811 Marking Colors: What Each Flag and Paint Color Means

Red is electric, yellow is gas, blue is water and white is your dig area. Here is every 811 marking color from the APWA code and how close you can dig.

The paint and flags a locator leaves in your yard follow a nationwide color code from the American Public Works Association (APWA). Red marks electric. Yellow marks gas, oil, steam, petroleum or gaseous materials. Orange marks communication, alarm or signal lines. Blue marks potable water, green marks sewer and drain lines, and purple marks reclaimed water, irrigation and slurry lines. White is not a utility at all: it marks the proposed excavation. Pink marks temporary survey markings.

The color tells you what a line carries. It does not give you exact position or depth, and it does not replace calling 811 before you dig. For how far ahead to call and why no depth is exempt, see how deep you can dig without calling 811. This article is about reading what the locators leave behind.

Quick answer

Red electric, yellow gas, oil, steam and petroleum, orange communications, blue potable water, green sewer and drain lines, purple reclaimed water, irrigation and slurry, white proposed excavation, pink temporary survey markings. Marks show where a line runs, not how deep it is. Inside the tolerance zone, APWA calls for non-powered hand tools or non-invasive methods until the line is exposed. If you see no marks, do not dig: PA One Call’s brochure says to wait for the utility to mark.

811 marking colors and what each one means

The table follows the APWA Uniform Color Code and is cross-checked against the color chart published by Virginia811, which uses the same meanings for every color it lists. The PA One Call homeowner brochure lists the same eight colors, with two additions: it adds hazardous materials to yellow and traffic loops to orange.

ColorWhat it marksConfirmed in
RedElectric power lines, cables, conduit and lighting cablesAPWA; Virginia811
YellowGas, oil, steam, petroleum or gaseous materialsAPWA; Virginia811
OrangeCommunication, alarm or signal lines, cables or conduitAPWA; Virginia811
BluePotable waterAPWA; Virginia811
GreenSewers and drain linesAPWA; Virginia811
PurpleReclaimed water, irrigation and slurry linesAPWA; Virginia811
WhiteProposed excavation: the planned digging, not an existing utilityAPWA; Virginia811
PinkTemporary survey markingsAPWA; PA One Call brochure (Virginia811’s chart does not list pink)
Colors and meanings from the APWA Uniform Color Code, cross-checked against Virginia811’s chart.
APWA utility marking colors and what each one marksEight color swatches. Red marks electric power. Yellow marks gas, oil, steam and petroleum. Orange marks communications, alarm and signal lines. Blue marks potable water. Green marks sewer and drain lines. Purple marks reclaimed water, irrigation and slurry lines. White marks proposed excavation. Pink marks temporary survey markings.RedElectric powerYellowGas, oil, steam, petroleumOrangeCommunications, alarm, signalBluePotable waterGreenSewer and drain linesPurpleReclaimed water, irrigation, slurryWhiteProposed excavationPinkTemporary survey markings
Colors and meanings from the APWA Uniform Color Code. Swatch shades are illustrative; real paint and flag shades vary.

Paint, flags and stakes: how the marks are made

APWA’s guidance describes two layers of marking. Color-coded paint or chalk on the surface shows the location or route of active and out-of-service buried lines, and vertical markers such as stakes or flags supplement the surface marks so they are easier to see. The marks and markers carry the owner’s name, initials or logo, plus the width of the facility if it is more than 2 inches (50 mm). If someone other than the owner or its agent places a mark, it identifies the firm that made it.

Two more APWA details help when a yard shows a lot of paint. Multiple lines in a joint trench are marked in tandem. And where the surface over a line is going to be removed, offset markings on a uniform alignment indicate how far away the facility is. Virginia811 says marks are made with flags or a special spray paint, and that neither causes long-term harm to your lawn.

One request can bring more than one color. The national 811 homeowner page says that, on average, between 7 and 8 utility operators are notified for each request, so a single yard may show several colors from several owners.

White: the mark you make yourself

The utility colors are put down by or for the utility that owns each line. White is the exception: APWA defines it as the mark that shows the location, route or boundary of proposed excavation, which is your dig area rather than a line in the ground. The PA One Call homeowner brochure shows how this works in Pennsylvania: when you call, you are asked whether the proposed excavation area is marked in white, yes or no, and the brochure tells you to always look for the markings on the ground before your dig date.

For the Pennsylvania notice rules and a wider look at dig laws, see dig laws in all 50 states.

How close can you dig to a mark?

