Virginia Building Codes, Permits and Contractor Rules

Here’s every rule from our 50-state guides for Virginia on one page: the residential building code, frost depth, retaining wall permits, the 811 dig law, drainage law, contractor licensing, deposit limits, mechanics lien deadlines, workers’ comp, planting zones and frost dates. Each section links the official source and the full 50-state comparison.

Virginia at a glance

  • Building code: 2021 IRC (statewide)
  • Frost depth: Set locally; often 12 in.
  • 811 notice: Operators must mark by 7:00 a.m. on the 3rd working day after the locate request; Virginia 811 says contact it at least 3 working days before excavation
  • Contractors: State license required
  • Deposits: No statewide cap
  • Liens: 90 days after end of month of last work
  • Workers’ comp: 3+ (subs' workers can count)
  • Drainage rule: Modified common enemy
  • Planting zones: 5b to 8b
TopicVirginiaCompare
Residential building code2021 IRC (statewide)All states
Frost line depthSet locally; often 12 in.All states
Retaining wall permitExempt if supporting less than 3 ft of unbalanced fill and not built to impound Class I, II or III-A liquids or to support a surcharge other than ordinary…All states
811 notice before diggingOperators must mark by 7:00 a.m. on the 3rd working day after the locate request; Virginia 811 says contact it at least 3 working days before excavationAll states
Contractor licenseState license requiredAll states
Deposit limitNo statewide capAll states
Right to cancel3 business days, sales made at homeAll states
Lien filing deadline90 days after end of month of last workAll states
Workers’ comp required3+ (subs' workers can count)All states
Drainage between neighborsModified common enemyAll states
Planting zones (2023 USDA)5b to 8bAll states
Frost dates (NOAA)Last frost mid-Mar (Norfolk) to late Apr (Blacksburg); first frost mid-Oct (Blacksburg) to late Nov (Norfolk)All states
Summary for Virginia. Details, exceptions and official sources are in each section below.

Virginia residential building code

Code
2021 Virginia Residential Code (2021 International Residential Code with Virginia amendments, part of the 2021 Uniform Statewide Building Code)
How it applies
Statewide, mandatory everywhere
In effect since
January 18, 2024
Code agency
Virginia Department of Housing and Community Development (Board of Housing and Community Development)
Who enforces it
Enforced by county and city building departments. The USBC supersedes local building codes, so localities cannot adopt their own.
Good to know
Virginia uses one statewide code, based on the 2021 IRC, and localities can't adopt their own. A 2024-based update is in development, so ask your building department which edition applies.

Compare building codes in all 50 states

Frost line depth in Virginia

Who sets it
Local building department
Local examples
Prince William County: 24 in.
City of Charlottesville: 18 in.
City of Newport News: 12 in.
Typical range
12 in. in Hampton Roads (Newport News) to 24 in. in Northern Virginia (Prince William)
Good to know
Virginia's western mountain counties aren't listed, so check with your county building department.

Frost line depth in every state

Retaining wall permits in Virginia

Permit exemption
Exempt if supporting less than 3 ft of unbalanced fill and not built to impound Class I, II or III-A liquids or to support a surcharge other than ordinary unbalanced fill (USBC §108.2, item 7; 13VAC5-63-80).
Who decides
Your county or city building department enforces the USBC.
Good to know
Virginia is stricter than the model code: the limit is 3 ft of unbalanced fill, not 4 ft measured from the footing.

Retaining wall permit rules in every state

811 dig law in Virginia

One-call center
Virginia 811 (VA811)
Notice before digging
Operators must mark by 7:00 a.m. on the 3rd working day after the locate request; Virginia 811 says contact it at least 3 working days before excavation
Ticket good for
15 working days from 7:00 a.m. the next working day after the request (or from the scheduled excavation date, if later)
Hand-dig zone
2 ft (24 in.) on either side of the staked or marked location
Homeowners
The law exempts 'any hand digging performed by an owner or occupant of a property' (Va. Code § 56-265.15:1), with no conditions attached; agricultural tilling is also exempt. Virginia 811's homeowner FAQ still says, 'You must contact Virginia 811 for all digging projects.' Any digging with machinery by a homeowner requires a ticket.
The law
Va. Code Ann. § 56-265.14 et seq. (Underground Utility Damage Prevention Act); exemptions at § 56-265.15:1
Good to know
Request a re-mark 3 working days before your ticket expires.

