Wetland and stream buffer setbacks by state
Which states set a buffer around wetlands and streams, which leave it to towns and counties, and who issues the permit before you build a patio, wall or clear brush near the water. Plus the federal Army Corps Section 404 note that applies in every state.
Buffer rules change with the town, the stream class and the wetland type. Where a row says Not confirmed – check your local code, we have not verified that state’s rule from an official source yet. Last checked November 22, 2026; not legal advice.
Federal rule: Army Corps Section 404
Section 404 of the Clean Water Act governs discharges of dredged or fill material into waters of the United States. The Army Corps of Engineers issues the permits, and EPA sets the guidelines and can approve a state to run its own program. EPA lists only Michigan and New Jersey as states that have assumed the 404 program. Normal farming, ranching and some maintenance of existing structures are exempt. A state buffer rule is separate from, and on top of, the federal permit. Sources: EPA, Section 404 overview; EPA, state assumption of 404.
Wetland and stream rules, state by state
| State | What the state rule says | Permit agency | Official source |
|---|---|---|---|
| Alabama | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Alaska | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Arizona | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Arkansas | Not confirmed – check your local code | Not confirmed – check your local code | — |
| California | The State Water Board’s dredge-or-fill Procedures, effective May 28, 2020, include a state wetland definition and a review process for discharges to waters of the state. A statewide buffer width was not stated on the page we opened; check your city or county. | State Water Resources Control Board and regional boards | Water Boards |
| Colorado | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Connecticut | Each town’s inland wetlands agency issues the permit for regulated activities in wetlands and watercourses. Many towns also regulate a surrounding review, setback or buffer area, and the width varies by town. DEEP regulates only state agency work or work on state land. | Municipal inland wetlands agency (169 towns) | CT DEEP |
| Delaware | The state regulates all tidal wetlands and non-tidal wetlands of 400 or more contiguous acres. The page we opened does not address buffers. | DNREC | DNREC |
| District of Columbia | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Florida | An Environmental Resource Permit is needed for projects in, on or over wetlands or other surface waters. Applicants must avoid and minimize impacts first. Unauthorized dredging or filling can bring fines up to $10,000 per day per violation. An upland buffer width was not confirmed from the page we opened. | Florida DEP or the regional Water Management District | Florida DEP ERP FAQ (PDF) |
| Georgia | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Hawaii | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Idaho | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Illinois | State authority comes mainly from the Interagency Wetlands Policy Act of 1989, with secondary authority under the Rivers, Lakes, and Streams Act. IEPA acts under Clean Water Act Section 401. A buffer width was not stated on the page we opened. | IDNR and IEPA | Illinois DNR |
| Indiana | State-regulated (isolated) wetlands need an Isolated Wetland General or Individual Permit under IC 13-18-22 and 327 IAC 17. Class III wetland impacts need an individual permit. No buffer requirement is listed on the page we opened. | IDEM | IDEM |
| Iowa | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Kansas | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Kentucky | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Louisiana | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Maine | The Natural Resources Protection Act requires a permit for work in, on or over protected resources, and for work adjacent to certain ones (coastal wetlands, great ponds, rivers, streams, brooks, some freshwater wetlands). Dredging, filling, removing vegetation and building permanent structures are covered. The page does not give setback distances; they are in the rules. | Maine DEP (permit by rule under Chapter 305 for some work) | Maine DEP |
| Maryland | In the Chesapeake Bay Critical Area, a 100-foot naturally vegetated Buffer runs landward from tidal waters, tidal wetlands and tributary streams. Local governments may not permit disturbance of the Buffer unless the applicant meets strict variance rules. Nontidal wetland rules were not confirmed. | Critical Area Commission (Maryland DNR) and local governments | Maryland DNR |
| Massachusetts | Contact the conservation commission before work within 100 feet of a wetland (the buffer zone). A Request for Determination of Applicability or a Notice of Intent may be needed. Riverfront area is also protected; its width was not given on the page we opened. | Local conservation commission; MassDEP oversees | Mass.gov |
| Michigan | Wetlands are protected under Part 303 of the state environmental law, and a state wetland permit also serves as the federal approval because Michigan runs the 404 program. The page we opened does not mention buffers. | EGLE | Michigan EGLE |
| Minnesota | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Mississippi | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Missouri | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Montana | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Nebraska | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Nevada | Not confirmed – check your local code | Not confirmed – check your local code | — |
| New Hampshire | Shoreland Water Quality Protection Act: protected shoreland is land within 250 feet of lakes and ponds over 10 acres, 4th-order and larger streams and rivers, and tidal waters. Primary structures must be 50 feet from the reference line; accessory structures 20 feet. Within 50 feet, ground cover must stay intact apart from a 6-foot path. No fertilizer within 25 feet. Local rules may be stricter. | NHDES | NHDES summary (PDF) |
