Home / Guides / How long home projects take / How long does siding installation take
Timeline guide · 2026 · central PA planning ranges
How long does siding installation take?
James Hardie says a typical tear-off and siding installation project may take 7 to 14 days. Modernize says approximately 10 to 14 days, Angi says one to two weeks on average, and HomeGuide lists fiber cement at 7 to 14 days on average. Painting adds days: a few, per Modernize, or 4 to 5+, per HomeGuide. These sources agree closely, but they cover different siding types and scopes, so each source’s figures are shown separately.
What the timeline looks like
| Source | Typical time | Old siding removal | New siding installation | Painting |
|---|---|---|---|---|
| James Hardie (manufacturer) | 7 to 14 days, tear-off and installation | Not published separately | Not published separately | Not published as days |
| Modernize | Approximately 10 to 14 days | Not published | Not published | A few additional days |
| Angi | One to two weeks on average | 1 to 5 days | 5 to 14 days | Not published |
| HomeGuide, fiber cement only | 7 to 14 days on average | Not published | Not published | 4 to 5+ days for pre-primed siding |
Sources: James Hardie, What to Expect During Your Siding Project (jameshardie.com/blog/what-to-expect-during-your-siding-project), by Mark Petersen, Jan 23, 2024; James Hardie is a siding manufacturer. Modernize, What to Expect During Your Siding Installation (modernize.com/homeowner-resources/siding/expect-during-siding-installation), updated Aug 12, 2026. Angi, how long siding takes to install (angi.com/articles/how-long-siding-takes-to-install.htm), no update date shown. HomeGuide, fiber cement siding cost guide (homeguide.com/costs/fiber-cement-siding-cost), no update date shown. All checked Nov 24, 2026. Angi’s removal and installation ranges add up to more than its overall one-to-two-week figure, so treat the phase ranges as outer limits. General sourced timelines, not a Muthler schedule or promise.
By material and house size
| Factor | What the sources say |
|---|---|
| Vinyl | Angi: the fastest to install, since it is lightweight and easy to cut. No figure published |
| Wood, fiber cement, stone veneer | Angi: more complex and slower than vinyl, no figures. HomeGuide: fiber cement takes 7 to 14 days on average, and fiber cement shingles typically take longer than planks or panels, no figure |
| House size | Angi: if the home is larger than 2,500 square feet, expect a longer installation unless the job is a partial replacement; no day counts by size. Modernize: size, number of stories and terrain affect the timeline. HomeGuide: size-based timelines not published |
Same sources and check date as above. No source reviewed publishes day counts by house size or by siding material other than fiber cement.
Step by step
| Phase | What happens | Typical time, by source |
|---|---|---|
| Planning, materials and permits | Selections, ordering, any permit | Angi: can start several weeks before installation, since obtaining materials and permits may take some time. No day count |
| Homeowner prep and delivery | Clear the exterior, move vehicles; dumpster and siding arrive | James Hardie: the dumpster and new siding are sometimes delivered a day or two before the crew arrives. Modernize lists prep tasks but gives no time estimate |
| Old siding removal | Tear-off; the crew checks the wall for water damage or rot | Angi: one to five days, depending on how complex the removal is and how extensive any underlying damage is |
| Repairs and wall preparation | Sheathing and rot repairs before new siding goes on | Modernize says sheathing repair needs additional time but gives no figure. Angi says water damage, mold, pest damage and rot must be repaired first, no figure |
| Weather barrier or insulation | House wrap installed or replaced; insulation where included | James Hardie lists the weather-resistive barrier, also called house wrap; Modernize lists insulation installation. Neither gives a time |
| New siding and trim | The main installation | Angi: five to 14 days, the most time-consuming part. James Hardie counts it within its 7 to 14 days |
| Painting, if needed | Paint after installation for siding that is not prefinished | Modernize: a few additional days. HomeGuide: 4 to 5+ days for pre-primed fiber cement |
| Inspections and cleanup | Building inspection where required, debris removal | James Hardie: there may be downtime waiting for building inspections. No figure |
Same sources and check date as above. General sourced timelines, not a Muthler schedule or promise.
What stretches the schedule
- Angi says larger homes and complex designs that need custom cuts take longer.
- Modernize lists home size, number of stories and terrain; James Hardie lists house size.
- Angi lists water damage, mold, pest damage and rot that must be repaired before new siding goes on.
- Modernize adds asbestos and damaged sheathing as unforeseen problems that can extend the timeline.
- James Hardie says unexpected repairs are made after the old siding is off.
- Angi says heat, cold, rain or snow can delay installation.
- James Hardie lists bad weather, painted versus prefinished siding, and downtime waiting for building inspections.
- Angi says doing it yourself can take significantly longer than hiring a contractor.
What shortens it
Angi lists choosing vinyl, replacing only part of the siding instead of the whole house, and scheduling work for mild weather. James Hardie’s list of timing factors includes whether the siding is prefinished or needs painting, which both Modernize and HomeGuide say adds days. HomeGuide says fiber cement does not expand and contract with temperature as much as other siding materials, so its installation season is longer, and that companies may offer a better deal for off-season scheduling.