811 dig laws in every state

Drainage law and stormwater permits in Virginia

Rule
Modified common enemy
The rule
Modified common enemy: surface water is a common enemy each landowner may fight off as best he can, provided he does so reasonably and in good faith and not wantonly, unnecessarily or carelessly; no one may injure another by interfering with water in a natural channel or watercourse.
Leading case
Collett v. Cordovana. Va. S. Ct. Record No. 141297 (June 4, 2015); quoting Mullins v. Greer, 226 Va. 587, 311 S.E.2d 110 (1984) and McCauley v. Phillips, 216 Va. 450, 219 S.E.2d 854 (1975)
What it means for your yard
You can regrade or build to keep water off your property, but you must act reasonably and in good faith, not carelessly or unnecessarily, and you can't interfere with water in a natural channel to a neighbor's harm.
Construction stormwater permit
Virginia Department of Environmental Quality (DEQ); localities run most Virginia Erosion and Stormwater Management Programs (VESMPs) and erosion control programs: 1 acre or more (or less if part of a larger common plan that will disturb 1 acre or more): Virginia construction general permit (2024 general VPDES permit, July 1, 2024 to June 30, 2029)
State rules below 1 acre
Erosion control and water quantity criteria apply to land disturbance of 10,000 sq ft or more, or 2,500 sq ft or more in Chesapeake Bay Preservation Areas (other than single-family detached homes, which localities may also regulate); localities may set lower thresholds (Va. Code 62.1-44.15:34(E))
Local rules
Virginia counties, cities and towns administer land-disturbance permits and often set thresholds below the state's 10,000 sq ft.
Good to know
Virginia lets landowners fend off surface water if they act reasonably and in good faith, but not by interfering with water in a natural channel to a neighbor's harm. Disturbing 10,000 sq ft or more (2,500 sq ft in Chesapeake Bay Preservation Areas) triggers erosion control requirements, and many localities set lower limits.

Drainage laws in every state

Contractor licensing in Virginia

Statewide rule
License
Agency
Virginia DPOR Board for Contractors
Who needs it
Contractors need a Class A, B or C license based on single-job and annual volume; Class C starts at jobs over $1,000.
When it applies
Jobs over $1,000 (Class C over $1,000 to under $30,000; Class B $30,000 to under $150,000; Class A $150,000+)
Check a contractor
Official lookup
Good to know
License classes are set in Va. Code 54.1-1100, and the Recovery Fund in 54.1-1123.

Contractor license requirements in every state

Contractor deposits and your right to cancel in Virginia

Deposit limit
No statewide cap. The residential contract must state the exact down payment amount and the progress payment schedule (18VAC50-22-260(B)(9)).
Right to cancel
Home solicitation sales: may cancel until midnight of the third business day after signing (Va. Code § 59.1-21.3). No cancel right for a signed, dated emergency request where the seller has substantially begun.
Written contract
Licensed contractors must use a written contract for residential work, signed before work starts or payment is accepted, that includes start and estimated completion dates, total cost (or the cost-plus or time-and-materials basis with a cap), the down payment and progress payment schedule, the materials and work requested, a delay clause, permit compliance, each party's cancellation rights, the consumer's signed acknowledgment of the DPOR consumer protection statement, the contractor's license number and class, a signed-change-order requirement, and a notice about the Virginia Contractor Transaction Recovery Fund (18VAC50-22-260(B)(8)–(10)).
Other protections
Virginia Contractor Transaction Recovery Fund for consumers harmed by licensed contractors (notice required in every residential contract, 18VAC50-22-260(B)(9)(k)).
The law
Va. Code §§ 59.1-21.1 to 59.1-21.7 (Home Solicitation Sales Act); 18VAC50-22-260 (Board for Contractors standards of conduct)
Good to know
Virginia doesn't cap deposits, but a licensed contractor can't take any payment before both of you sign a written contract that spells out the down payment and payment schedule.

