Guides · Retaining wall installation · Step 9
Steps in a retaining wall and stepping up the base
Two jobs share one page: stepping the base up a sloped site so the wall stays level in every course, and building stairs through a wall. Allan Block publishes the most detail on both. Belgard covers the step-up rule.
Start at the lowest point and step the base up in level increments. Belgard steps up in 6 to 8 in. increments. For stairs, Allan Block uses an 8 in. rise and 12 in. run on steep slopes, a first riser no taller than 8 in., and a base of at least 6 in. under each riser. Check local code for stairs.
Stepping up the base
Both Belgard and Allan Block start at the lowest elevation. Each level section is built and compacted before you step up.
Belgard steps the leveling pad up in 6 to 8 in. increments from the lowest elevation. Allan Block does not state a fixed increment in the pages reviewed.
Allan Block says each step-up block must be completely buried. Compact the base with at least two passes. See trench and leveling pad.
Building stairs through a wall
Allan Block uses 8 in. rise and 12 in. run on steep slopes. The first riser is no taller than 8 in. Stair width is not specified in the pages reviewed.
Allan Block calls for at least 6 in. of base under each riser, extending 6 in. behind the block, compacted with at least two plate passes. Wall rock goes 12 in. behind the blocks, in lifts of 8 in. or less.
Allan Block fastens rigid treads with high-strength construction adhesive and says the drain pipe behind the stairs runs uninterrupted. It also says no salt on the blocks. See drain pipe and outlets.
Numbers by source
| Item | Figure | Source |
|---|---|---|
| Base step-up increment | 6 to 8 in. | Belgard |
| Stair rise / run (steep slope) | 8 in. / 12 in. | Allan Block |
| First riser | 8 in. or less | Allan Block |
| Base under each riser | At least 6 in., extending 6 in. behind block | Allan Block |
| Wall rock behind blocks | 12 in., lifts of 8 in. or less | Allan Block |
| Slope below the wall | Contact a local engineer | Allan Block |
Questions
How do you build a retaining wall on a slope?
Start at the lowest point and step the base up in level sections. Belgard steps up in 6 to 8 in. increments, and Allan Block says each step-up block is fully buried.
What rise and run do wall stairs use?
Allan Block uses an 8 in. rise and 12 in. run on steep slopes, with a first riser of 8 in. or less. Local code may set other limits.
Can I use salt on block stairs?
Allan Block says no salt on its blocks. See our deicers and warranties page for related paver guidance.
How wide should the stairs be?
The pages reviewed do not give a stair width. Check local code and your block maker.
Sources: Allan Block, Stairs in a Retaining Wall; Allan Block, Stepping Up the Base; Belgard SRW Quick Reference Install Guide (2023). Checked Nov. 22, 2026.
Muthler Landscaping & Construction · Lock Haven, PA
Need a wall built in central PA?
We build segmental retaining walls from the base up. If your job is in our area, we can walk the site and quote it.
Get a quoteAll guidesMuthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.