Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

Riparian Forest Buffer: Widths, Zones and Planting (PA BMP Manual, Penn State)

Home / Drainage guides / Riparian forest buffer

Riparian forest buffer: widths, zones and planting

Quick answer: A riparian buffer is a permanent area of trees and shrubs beside a stream, pond, lake or wetland. The PA DEP BMP Manual recommends a minimum of 35 feet from the top of the stream bank with 100 feet preferred, while Penn State Extension recommends 30 to 100 feet on each side. The two sources are close but not identical.

What it is

The Pennsylvania Stormwater Best Management Practices Manual (BMP 6.7.1, Riparian Buffer Restoration) describes a riparian buffer as a permanent area of trees and shrubs next to streams, lakes, ponds and wetlands. It says riparian forests are the most beneficial buffer type, and that restoration responds to past activity that removed vegetation. Penn State Extension defines riparian buffers more broadly as the vegetated areas next to streams, rivers, lakes and other water bodies, and says forested buffers provide the maximum benefits.

Width: what each source says

SourceWidth guidance
PA DEP BMP Manual (description and key elements)Minimum recommended 35 feet from the top of the stream bank; 100 feet preferred
PA DEP BMP Manual (zone specification)Zone 1 fixed at 15 feet, Zone 2 at least 60 feet (Zones 1 and 2 total at least 75 feet), Zone 3 at least 20 feet
Penn State Extension30 to 100 feet on both sides of the waterway

The manual contradicts itself here: the 35-foot minimum in its description sits beside a zone specification that totals at least 95 feet with Zone 3, and at least 75 feet for Zones 1 and 2 alone. The manual says total width depends on project function, soil hydrologic group (Group D, or Group C with frequent flooding, increases Zone 2), one-third of the slope distance to the pollutant source, and land capability class, with figures of 75, 100 or 150 feet. Penn State says wider buffers and more diverse vegetation give greater benefits to wildlife and water quality.

The three zones

  • Zone 1: begins at the top of the stream bank, 15 feet wide, measured horizontally.
  • Zone 2: at least 60 feet, and may need widening under the total-width criteria.
  • Zone 3: at least 20 feet from the outer edge of Zone 2, with extra width if grading and mowing equipment needs it. Its purpose includes converting concentrated flow to shallow sheet flow using devices such as diversions, basins and level lip spreaders.

Planting numbers from the manual

The target is a mature native forest of diverse trees and shrubs that tolerate flooding and high water tables. The manual targets 320 trees per acre at maturity and suggests planting about 436 per acre at 10 by 10 foot spacing or 681 per acre at 8 by 8 foot spacing. Rules of thumb are 6 to 10 foot spacing for seedlings, 14 to 16 feet for bare root stock and 16 to 18 feet for larger container stock. Soil is the most important physical factor in plant selection, so use the county soil survey and a field test. Control invasive plants before planting, and begin invasive site preparation in the fall before planting.

Care and monitoring

  • Water: deep, regular watering during the first growing season.
  • Mulch: 2 to 4 inches, leaving air space around the trunk.
  • Weeds: herbicides for the short term (2 to 3 years), mowing twice per growing season at 8 to 12 inches, or weed mats. The manual calls non-chemical methods preferred.
  • Timing: avoid working in the riparian area from April 15 to August 15.
  • Monitoring: four times a year for the first four years and after severe storms. Survival of at least 70% counts as success, and the critical period is typically the first 3 to 5 years.
  • Deer: watch for browse lines 5 to 6 feet high. Tree shelters protect seedlings and are removed 2 to 3 years after emergence. Penn State also notes that tree tubes can protect seedlings until established.

What the buffer does

The manual lists removal figures of 65% for total suspended solids and 50% each for total phosphorus and nitrate, with Medium volume reduction and recharge. Penn State says a good, well-designed buffer can remove up to 80% of excess nutrients, and that roots stabilize banks while mowed grass alone does not prevent erosion. These figures come from different sources and are not directly comparable.

Where the sources are inconsistent

  • Minimum width: 35 feet in the manual description, at least 75 feet in its zone specification, and 30 feet at the low end of Penn State’s range.
  • Survival: the planting layout allows up to 40% mortality, implying 60% survival, but success is defined as 70% survival.
  • Seedling spacing: the 6 to 10 foot rule of thumb does not match the manual’s own per-acre math.
  • Not covered: the manual’s section does not address easements or give cost figures for this practice.

Pennsylvania approvals and who designs it

Buffer width, planting plans and stream-edge work can be regulated. A buffer used for stormwater credit or permit compliance needs a qualified professional, and work near streams or wetlands may need approval from your municipality, the county conservation district or DEP. See our wetland and stream buffer setbacks by state page and the Chapter 102 overview. Your county Penn State Extension office can connect landowners with partner agencies offering buffer resources.

Sources

  • Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.7.1 Riparian Buffer Restoration, via the PA DEP eLibrary (greenport.pa.gov). Checked Nov 23, 2026.
  • Penn State Extension, What Are Riparian Buffers? (no update date shown on the page; checked Nov 23, 2026).

Related

All drainage guides · Vegetated filter strip · Infiltration basin · Build a drainage swale

Get a quote

FAQ

How wide should a riparian forest buffer be in Pennsylvania?

The PA DEP BMP Manual recommends at least 35 feet from the top of the stream bank with 100 feet preferred, and its zone specification totals more. Penn State Extension recommends 30 to 100 feet on both sides of the waterway.

How many trees does the manual call for?

The manual targets 320 trees per acre at maturity and suggests planting about 436 to 681 per acre initially.

How do you know the planting worked?

The manual considers survival of at least 70% successful, and says the critical period is typically the first 3 to 5 years.

When should work in the buffer be avoided?

The manual says to avoid working in the riparian area from April 15 to August 15.

Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Sources checked Nov 23, 2026.