Contractor deposit limits in every state

Mechanics lien deadlines in Virginia

Lien deadline (prime)
Record a memorandum of lien no later than 90 days after the last day of the month in which the claimant last furnished labor or materials, and no later than 90 days after the building is completed. It can't include sums for work more than 150 days before the last day of work (retainage up to 10% excepted). General contractors also file a certification that a copy was mailed to the owner (Va. Code § 43-4).
Lien deadline (sub/supplier)
Same deadlines (Va. Code §§ 43-4, 43-7, 43-9); a sub's lien can't exceed what the owner owes the general contractor (§ 43-7).
Preliminary notice (sub/supplier)
Where the building permit for a one- or two-family home names a lien agent, subs and suppliers must notify the lien agent within 30 days after first furnishing (or after the permit issues); late notice limits the lien to work after the notice (Va. Code § 43-4.01). Subs must also give the owner written notice of the amount and character of the claim (Va. Code §§ 43-7, 43-9).
Notice of intent
Not required.
Enforce within
Suit within 6 months after recording the memorandum or 60 days after the building is completed or work terminated, whichever is later (Va. Code § 43-17).
Homeowner rules
A sub's lien is capped at what the owner owes the general contractor when notified (Va. Code § 43-7). Sellers of one- or two-family homes must give the buyer an affidavit at settlement that contractors in privity have been paid or listing amounts owed (§§ 43-13.2, 43-13.3).
The law
Va. Code Title 43, Ch. 1 (Mechanics' and Certain Other Liens), § 43-1 et seq.
Good to know
Virginia's lien deadline is 90 days after the end of the month you last worked, but never more than 90 days after the house is finished. On one- or two-family homes, check the building permit for a lien agent and notify it within 30 days of starting.

Mechanics lien deadlines in every state

Workers' comp requirements in Virginia

Who must carry it
Businesses with more than two (3 or more) part- or full-time employees regularly in service must carry coverage. Executive officers count, and employees of subcontractors count when you hire subs in your own trade or to fulfill a contract (Va. Code § 65.2-101; Virginia WCC Employer FAQ, rev. 02/25). No separate construction threshold.
Owners and officers
Sole proprietors with no employees or subs need not carry coverage. Corporate officers and LLC managers are employees even without salary, and may reject coverage only if the business has a policy and they file a Rejection of Coverage form. A single-member LLC member isn't covered unless they elect it with the insurer (Virginia WCC Employer FAQ).
Subcontractors
An owner who subcontracts work that is part of its own trade or business is liable to the sub's workers as if it employed them directly; a contractor doing work for someone else (outside that person's trade) who subcontracts is liable the same way, and liability carries down through further subcontracts (Va. Code § 65.2-302(A)-(C)).
Homeowners
Owner liability under § 65.2-302(A) applies only when the work is part of the owner's own trade or business; when a homeowner hires a contractor, the contractor who subcontracts is the one liable for its subs' workers (§ 65.2-302(B)).
Penalties
Civil penalty of up to $250 per day of noncompliance, capped at $50,000, plus collection costs (Va. Code § 65.2-805; Virginia WCC Employer FAQ).
The law
Va. Code Title 65.2; §§ 65.2-101, 65.2-302, 65.2-805
State agency
Virginia Workers' Compensation Commission
Good to know
Virginia requires coverage at 3 employees, and your subcontractors' workers can count toward that if they do your kind of work. Penalties run up to $250 a day, capped at $50,000.

Workers' comp requirements in every state

Planting zones in Virginia

2023 USDA zones
5b to 8b
Coldest-night range
−15°F to 20°F
Warmest area
Hampton Roads
Example cities
Richmond: 7b, Virginia Beach: 8b, Norfolk: 8b, Roanoke: 7b
Good to know
Central Virginia moved from 7a to 7b on the 2023 map, and nearly every Hampton Roads city went from 8a to 8b.

