Pervious Pavement with Infiltration Bed: What the PA Stormwater BMP Manual Says
Pervious pavement with infiltration bed: how the PA BMP Manual describes it
Quick answer: In the Pennsylvania Stormwater Best Management Practices Manual, BMP 6.4.1 is a permeable surface (porous asphalt, pervious concrete or porous pavers) over a uniformly graded stone bed that stores runoff and lets it soak into uncompacted soil. The manual itself is conflicted about whether it mainly controls peak rate or also cuts volume and pollutants.
What it is
BMP 6.4.1 is a permeable surface course placed over a clean-washed stone bed, with a geotextile layer between the stone and the soil to keep fines out. The manual says the bed bottom should be level and uncompacted, and that any new fill under it should be stone rather than compacted soil. An overflow control keeps water below the pavement surface in large storms. The manual lists parking lots, walkways, sidewalks, playgrounds, plazas and tennis courts, and says driveways are acceptable if the homeowner understands the system. It also reports that existing systems more than twenty years old still work and that freeze-thaw cycles do not tend to harm them.
Surface variations in the manual
- Pervious bituminous asphalt: placed on the stone subbase in one lift of 3.5 inches, lightly rolled to 2.5 inches.
- Pervious concrete: in Pennsylvania it must sit on a stone subbase, never directly on soil, and the surface must not be worked or it becomes impervious.
- Pervious pavers: interlocking units with openings filled with pervious material. The manual says compacted subgrades will not provide significant infiltration.
- Reinforced turf and gravel-filled grids: plastic units establish turf better than concrete because plastic does not absorb water.
Key design numbers
| Item | What the manual says |
|---|---|
| Bed depth | Typically 12 to 36 inches, about 40% voids |
| Bed stone | AASHTO No. 3 often used, washed, wash loss 0.5% or less |
| Choker course | About 1 inch of AASHTO No. 57 |
| Design storm | Beds typically sized for the 2-year storm, and should also convey larger storms such as the 100-year |
| Geotextile | Nonwoven polypropylene, at least 16 inches of overlap |
| Pipe (optional) | Continuously perforated, smooth interior, 6-inch minimum diameter |
| Infiltration period | Not to exceed 72 hours |
Infiltration volume is bed bottom area times the design infiltration rate (inches per hour) times the infiltration period (hours) times 1/12. The function table lists 85% for total suspended solids and total phosphorus and 30% for nitrate, with Medium ratings for volume reduction, recharge, peak rate and water quality.
Soils, siting and construction
The manual requires soil investigation and percolation testing (Protocols 1 and 2 in Appendix C). It does not give numeric distances to bedrock or the water table, numeric slope limits or a numeric drawdown time for this practice; drawdown is referred back to Chapter 3. See our guides on percolation testing and soil infiltration rate. Hot spots such as fueling stations need pretreatment.
- Install late in construction if possible and do not compact the subgrade.
- Scarify at least 6 inches where fines or ponding occur, with fine grading by hand.
- Place geotextile and stone immediately after the subgrade is approved.
- Place bed stone in 8-inch lifts, then the choker course.
- Test the finished surface with at least 5 gallons per minute of water; all of it should infiltrate without puddling.
Maintenance and winter care
The manual calls for vacuuming the surface with a commercial unit, with no pavement washing and no compressed air. Inlets to the bed should be cleaned twice a year. Keep heavy vehicles off, avoid sand or cinders in winter, and raise the plow blade about 1 inch. Salt is acceptable, with organic or magnesium chloride-based deicers preferred. Patch areas under 50 square feet; larger repairs need approval. Never seal coat. For a homeowner-level view of the product category, see permeable pavers pros and cons.
Where the manual contradicts itself
- Purpose: the key design elements say it is used almost entirely for peak rate control and that water quality and quantity are not addressed, yet the function table rates volume reduction, recharge and water quality Medium with 85% TSS and TP removal.
- Stone size: the description gives 1.5 to 2.5 inches, while the specification gives 2-inch to 1-inch stone.
- Vacuuming: twice a year in one place, two or three times a year in another.
- Residential use: residential is rated Limited, yet driveways are named as an acceptable use.
- Old cost figures (2005): pervious asphalt was put at 10% to 20% above standard asphalt, and recent installations at $2,000 to $2,500 per parking space combined. Treat these as dated.
Pennsylvania approvals and who designs it
Sizing the bed, picking the surface and checking soils need a qualified professional such as a licensed engineer. A permeable pavement system used for stormwater control may need approval from your municipality, the county conservation district or DEP. Check whether an erosion and sediment plan or NPDES permit applies (see Chapter 102 and PA stormwater plan rules). Related pages: subsurface infiltration bed and geotextile fabric.
Sources
- Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.4.1 Pervious Pavement with Infiltration Bed, via the PA DEP eLibrary (greenport.pa.gov). Checked Nov 23, 2026.
Related
All drainage guides · Infiltration trench · Infiltration basin · Catch basins and area drains
FAQ
How deep is the stone bed under pervious pavement?
The PA BMP Manual says bed depth is typically 12 to 36 inches with about 40% voids.
How long can the bed take to drain?
The manual says the infiltration period is not to exceed 72 hours.
Can pervious concrete go directly on soil in Pennsylvania?
No. The manual says it must sit on a stone subbase, never directly on soil.
Is salt allowed on pervious pavement?
The manual says salt is acceptable, with organic or magnesium chloride-based deicers preferred, and says to avoid sand or cinders.
Does the manual say it treats water quality?
It is inconsistent: one section says water quality is not addressed, while the function table lists 85% TSS and TP removal.
Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov 23, 2026.