Dry Well and Seepage Pit: PA Stormwater BMP Manual
Dry well and seepage pit: how the PA BMP Manual describes it
Quick answer: In the Pennsylvania Stormwater Best Management Practices Manual, a dry well (also called a seepage pit) is a below-ground pit or chamber that temporarily stores roof runoff and lets it soak into the ground. It needs an overflow path, sits at least about 10 feet from a foundation unless the designer says otherwise, and should empty within 72 hours.
What it is
BMP 6.4.6 in the manual describes a dry well as a subsurface facility for temporarily storing and infiltrating rooftop runoff, with roof leaders connected directly to it. It can be an excavated pit filled with graded stone and wrapped in geotextile, or a prefabricated chamber or pipe segment. The manual’s reasoning is that roofs are usually low in pollutants but are a major source of new runoff volume, so catching roof water at the source reduces volume and peak rate and can help water quality. It is meant for roofs and impervious areas with relatively low sediment loads, not for hot spots or high-sediment areas without added pretreatment.
Ratings in the manual
The manual lists estimated pollutant removal of 85% for total suspended solids, 85% for total phosphorus and 30% for nitrate. Volume reduction and peak rate control are rated medium, groundwater recharge is rated high, and water quality is rated medium. Residential, commercial, ultra-urban and retrofit uses are marked as suitable, and industrial use is marked limited.
Key design numbers
| Item | What the manual says |
|---|---|
| Stone depth | 18 to 48 inches of clean, washed, uniformly graded aggregate |
| Stone | AASHTO No. 3 or similar (2-inch to 1-inch), about 40% voids, wash loss no more than 0.5% |
| Soil cover | At least 12 inches of soil over the well |
| Distance from foundation | Typically 10 feet; the designer may shorten it |
| Geotextile | Nonwoven, wrapping the stone |
| Observation well | At least one, with a cleanout recommended |
| Pipe | Continuously perforated, smooth interior, 4-inch minimum inside diameter |
| Drain-down | Maximum 72 hours in the maintenance section |
The manual figures storage volume as well area times water depth times 40% for stone fill. It says the well may count both bottom and side infiltration, depending on the design, and it refers to Chapter 8 for peak rate and water quality calculations without giving formulas in this section.
Design considerations the manual lists
- Size to the roof: the well should hold and infiltrate runoff from a limited roof area, avoiding hydraulic overload based on bottom area and drainage area.
- Drain-down: slow drainage reduces efficiency and can cause anaerobic conditions and odor.
- Frost: set the design depth below frost depth to prevent frost heave.
- Basement risk: avoid installation that creates a significant seepage or flooding risk. Shorter distances from the house may call for an impermeable liner on the building side.
- Overflow: every well must be able to send overflow downstream, through a surcharge pipe from the roof leader or a connection to a larger infiltration area.
- Leaf screen: install a removable screened filter in the roof leader, below the surcharge pipe, to catch leaves and debris.
- Pretreatment: options include gutter guards, a roof leader cleanout with a sump, or an intermediate sump box. The manual also says construction debris can be a concern.
Variations
The manual describes three. An intermediate sump box has a raised outflow so sediment settles before a mesh screen passes flow into the well. A drain without gutters lets runoff sheet off a pitched roof onto stabilized ground cover, then pipes or swales direct it to the well. A prefabricated plastic chamber can replace the stone, giving more storage per unit of space, and the manual says it can perform as well as a stone well if the design guidelines are followed.
Soils come first
The manual points to the infiltration guidelines in Appendix C, including Protocol 2, for soil testing. This section does not repeat numeric limits for bedrock depth or water table, so those must come from the appendix and local rules. See our guides on percolation testing and soil infiltration rate.
Construction sequence in brief
- Protect the infiltration area from compaction and install the well late in construction if possible, with erosion and sediment controls in place.
- Excavate to a level, uncompacted subgrade free of rock and debris, using the lightest practical equipment kept outside the well limits.
- Wrap the excavation in nonwoven geotextile with at least 24 inches of overlap, then connect perforated pipe, observation wells and roof leaders as shown on the plans.
- Place washed stone in 6-inch lifts, lightly compacting between lifts, then fold the fabric over with at least 12 inches of overlap.
- Add a 12-inch lift of approved topsoil, seed and stabilize, and connect the surcharge pipe over the splashboard.
- Keep erosion and sediment controls until the site is stabilized.
Maintenance
The manual says to inspect at least four times a year and after every storm over 1 inch, check the drain-down time, clean gutters, replace the screen filter as needed, and clean any intermediate sump box at least once a year. If the well takes longer than 72 hours to drain, the manual says to pump it and clean the perforated pipe, and to replace the system if slow drainage persists. Removed sediment and debris must be disposed of at approved facilities.
Costs (old figures)
The manual gives construction costs of $4 to $9 per cubic foot of storage in 2003 dollars, with annual maintenance at about 5% to 10% of capital cost. These are old figures and should not be used as a current price.
Where the manual contradicts itself
- Setback: the description says wells should not be placed too close to structures, the design section says 10 feet is typical, and it then lets the designer shorten that distance.
- Storage definition: storage is defined as the volume below the discharge invert, but the formula uses water depth.
- Stone label: the stone specification is headed “stone for infiltration trenches,” which looks carried over from the trench section.
- Drain-down: design points to the Chapter 3 limits, while maintenance sets 72 hours as the maximum.
- Pipe size: the dry well calls for a 4-inch minimum perforated pipe, while the infiltration trench calls for 8 inches. These are different practices, so treat them as variations.
Pennsylvania approvals and who designs it
Sizing, soil testing and overflow design need a qualified professional such as a licensed engineer, and a dry well used for stormwater control may need approval from your municipality, the county conservation district or DEP. Check whether an erosion and sediment plan or NPDES permit applies (see Chapter 102 and PA stormwater plan rules). Also read sump pump discharge location, and the glossary entry for dry well.
Sources
- Pennsylvania Department of Environmental Protection, Pennsylvania Stormwater Best Management Practices Manual (363-0300-002, December 30, 2006), BMP 6.4.6 Dry Well / Seepage Pit, via the PA DEP eLibrary. Checked Nov 23, 2026.
Related
All drainage guides · Infiltration trench · Install a dry well · Cisterns
FAQ
How far should a dry well be from the house?
The manual says 10 feet from foundations is typically recommended, but the designer may shorten it, and shorter distances may need an impermeable liner on the building side.
How long should a dry well take to drain?
The manual’s maintenance section sets a maximum drain-down of 72 hours. If it takes longer, pump the well and clean the pipe.
How deep is the stone in a dry well?
The manual calls for 18 to 48 inches of washed stone with about 40% voids, under at least 12 inches of soil.
Can a dry well take water from a parking lot?
The manual limits dry wells to roofs or impervious areas with relatively low sediment loads and says high-sediment areas and hot spots need added pretreatment.
Planning information only. Design must be done by a qualified professional and approved by your municipality and, where required, DEP. Source checked Nov 23, 2026.