| New Jersey | NJDEP sets transition areas (buffers) up to 150 feet wide for wetlands under the Freshwater Wetlands Protection Act, and up to 300 feet for other wetlands. Every regulated water also has a riparian zone under the Flood Hazard Area Control Act rules. New Jersey runs its own 404 program. | NJDEP | NJDEP |
| New Mexico | Not confirmed – check your local code | Not confirmed – check your local code | — |
| New York | A permit is required for regulated activities in a protected freshwater wetland or its 100-foot adjacent area. Protected wetlands are 12.4 acres or larger (dropping to 7.4 acres on January 1, 2028), plus previously mapped wetlands and wetlands of unusual local importance. A court decision dated April 8, 2026 affects these rules; check DEC before you start. | NYSDEC (Adirondack Park Agency inside the Park) | NYSDEC |
| North Carolina | The state riparian buffer program covers the Neuse, Tar-Pamlico, Catawba, Randleman, Jordan and Goose Creek basins. The page we opened does not give the buffer widths; see the table of uses linked there. | NC DEQ | NC DEQ |
| North Dakota | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Ohio | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Oklahoma | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Oregon | A removal-fill permit is generally required at 50 cubic yards or more. In Essential Salmonid Habitat the threshold is zero: any amount needs a permit. Upland buffer areas inside compensatory mitigation sites also have a zero threshold. | Oregon Department of State Lands | DSL Removal-Fill Guide (PDF) |
| Pennsylvania | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Rhode Island | Regulated areas under the Freshwater Wetlands Act: 50 feet around a perimeter wetland, and 100 or 200 feet for a riverbank wetland. DEM does not use the words setback or buffer in its regulations. | Rhode Island DEM | RI DEM fact sheet (PDF) |
| South Carolina | Not confirmed – check your local code | Not confirmed – check your local code | — |
| South Dakota | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Tennessee | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Texas | TCEQ reviews Army Corps Section 404 applications under Clean Water Act Section 401. The page we opened describes no separate state wetland permit and no buffer rule. | TCEQ (401 review) | TCEQ |
| Utah | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Vermont | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Virginia | In Chesapeake Bay Preservation Act localities, the Resource Protection Area buffer is 100 feet wide and permitted uses do not reduce that width. Allowed development is limited (water-dependent uses, redevelopment, certain roads, flood control and exempt activities such as wells and trails). Any land disturbance in the RPA needs a water quality impact assessment. | Local government under DEQ regulations | 9VAC25-830-140 |
| Washington | Counties and cities set wetland buffers in their own critical areas ordinances under the Growth Management Act. Ecology’s 2022 guidance recommends buffer tables based on wetland category and habitat score. There is no single statewide width. | Local government; Ecology provides guidance | WA Ecology |
| West Virginia | Not confirmed – check your local code | Not confirmed – check your local code | — |
| Wisconsin | Shoreland zoning covers unincorporated land within 1,000 feet of a navigable lake, pond or flowage and within 300 feet of a navigable stream or the landward edge of its floodplain, whichever is greater. Buildings and structures must be at least 75 feet from the ordinary high water mark, with some exceptions. | County zoning authority, under DNR minimum standards (NR 115) | Wisconsin DNR |
| Wyoming | Not confirmed – check your local code | Not confirmed – check your local code | — |
Related guides: drainage laws by state, floodplain rules by state, and for Pennsylvania septic and well setbacks.
We have not yet confirmed Pennsylvania’s wetland and stream buffer numbers from an official source, so we are not printing any here. Before you build, clear or regrade near a stream or wetland, ask your municipality’s code office and the DEP regional office, and use our PA building permit lookup to find your code office.
Questions
Can I build a patio or wall next to a wetland?
Maybe, but check first. Where a state sets a buffer (for example New York’s 100-foot adjacent area or Massachusetts’ 100-foot buffer zone), work inside it can need a permit. Many states leave it to the town. Federal Section 404 can also apply to fill in a wetland.
Do I need an Army Corps permit?
If you discharge dredged or fill material into waters of the United States, which includes some wetlands and streams, Section 404 applies. The Corps issues the permit in most states. EPA lists Michigan and New Jersey as running the program themselves.
Does a state buffer replace the local rule?
No. Towns and counties can be stricter, and in states like Connecticut, Washington and Wisconsin the town or county sets or enforces the buffer itself.
Where do I look up my exact buffer?
Start with your town or county code office, then the state agency in the table. See also our floodplain rules and drainage laws guides.
Sources: EPA, Section 404 overview and state assumption; and the state pages linked in each row. States marked Not confirmed were not verified. Last checked November 22, 2026.
Muthler Landscaping & Construction · Lock Haven, PA
Building near water or a wet area?
We build retaining walls, drainage and hardscape across Clinton, Centre, Lycoming and Union counties, and we check stream and wetland limits before we dig.
Get a quoteRetaining wall permits by stateMuthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.
Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.
Cite as: Muthler Landscaping & Construction, “Wetland and Stream Buffer Setbacks by State,” https://muthlerlandscaping.com/state-guides/wetland-buffer-setbacks/ (page updated November 23, 2026).
Get an email when your state’s rules change
We re-check every entry against official sources. Tell us your state and we’ll email you when something changes.