Timeline guides · 2026 · central PA planning
How long home projects take
Ten timeline guides for the projects homeowners ask about most. Each one puts the durations that HomeGuide, Angi, Fixr, Modernize, manufacturers and trade sources publish side by side, walks through the order of work, and adds Pennsylvania permit, 811 and season notes. Where no source publishes a number, the guide says so instead of guessing.
Call (570) 397-9800Get a free estimateCost guidesOutdoor and site work
Crew days, design and permit lead times, utility marks and when you can use the patio.
Sources range from a couple of days to 1 to 3 weeks.
1 to 3 days for concrete or asphalt and 3 to 10 for pavers, per the sources, plus cure times.
Under a week to 3 weeks of building, plus permits.
2 to 4 days for a crew, or 20 to 35 hours for 150 to 200 feet.
House and structure
Angi lists 2 to 12 months by type; Fixr says 2 to 3 months.
Modernize says 1 to 7 days for most repairs; Fixr lists 2 to 6 weeks for underpinning.
James Hardie and HomeGuide say 7 to 14 days; Angi says 1 to 2 weeks.
About 30 to 60 minutes per window, but Angi says 4 to 15 weeks overall.
Angi and Remodeling.com list 5 to 8 weeks for one- and two-car builds.
What every guide covers
- Duration by size or type, with each source’s own figure.
- The order of work, phase by phase.
- What stretches the schedule and what shortens it.
- Curing, drying and use-ready times where they apply.
- Permit and inspection timing, with a note to confirm with your local code office.
- The three-business-day 811 notice and season notes.
General sourced timelines, not a Muthler schedule or promise. Actual schedules depend on your site, soil, season, permits and contractor. For prices, see our cost guides. Sources are named on each guide and were checked Nov 24, 2026. Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.