PA One Call basics: ordinary and design notice before you dig

Pennsylvania’s Underground Utility Line Protection Law, Act 287 of 1974 as amended, runs through the Pennsylvania One Call System (Pennsylvania 811). Ordinary notice goes in before digging starts. Design notice goes in while a project is still being designed. They are different notices with different timing, and digging is not permitted on a design notice.

General information only, not legal advice. The Act and the PA One Call Users Guide control, and the Users Guide says it is not a substitute for the Act. Confirm details with Pennsylvania One Call at 800-242-1776 or on its website.

Who has to call

According to the PA One Call Users Guide, for excavation work the person performing the excavation must make the notification. It adds that a homeowner should notify the One Call System only if they are performing the excavation work themselves. If a contractor is digging, the contractor places the notice. Even so, a homeowner is wise to ask the contractor for the ticket number and the lawful start date before anyone sets a shovel or machine in the ground.

Ordinary notice: the timing

Under Section 5(2.1) of Act 287, notification must be not less than three nor more than ten business days in advance of beginning excavation or demolition work. Section 1.1 of the Act describes the lawful start date as three business days through ten business days following notification to the One Call System. For a complex project, Section 5(2.1) says notification shall not be less than ten business days in advance.

The Users Guide defines a business day as any day except a Saturday, Sunday or legal holiday prescribed by statute. Its worked example: a notice placed on a Monday allows excavation to start on the third business day, Thursday. The Guide also says that if digging does not start within the notice dates, a new One Call notification must be placed. Starting before the lawful date is a violation, and the Guide says it can result in forfeiture of the excavator’s rights and protection.

Design notice: for planning, not digging

Section 4(2) of the Act lets a designer request line and facility information from the One Call System not less than ten nor more than ninety business days before final design is to be completed. Section 4(2.2) says designers submit a design notification through the One Call System when a design drawing is completed. The Users Guide says plainly that digging is not permitted on a design notification. A design notice is how a designer learns where utilities are so the drawings avoid them. Section 4(4) asks the designer to maintain an eighteen-inch clearance of the facility owner’s facilities if no easement restriction exists.

NoticeWhenCan you dig?
Ordinary (routine excavation)3 to 10 business days before excavation or demolition; at least 10 for a complex projectYes, after the lawful start date
Design10 to 90 business days before final design is completedNo
EmergencyA sudden or unforeseen occurrence involving clear and immediate danger to life, property or the environmentSee the Act; the Guide says the facility owner will respond to the site within 2 clock hours

Marks and the tolerance zone

The Act defines the tolerance zone as the horizontal space within eighteen inches of the outside wall or edge of a line or facility. The Users Guide says marks must be placed within eighteen inches horizontally of the line, that white marks show the proposed excavation, and it recommends 12-inch dashed white lines. For trouble locates, excavators must use due care and prudent techniques to identify and protect the facility during excavation, which may include hand-dug test holes.

If you hit a line

The Users Guide says to call the One Call System or the facility owner immediately after damage. For a release of flammable, toxic or corrosive gas or liquid, it says to notify 911 and the facility owner immediately, as Section 5 clause (8) requires.

How this connects to OSHA

OSHA’s excavation standard separately requires that the location of underground installations be determined prior to opening an excavation (29 CFR 1926.651(b)). See OSHA trench protection basics.

Sources

Related

All Pennsylvania site work regulations · OSHA trench protection basics · Easement

Get a quote

FAQ

How many business days before digging do I call PA One Call?

Section 5(2.1) of Act 287 says notification shall be not less than three nor more than ten business days in advance of beginning excavation, and not less than ten business days for a complex project.

Do I have to call if my contractor is doing the digging?

The PA One Call Users Guide says the person performing the excavation must make the notification, and that a homeowner should notify only if they are performing the excavation themselves.

What is a design notice?

A design notice is filed while a project is being designed, not dug. Section 4(2) provides for a request not less than ten nor more than ninety business days before final design is to be completed. The Users Guide says digging is not permitted on a design notification.

How close can digging get to a marked line?

The Act defines the tolerance zone as the horizontal space within eighteen inches of the outside wall or edge of a line or facility. In that area the Users Guide calls for due care and prudent techniques, such as hand-dug test holes.

General information only. This page does not state or imply that any company complies with these rules, and it is not legal advice. Act 287 and Pennsylvania One Call control. Sources checked Nov 23, 2026.