Excavation protective systems: sloping, benching and soil types under 1926.652
Quick answer: Under 29 CFR 1926.652, every employee in an excavation must be protected from cave-ins by a protective system, unless the excavation is entirely in stable rock or is less than 5 feet deep and a competent person finds no potential for a cave-in. The simplest sloping option is no steeper than 1.5 horizontal to 1 vertical, and other slopes depend on whether the soil is Type A, B or C.
What the rule requires
Section 1926.652 is part of Subpart P, the OSHA excavation standard. Paragraph (a) says each employee in an excavation must be protected from cave-ins by an adequate protective system designed under paragraph (b) or (c). Two exceptions exist: excavations made entirely in stable rock, and excavations less than 5 feet deep where a competent person has examined the ground and found no potential for a cave-in. The protective system must resist, without failure, all loads that are intended or could reasonably be expected to be applied or transmitted to it. This page covers the rule for sloping and benching in detail and summarizes support and shield systems at a high level. It also builds on our page about trench protection basics and the competent person for excavations.
The four sloping and benching options, paragraph (b)
| Option | How it works |
|---|---|
| 1, (b)(1) | Slope no steeper than 1.5 horizontal to 1 vertical (34 degrees from horizontal), excavated to match the Type C configurations in Appendix B |
| 2, (b)(2) | Use the maximum slopes and configurations determined under Appendices A and B |
| 3, (b)(3) | Use written tabulated data (tables or charts) that identify the parameters, the limits of use and the approving registered professional engineer; a copy stays at the jobsite while the work is under way |
| 4, (b)(4) | A design approved by a registered professional engineer, with the safe slopes, configurations and the engineer’s identity in writing and a copy at the jobsite |
Option 1 is the easy default because it needs no soil classification. If the crew wants steeper walls to save digging and backfill, it must classify the soil under Appendix A and use Option 2, or bring in tabulated data or an engineer.
Classifying soil, Appendix A
A competent person classifies each soil deposit using at least one visual and one manual analysis. A layered system is classified by its weakest layer, and the soil is reclassified if conditions change. The appendix sorts soil into three types in decreasing stability.
- Type A: cohesive soil with an unconfined compressive strength of 1.5 tons per square foot or more, including cemented soils such as caliche and hardpan. Soil is not Type A if it is fissured, subject to vibration, previously disturbed, part of a layered system sloping into the excavation at 4 horizontal to 1 vertical or steeper, or affected by other factors that call for a less stable class.
- Type B: cohesive soil with strength greater than 0.5 but less than 1.5 tons per square foot, granular cohesionless soils such as angular gravel, silt, silt loam and sandy loam, previously disturbed soils that do not qualify as Type C, fissured or vibrated Type A soil, and dry rock that is not stable.
- Type C: cohesive soil with strength of 0.5 tons per square foot or less, granular soils such as gravel, sand and loamy sand, submerged soil or soil with freely seeping water, and material in a layered system dipping into the excavation at 4 to 1 or steeper.
Manual tests include rolling a moist sample into a 1/8-inch thread at least 2 inches long to check for cohesion, noting whether dry soil crumbles or forms hard clumps, and the thumb test: Type A soil can barely be dented by a thumb, while Type C can be penetrated several inches. A pocket penetrometer or hand shearvane gives strength readings.
Maximum allowable slopes for excavations 20 feet or less, Appendix B
| Soil type | Simple slope, horizontal to vertical |
|---|---|
| Type A | 3/4 to 1 (1/2 to 1 if short term and 12 feet deep or less) |
| Type B | 1 to 1 |
| Type C | 1 1/2 to 1 |
Short term means open 24 hours or less. The actual slope may not be steeper than the maximum allowable slope. If there are signs of distress, the slope must be cut back to at least 1/2 horizontal to 1 vertical less steep than the maximum. Where stored material, equipment or traffic adds surcharge load, a competent person decides how much flatter to cut it. Appendix B also allows benching and sloped excavations with a vertically sided lower portion that is supported or shielded. Check the current CFR text for the full slope table and the figures for benches and layered soils before relying on them.
Support systems, shields and removal
Paragraph (c) offers four design options for support, shield and other protective systems: Appendix A and C timber shoring or manufacturer tabulated data for aluminum hydraulic shoring, manufacturer tabulated data used strictly to the manufacturer’s limits, other written tabulated data, or a design approved by a registered professional engineer. Materials and equipment must be free of damage that could impair their function, and damaged items are examined by a competent person, who decides whether they are suitable for continued use.
Installation and removal have their own rules in paragraph (e). Support members must be securely connected to prevent sliding, falling or kickouts. Members must not be loaded beyond their design limits. Removal begins at the bottom and progresses upward, with members released slowly, while backfilling keeps pace. In a trench, the excavation may extend no more than 2 feet below the bottom of the support only if the system is designed for the full depth and there are no signs of soil loss. Paragraph (f) bars employees from working on faces of sloped or benched excavations above other employees unless the lower workers are protected from falling, rolling or sliding material. Paragraph (g) limits shield loading and bars employees from being inside a shield while it is installed, removed or moved vertically.
Practical steps
- Have a competent person classify the soil before the first cut, and again after rain or other changes.
- Pick sloping, shoring or a shield before digging, and keep any required engineer or manufacturer data at the jobsite.
- Keep spoil, equipment and traffic back from the edge, and cut slopes flatter where they add load.
- Do not work above another person on a sloped face unless the person below is protected.
- Call 811 before digging; see our PA One Call page.
Sources
- eCFR, 29 CFR 1926.652, Requirements for protective systems
- eCFR, Appendix A to Subpart P, Soil classification
- eCFR, Appendix B to Subpart P, Sloping and benching
Sources checked Nov. 23, 2026.
Related
OSHA trench protection basics · Competent person for excavations · Fall protection duty, 1926.501 · All PA site work regulations
FAQ
When is a protective system not required in an excavation?
Only when the excavation is made entirely in stable rock, or is less than 5 feet deep and a competent person’s examination shows no potential for a cave-in.
What is the simplest allowed slope for an excavation?
Option 1 allows a slope no steeper than 1.5 horizontal to 1 vertical, or 34 degrees from horizontal, matching the Type C configurations in Appendix B.
What are the maximum simple slopes for Type A, B and C soil?
For excavations 20 feet or less, Appendix B lists 3/4 to 1 for Type A, 1 to 1 for Type B and 1 1/2 to 1 for Type C.
Who classifies the soil?
A competent person classifies each deposit using at least one visual and one manual analysis, and reclassifies if conditions change.