Working near energized circuits and tagging deactivated controls: OSHA 1926.416 and 1926.417

Quick answer: Under 1926.416(a)(1), an employer may not let an employee work close enough to an electric power circuit to contact it unless the circuit is deenergized and grounded or the employee is guarded by insulation or other effective means. Under 1926.417, any control that will be deactivated while employees work on equipment or circuits must be tagged, and the tag must clearly identify the specific equipment or circuit being worked on.

Excavators, trenchers, jackhammers and hand tools all meet buried and overhead electrical lines on landscape and site jobs. Sections 1926.416 and 1926.417 are two short parts of OSHA’s electrical subpart that deal with exactly that. This page covers them as shown on Cornell’s Legal Information Institute. Check the current CFR text at ecfr.gov before relying on any detail. For ground-fault protection and extension cord basics, see our job site electrical safety page.

Protection of employees: 1926.416(a)

Paragraph (a) has three parts. Part (a)(1) is the core rule: no employee may work close enough to an electric power circuit that they could contact it unless the circuit is deenergized and grounded, or the employee is guarded by insulation or other effective means. Part (a)(2) addresses buried lines: where the exact location of underground powerlines is unknown, employees using jackhammers, bars or other hand tools that could hit a line must be provided with insulated protective gloves. Part (a)(3) requires a check before work begins. The employer must determine whether any energized circuit, exposed or concealed, could bring a person, tool or machine into contact with it, by inquiry, direct observation or instruments. Where such a circuit exists, the employer must post and maintain proper warning signs and must tell employees where the lines are, what hazards they pose and what protective measures to take.

ParagraphRequirement
(a)(1)No work close enough to contact a power circuit unless it is deenergized and grounded or the employee is guarded
(a)(2)Insulated protective gloves where hand tools could hit underground lines of unknown location
(a)(3)Determine before work whether energized circuits are a hazard; post warning signs; tell employees
(b)(1)Barriers or guarding keep an electrical equipment workspace from being used as a passageway while energized parts are exposed
(b)(2)Keep working spaces and walkways clear of cords
(c)In existing installations, do not change circuit protection to allow a load greater than the wiring’s load rating
(d)Use special tools insulated for the voltage when fuses are installed or removed with one or both terminals energized
(e)No worn or frayed cords; extension cords not fastened with staples, hung from nails or suspended by wire

What the underground line rule means for excavation

The glove rule in (a)(2) applies only where the location of an underground line is unknown, and the text refers to tools that could hit a line. It does not say that gloves replace locating the line. In Pennsylvania, you also call 811 before you dig; see our PA One Call basics page. For machines working near overhead lines, the crane and power line rules in 1926.1408 are a separate standard, covered on our power line clearance page. Trench and excavation work has its own rules, covered on our excavation protective systems page.

Passageways, loads, fuses and cords: 1926.416(b) to (e)

Paragraph (b) says barriers or other guarding must keep an electrical equipment workspace from being used as a passageway while energized parts are exposed, and that working spaces, walkways and similar areas must be kept clear of cords so they do not create a hazard. Paragraph (c) says that in existing installations the circuit protection may not be changed to allow a load greater than the circuit wiring’s load rating, which is a reason not to swap a breaker or fuse for a bigger one to stop nuisance trips. Paragraph (d) says special tools insulated for the voltage must be used when fuses are installed or removed with one or both terminals energized. Paragraph (e) says worn or frayed cords or cables may not be used, and extension cords may not be fastened with staples, hung from nails or suspended by wire. A temporary power setup on a patio or wall job is the place where these rules most often matter.

Lockout and tagging of circuits: 1926.417

Section 1926.417 has three short paragraphs. Paragraph (a) says any control that will be deactivated while employees work on energized or deenergized equipment or circuits must be tagged. Paragraph (b) says deenergized equipment or circuits must be made inoperative, and tags must be attached at every point where they could become energized. Paragraph (c) says tags must clearly identify the specific equipment or circuit being worked on. The text says nothing about locks, so the section is about tagging as written. For general machine servicing, there is a separate general industry standard, which we describe on our lockout and tagout page; do not assume the two have identical requirements.

Practical checklist before work near circuits

  • Ask the owner and the utility where lines are, look for service drops and meter locations, and write down what you find.
  • Post warning signs where an energized circuit could be contacted, and brief every crew member on where the lines are and what to do.
  • Issue insulated gloves when hand tools could hit an unlocated underground line.
  • Inspect cords every day and remove any that are worn or frayed; hang or lay them so nobody trips.
  • Tag every deactivated control and every point where equipment could become energized, with the equipment named on the tag.
  • Never upsize a fuse or breaker to stop a trip.
Planning information only. This page summarizes public regulation text and is not engineering or legal advice. Electrical work should be done and supervised by qualified people. Check the current CFR text before relying on any detail here.

Sources

SourceUsed for
29 CFR 1926.416, General requirements (Cornell LII)Protection of employees, passageways, load ratings, fuses, cords
29 CFR 1926.417, Lockout and tagging of circuits (Cornell LII)Tagging of controls and circuits

Checked Nov. 23, 2026. Check the current CFR text at ecfr.gov before relying on details.

Related

Job site electrical safety · Hand and power tools · PA One Call basics · All PA site work regulations

Talk to us about your project

FAQ

Do gloves protect me when digging near buried lines?

Section 1926.416(a)(2) says insulated protective gloves must be provided where the exact location of underground powerlines is unknown and employees use tools that could hit a line. It does not replace locating the lines.

Can an extension cord be stapled to a wall?

No. Section 1926.416(e)(2) says extension cords may not be fastened with staples, hung from nails or suspended by wire.

What must a tag say when a circuit is shut off?

Section 1926.417(c) says tags must clearly identify the specific equipment or circuit being worked on, and (b) requires tags at every point where equipment could become energized.

Can I replace a fuse with a larger one to stop it tripping?

Section 1926.416(c) says that in existing installations circuit protection may not be changed to allow a load greater than the circuit wiring’s load rating.

General information only, not legal or safety advice. Employers must follow the current OSHA standard and applicable Pennsylvania rules. Source pages checked Nov. 23, 2026.