APWA’s guidance says excavation within the tolerance zone uses non-powered hand tools or non-invasive methods until the facility is exposed. Where law or code does not set the width of the zone, APWA recommends the facility width plus 18 inches on each side, measured horizontally. The national 811 homeowner page gives a rule of thumb for homeowners: try to avoid digging on top of or within 18-24 inches of the marks on all sides, and it notes that this may mean moving your project to a less congested part of the yard.

States set their own tolerance rules and notice periods. For Pennsylvania, the PA One Call brochure says to dial 811 or 1-800-242-1776 and to set the excavation date not less than 3 business days or more than 10 business days after you call. The 811 Before You Dig state page gives the same number and a 3 to 10 business day window for the construction phase. The Pennsylvania Public Utility Commission says 811 is the number to call within Pennsylvania and 1-800-242-1776 is for callers outside the state, and the state statute (73 P.S. § 180) says notification must be not less than three nor more than ten business days before excavation begins, with a longer minimum for complex projects.

Builder’s note: The sources say two things. The 811 site describes requesting that the approximate location of buried utilities be marked with paint or flags, and APWA’s tolerance-zone guidance calls for non-powered hand tools or non-invasive methods until the facility is exposed. The advice, which is not from any source: read a mark as “a line of this type runs about here,” and treat the whole zone as the place the line could be.

If the marks are missing, faded or gone

The PA One Call brochure is blunt: if you do not see markings, do not allow anyone to dig, and wait for the lines to be marked by the utility. It also says owner responses are sent on the morning of your scheduled excavation date. The national 811 homeowner page says to confirm that all utilities have responded to your request.

Marks are meant to last through the job, within limits. The 811 homeowner page says the marks provided by utility operators are your guide for the duration of your project, and to ask your 811 center for a re-mark if you are unable to maintain the marks or the project continues past the request’s expiration date, which varies by state. The Pennsylvania summary on 811 Before You Dig lists mark validity as “as long as equipment is kept on site.”

What the colors do not tell you

The color code assigns a color to what a line carries and puts it on the surface where the line runs. The APWA sheet gives no depth for any color, and the national 811 site says some utilities are buried just inches below the surface. That is why the no-safe-depth article treats every digging project, at any depth, as one that needs a request.

The marking sources cited here cover lines owned by utilities. They do not address private lines on your property, such as a yard light feed or a sprinkler lateral, so ask your 811 center how those are handled before you dig near them.

Frequently Asked Questions

What do the colors of utility flags mean?

Per the APWA Uniform Color Code: red is electric power lines, cables, conduit and lighting cables; yellow is gas, oil, steam, petroleum or gaseous materials; orange is communication, alarm or signal lines, cables or conduit; blue is potable water; green is sewers and drain lines; purple is reclaimed water, irrigation and slurry lines; white is proposed excavation; and pink is temporary survey markings.

What do white and pink 811 marks mean?

White marks the location, route or boundary of proposed excavation, which means the planned digging, not a utility. Pink marks temporary survey markings, per the APWA color code, which gives no further detail. When you call PA One Call, you are asked whether the proposed excavation area is marked in white.

How close can I dig to a utility mark?

The APWA color code says excavation within the tolerance zone uses non-powered hand tools or non-invasive methods until the line is exposed. Where law or code does not set the width, it recommends the facility width plus 18 inches on each side. The national 811 homeowner page says to try to avoid digging on top of or within 18-24 inches of the marks on all sides. States set their own rules, so confirm yours with your one-call center.

Do 811 marks show how deep a line is?

Not in anything the APWA color code spells out: it assigns colors by what a line carries and marks where it runs, and gives no depth for any color. The national 811 site says some utilities are buried just inches below the surface, which is why every digging project needs a request regardless of depth.

What should I do if the flags or paint are gone before I dig?

Do not dig on a guess. The PA One Call brochure says that if you do not see markings, you should not allow anyone to dig, and should wait for the lines to be marked by the utility. The national 811 homeowner page says to ask your 811 center for a re-mark if you are unable to maintain the marks or your project continues past the request’s expiration date, which varies by state.

Sources: American Public Works Association, Uniform Color Code (Guidelines for Uniform Temporary Marking of Underground Facilities); Virginia811, What do the markings mean?; PA One Call System (PA 811), homeowner brochure, 2019, Temporary Marking Guidelines (secondhand copy hosted on westtownpa.org); 811 Before You Dig (Common Ground Alliance), home page; 811 Before You Dig, 811 Information for Homeowners; 811 Before You Dig, Pennsylvania state page; Pennsylvania Public Utility Commission, PA One Call (811); 73 P.S. § 180, Pennsylvania Underground Utility Line Protection Law (text via FindLaw).