Pennsylvania timing
Season. Modernize says the short answer on the best time to replace siding is often fall, that most homeowners get new siding in spring and summer, and that siding companies tend to be quieter in the fall. It also says it is not ideal to install vinyl siding during a freeze or when temperatures drop below about 50 degrees, because cold makes panels contract, so they can be nailed on too tight, and makes vinyl more brittle. A separate Modernize article (updated Sept. 3, 2026) says winter installation is not impossible, recommends spring or fall for more stable temperatures, and advises an experienced contractor if winter work is unavoidable. Angi recommends mild weather with no precipitation in the forecast and says a house can sit without siding for only a limited time, without giving a figure. See our guide to building in winter in Pennsylvania.
Permits and inspections. The state’s list of work that needs no UCC permit, 34 Pa. Code 403.62(c) as published by Cornell LII, does not name siding. Section 403.62(d) says an ordinary repair does not require a permit and excludes work such as cutting away a load-bearing wall or adding or relocating piping or electrical wiring. Whether your siding job needs a permit is a question for your local code office. If a permit application is filed, 34 Pa. Code 403.63 says the code official must grant or deny it within 15 business days, or within 5 business days with a design professional’s certification, or it is deemed approved. James Hardie notes that some municipalities may require a dumpster permit and that there may be downtime waiting for building inspections. Pennsylvania’s update to the 2021 International Codes took effect Jan. 1, 2026 (JensenHughes code alert, Dec. 3, 2025). Confirm with your local code office which edition and local rules apply. See our pages on residential permit exemptions and work that does not need a UCC permit.
Digging and contracts. If any part of your siding job involves digging, such as drainage for downspouts, homeowners and contractors must call 811 at least three business days before any digging or excavation project, per the PA Public Utility Commission. See our 811 guide. The Pennsylvania Attorney General’s Home Improvement Consumer Protection Act FAQ (last modified June 25, 2026) says contractors must register, with an exemption for those who perform less than $5,000 worth of home improvements in a calendar year, that the registration number goes in advertisements, contracts, estimates and proposals, and that contracts for more than $500 must be written and signed by the consumer and the contractor.
Questions to ask a contractor about schedule
- What is the start date, how many crew members, and how many days on site?
- How is the schedule affected if rot or sheathing damage turns up?
- Which siding is priced, and is it prefinished or painted after installation?
- When do the siding and dumpster arrive, and who handles any dumpster permit?
- What is the minimum temperature for installing the product you chose?
- Who schedules building inspections, if required?
- Is the contractor registered with the Attorney General, with the number on the contract?
Compare timelines and costs
Siding is often planned with other exterior work, so see how long window replacement takes and how long a home addition takes, which includes exterior finishing. For prices, see our siding replacement cost, window replacement cost and gutter installation cost guides. Modernize suggests discussing shutters, downspouts and caulking with the contractor before the project starts.
Questions
How long does siding installation take?
James Hardie says a typical tear-off and installation project may take 7 to 14 days. Modernize says approximately 10 to 14 days, and Angi says one to two weeks on average.
How long does it take to remove old siding?
Angi says one to five days, depending on how complex the removal is and how extensive any underlying damage is.
How long does the new siding take once the old siding is off?
Angi says five to 14 days and calls it the most time-consuming part of the process.
How much time does painting add?
Modernize says painting adds a few additional days. HomeGuide says pre-primed fiber cement needs painting after installation, which can add 4 to 5+ days.
How long does fiber cement siding take to install?
HomeGuide says 7 to 14 days on average, and that fiber cement shingles typically take longer than planks or panels. Angi says fiber cement is slower to install than vinyl but gives no figure.
Can siding be installed in winter?
Modernize says it is not ideal to install vinyl siding during a freeze or below about 50 degrees, but not impossible, and recommends spring or fall for more stable temperatures. Angi recommends mild weather with no precipitation in the forecast.
Does siding replacement need a permit in Pennsylvania?
The state’s list of work that needs no UCC permit, 34 Pa. Code 403.62(c), does not name siding, and 403.62(d) says an ordinary repair does not require a permit, with exceptions. Confirm with your local code office. James Hardie notes some municipalities may require a dumpster permit.
General sourced timelines only, not a Muthler schedule or promise. Actual schedules depend on your house, siding, season and contractor. Sources, checked Nov 24, 2026: James Hardie, What to Expect During Your Siding Project (Jan 23, 2024); Modernize, What to Expect During Your Siding Installation (updated Aug 12, 2026), Best Time for Siding Replacement (updated Aug 12, 2026) and Vinyl Siding vs Frigid Temperatures (updated Sept 3, 2026); Angi, how long siding takes to install (no update date shown); HomeGuide fiber cement siding cost guide (no update date shown); Cornell LII, 34 Pa. Code 403.62 and 403.63; JensenHughes code alert on Pennsylvania’s adoption of the 2021 I-Codes (Dec 3, 2025); PA Attorney General, Home Improvement Consumer Protection Act FAQ page (last modified June 25, 2026); PA Public Utility Commission, PA One Call (no update date shown). Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.