Planting zones in every state

Frost dates in Virginia

StationLast spring frostFirst fall frostFrost-free days
Norfolk
Hampton Roads coast
March 17November 23252
Richmond
Central Virginia
April 3November 4215
Roanoke
Blue Ridge / Roanoke Valley
April 3November 1210
Blacksburg
Southwest Virginia highlands
April 24October 19175
Typical range
Last frost mid-Mar (Norfolk) to late Apr (Blacksburg); first frost mid-Oct (Blacksburg) to late Nov (Norfolk)
Good to know
These are typical (50%) dates from NOAA's 1991–2020 climate normals, so about half of years still bring a 32°F night after the listed spring date. In Virginia, the last spring frost at the stations listed ranges from mid-March around Norfolk to late April around Blacksburg.
Local frost or planting guide
Virginia Cooperative Extension

Frost dates in every state

Frequently Asked Questions

What building code does Virginia use?

2021 Virginia Residential Code (2021 International Residential Code with Virginia amendments, part of the 2021 Uniform Statewide Building Code). It applies as follows: statewide, mandatory everywhere. Your local building department can confirm the edition and amendments for your address.

How deep is the frost line in Virginia?

Frost depth is set by local building departments. Typical local values: 12 in. in Hampton Roads (Newport News) to 24 in. in Northern Virginia (Prince William). Footings for houses, additions and attached decks go below it.

How much can a contractor ask for up front in Virginia?

No statewide cap. The residential contract must state the exact down payment amount and the progress payment schedule (18VAC50-22-260(B)(9)). Cancel rights: Home solicitation sales: may cancel until midnight of the third business day after signing (Va. Code § 59.1-21.3). No cancel right for a signed, dated emergency request where the seller has substantially begun.

How long does a contractor have to file a mechanics lien in Virginia?

Record a memorandum of lien no later than 90 days after the last day of the month in which the claimant last furnished labor or materials, and no later than 90 days after the building is completed. It can’t include sums for work more than 150 days before the last day of work (retainage up to 10% excepted). General contractors also file a certification that a copy was mailed to the owner (Va. Code § 43-4). Subcontractors and suppliers may have different notice rules; see the section above.

What planting zone is Virginia?

On the 2023 USDA map, Virginia runs from zone 5b to 8b. Examples: Richmond 7b, Virginia Beach 8b, Norfolk 8b. Enter your ZIP on the USDA map for your exact zone.

Do contractors need workers' comp in Virginia?

Businesses with more than two (3 or more) part- or full-time employees regularly in service must carry coverage. Executive officers count, and employees of subcontractors count when you hire subs in your own trade or to fulfill a contract (Va. Code § 65.2-101; Virginia WCC Employer FAQ, rev. 02/25). No separate construction threshold. Owner exemptions and subcontractor rules are in the workers’ comp section above.

When is the last frost in Virginia?

At the NOAA stations we list: Last frost mid-Mar (Norfolk) to late Apr (Blacksburg); first frost mid-Oct (Blacksburg) to late Nov (Norfolk). These are typical (50%) dates from the 1991–2020 climate normals, so about half of years still bring a 32°F night after the spring date.

This page is general information, not legal or tax advice. Rules change; the agencies and statutes linked above have the final word.

Virginia in each 50-state guide: Frost line depth · 811 dig laws · Retaining wall permits · Contractor licensing · Contractor deposit limits · Building codes · Planting zones · Mechanics lien deadlines · Workers' comp · Frost dates · Drainage laws · Noxious weed laws · Rainfall and snowfall · Landscaper pay · Pesticide applicator licensing · Landscaping sales tax · All state guides

Soil: Virginia’s most common soils, state soil, and how much ground is wet, clayey or shallow to bedrock by county. Virginia soil types

Last checked October 31 and November 1, 2026 against official state and local sources for this state. Rules change; your state agency or local building department has the final word. Spot something out of date? Email info@muthlerlandscaping.com and we’ll fix it.

Groundwork Design Co. · designed by builders

Plans drawn for Virginia’s rules

Groundwork Design Co. draws patios, walls, decks and planting plans to scale for any U.S. home, with the layout, sizes and materials any local contractor can price. Single-space plans start at $349; a framing and footing sheet for decks and porches is a $350 add-on.

See design plansSee sample plans

Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.

Cite as: Muthler Landscaping & Construction, “Virginia Building Codes, Permits and Contractor Rules,” https://muthlerlandscaping.com/state-guides/virginia/ (last checked November 12, 2026).