow clay in some tall or steep berms, while the specifications classify some clay soils as unsatisfactory.
- Missing numbers: ponding depth, setbacks, drawdown time and overflow design are not specified for this practice.
- Units: angle of repose is given as a percentage while side slopes are given as ratios, with no conversion.
Pennsylvania approvals and who designs it
A berm that is part of a stormwater plan needs a qualified professional for soil testing, sizing and overflow design. It may need approval from your municipality, the county conservation district or DEP. Check whether an erosion and sediment plan or NPDES permit applies (see Chapter 102 and PA stormwater plan rules). Neighbor runoff rules also matter, so see our drainage laws by state page.
Sources
- Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.4.10 Infiltration Berm and Retentive Grading, via the PA DEP eLibrary (greenport.pa.gov). Checked Nov 23, 2026.
Related
All drainage guides · Infiltration basin · Build a drainage swale · Curtain drains
FAQ
How tall should an infiltration berm be under the PA BMP Manual?
The manual recommends low berms, preferably no more than 24 inches high. Its infiltration design text limits berms along slopes to under 12 inches, and it does not reconcile the two figures.
What side slopes does the manual allow?
Mowed berms 4:1 or flatter, tree-planted berms 5:1 or flatter, and herbaceous unmowed berms up to 3:1, never steeper than 2:1.
What is retentive grading?
Retentive grading creates shallow saucers in the ground that store and infiltrate runoff where site uses allow.
Does the manual give a ponding depth for berms?
No. Ponding depth, setbacks, drawdown time and overflow design are not specified for this practice.
Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov 23, 2026.