What Is Drawdown Time in Stormwater Design?
Drawdown, also called drain-down time, is how long it takes for the water stored in a dry well, trench or basin to soak into the ground and empty out.
The 72-hour figure
Both Pennsylvania sources we reviewed use 72 hours. The BMP sheet for dry wells sets drawdown within 72 hours, and the DEP draft manual sets drain-down within 72 hours for the infiltration trench. A system that empties in that window is ready for the next storm. One that stays full holds water for days and cannot take more.
What controls it
Mostly the soil. Sand and gravel drain fast. Tight clay drains slowly or not at all, which is why infiltration systems depend on soil testing. A slow drawdown can also signal a clogged system, so it is a useful check during inspections.
How drawdown is checked on a dry well
The Pennsylvania BMP sheet for dry wells treats drawdown as a maintenance item. Inspections should confirm that stored water drains down in under 72 hours. Slow drainage cuts the system’s efficiency and can cause stagnant, anaerobic conditions and odor. If the well drains too slowly, it can be pumped out through the observation well, and if slow drainage keeps happening the system may need to be replaced. The sheet calls for at least one observation well, with a clean-out also recommended, so there is a way to look inside and a way to pump water out.
How storage and drawdown fit together
A dry well is an excavation filled with clean stone, and the stone holds water in its voids. The sheet gives an aggregate depth of 18 to 48 inches with about 40 percent void space, and a storage volume of the well’s area times its water depth times 0.40. The soil under the well then has to empty that stored volume inside the 72-hour limit. A well that is oversized for its drainage area or too small on the bottom will hold water longer, because the same soil surface has more water to pass.
Common mistakes that slow drawdown
- Compacting the bottom. The soil under an infiltration system should stay uncompacted, and the sheet says to excavate with the lightest practical equipment kept outside the well limits.
- Building it too early. Installing the well before the site is stabilized lets sediment wash in, so the sheet favors a later construction phase.
- Leaving silt on the bottom before the geotextile goes in.
- Skipping pretreatment. Gutter guards, a roof leader clean-out with a sump, or a sump box catch leaves and sediment before they reach the stone.
- Shortening the usual setback of about 10 feet from a building foundation without adding a liner on the building side.
Upkeep schedule
The sheet recommends inspecting at least four times a year and after any storm over 1 inch, and cleaning an intermediate sump box at least once a year. Keeping gutters clean protects the well from the debris that most often clogs it.
Related terms: infiltration trench, French drain, subgrade and compaction. Added details above come from the Pennsylvania Stormwater BMP Manual dry well sheet listed under Sources.
Planning information only. The infiltration trench figure comes from a 2005 draft, so confirm current requirements before design.
FAQ
Why 72 hours?
It lets the system recover between storms. The sources set it as the limit, though they do not all explain the reasoning.
How can I tell if mine is draining?
Dry wells are built with an observation well so you can check the water level after a storm.
What if it drains too slowly?
It may be clogged, or the soil may not infiltrate well enough. A designer can check.
Sources
- Pennsylvania Stormwater BMP Manual, BMP 6.4.6 Dry Well/Seepage Pit (via Wrightstown Township)
- Pennsylvania DEP draft Stormwater BMP Manual (January 2005), BMP 6.4 Infiltration Trench
Related
Back to the full glossary. Related terms: Dry well and Positive overflow.
Not sure if your drainage is working? Contact Muthler Landscaping & Construction.